BILL OF QUANTITY

( B. O. Q )

PEKERJAAN

REHAB SURAU SULUK BENTENG 7 LAPIS DALU-DALU (1 KEGIATAN)

PROGRAM

PENINGKATAN SARANA DAN PRASARANA APARATUR

L O K A S I

KECAMATAN TAMBUSAI

NILAI HPS

PEMERINTAH DAERAH KABUPATEN ROKAN HULU

PASIR PENGARAIAN

Rp.

199.789.000,-DINAS TATA RUANG DAN CIPTA KARYA

KABUPATEN ROKAN HULU

(2)

REKAPITULASI PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR KEGIATAN : PEMBANGUNAN GEDUNG SOSIAL KEMASYARAKATAN

PEKERJAAN : REHAB SURAU SULUK BENTENG 7 LAPIS DALU-DALU (1 KEGIATAN) LOKASI : KECAMATAN TAMBUSAI

URAIAN KEGIATAN JUMLAH

I PEKERJAAN PENDAHULUAN -

II PEKERJAAN STRUKTUR -

III PEKERJAAN DINDING -

IV PEKERJAAN PENUTUP ATAP -

V PEKERJAAN INSTALASI LISTRIK -

VI PEKERJAAN LANTAI -

VII PEKERJAAN PINTU -

VIII PEKERJAAN KUNCI DAN PENGGANTUNG -

IX PEKERJAAN INSTALASI AIR / SANITAIR -

X PEKERJAAN PENGECATAN - XI PEKERJAAN FINISHING - JUMLAH - - TOTAL - DIBULATKAN - CV/PT/FIRMA………. A Z W I R, BE NIP. 19550425 198003 1 015

Ir. H. HAFITH SYUKRI, MM

(Rp)

PPn 10 %

Terbilang : Seratus sembilan puluh sembilan juta tujuh ratus delapan puluh sembilan ribu rupiah

……….,………. 2011

Diperiksa Oleh ; Disusun Oleh :

Kabid. Cipta Karya

(Nama Jelas) Jabatan

Diketahui/Disetujui Oleh : Kadis. Tata Ruang dan Cipta Karya

(3)

RENCANA ANGGARAN BIAYA PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR KEGIATAN : PEMBANGUNAN GEDUNG SOSIAL KEMASYARAKATAN

PEKERJAAN : REHAB SURAU SULUK BENTENG 7 LAPIS DALU-DALU (1 KEGIATAN) LOKASI : KECAMATAN TAMBUSAI

NO URAIAN PEKERJAAN VOLUME HARGA JUMLAH

SATUAN (RP) I PEKERJAAN PENDAHULUAN 1 1.000 Ls - - 2 1.000 Ls - - 3 15.500 M¹ - - - II PEKERJAAN STRUKTUR 1 2.747 M3 - - 2 0.916 M3 - - 3 0.680 M3 - - 4 0.680 M3 - - 5 8.925 M² - - 6 0.325 M3 - - 7 0.765 M3 - - 8 9.690 M2 - - - III PEKERJAAN DINDING

1 452.657 M2 - -

2 0.761 M³ - -

3 0.408 M³ - -

4 905.314 M2 - -

- IV PEKERJAAN PENUTUP ATAP

1 1.876 M3 - - 2 163.180 M² - - 3 2.7721 M³ - - 4 1.71 M³ - - 5 32.400 M² - - 6 1.000 Ls - - 7 118.600 M² - - 8 262.300 M² - - 9 196.600 M² - - - V PEKERJAAN INSTALASI LISTRIK

1 11.000 - - 2 11.000 - - 3 8.000 - - 4 11.000 - - - VI PEKERJAAN LANTAI 1 0.916 M3 - - 2 1.275 M3 - - 3 4.858 M3 - - 6 9.000 M2 - - 7 31.480 M' - - 8 31.480 M' - - -

Pembina Utama Muda NIP. 19620518 198911 1 001

(Rp)

Pek. Pasang Papan Nama Proyek Pek. Pembongkaran

Pek. Pemasangan Bowplank

Jumlah

Pek. Galian Tanah Pondasi Pek. Urugan Tanah Bekas Galian Pek. Urugan Pasir Bawah Pondasi Pek. Lantai Kerja Cor K100 Pek. Pondasi Pas 1 Bata 1:4

Pek. Pondasi Plat Setempat Bt Bertulang K150 Pek. Cor sloof 13/15 bt. bertulang K 150 Pek. Raben Pondasi 1:4

Jumlah

Pek. Pas Dinding Bata 1:4

Pek. Cor Kolom 13/15 Bt Bertulang k150 Pek. Cor Reng Balok 13/15 Bt Bertulang k150 Pek. Plesteran Dinding 1:4

Jumlah

Pek. cor Atap Dag

Pek. Pas Atap seng gelombang BJLS 20 K Pek. Kuda-Kuda Kayu 6/12

Pek. Gording kayu 5/10 Pek. Perabung Pek. Kubah

Pek. Pas Papan Risplank Pek. Pas Plafond Pliwood 3 mm Pek. Pas List Profil

Jumlah

Pek. Pas Titik Lampu Ttk

Pek. Pas Saklar Ttk

Pek. Pas Titik Stop Kontak Ttk Pek. Pas Lampu Pijar 20 Watt Bh

Jumlah

Pek. Urugan Tanah Bawah Lantai Pek. Urugan Pasir Bawah Lantai Pek. Cor Lantai kerja 1:3:5

Pek. Pas Lantai Keramik 20 x 20 KM/WC Pek. Pas Dinding Keramik 20 x 25 Pek. Bon-bon Keramik

(4)

NO URAIAN PEKERJAAN VOLUME HARGA JUMLAH SATUAN (RP)

VII PEKERJAAN PINTU

1 43.900 M² - - 2 0.659 M3 - - 3 0.060 M3 - - 4 0.052 M3 - - 5 0.415 M³ - - 6 0.148 M³ - - 7 4.000 - - 8 6.280 M² - - - VIII PEKERJAAN KUNCI DAN PENGGANTUNG

1 13.000 - - 2 26.000 - - 3 26.000 - - 4 32.000 - - 5 32.000 - - - IX PEKERJAAN INSTALASI AIR / SANITAIR

1 4.000 - - 2 4.000 - - 3 43.200 M' - - 4 31.000 - - 5 18.000 M' - - 6 1.000 Unit - - 8 14.820 M' - - 9 Floor Drain Ø 10 cm 8.000 - - - X PEKERJAAN PENGECATAN 1 905.314 M2 - - 2 26.800 M2 - - 3 44.474 M2 - - 4 96.900 M2 - - 5 98.000 M2 - - - XI PEKERJAAN FINISHING 1 1.000 Ls - - - (Rp)

Pek. Pas Pintu Dan Jendela Pek. Kusen Jendela Pek. Kusen Ventilasi Pek. Kusen Pintu P1 Pek. Kusen Pintu P2 Pek. Kusen Pintu P3

Pek. Pintu Fiber Komplit Bh

Pek. Pas Kaca Tebal 3 mm

Jumlah

Pek. Pas Kunci Tanam Bh

Pek. Pas Engsel Pintu 4" Bh

Pek. Pas Grendel Pintu Bh

Pek. Pas Engsel Jendela Bh

Pek. Pas Grendel Jendela Bh

Jumlah

Pek. Pas Bak Air Fiber Bh

Pek. Pas Closet Jongkok Bh

Pek. Pas Pipa PVC 3/4" + accessories

Pek. Kran Air tembok 1/2" Bh Pek. Pas Pipa PVC 4" + accesories

Pek. Septictank + Peresapan Pek. Grill besi 2cm T: 3 mm

Pek. Bh

Jumlah

Pek. Cat Air Dinding Beton Pek. Cat Air Plafond Dag

Pek. Cat Minyak Konsen dan Ventilasi Pek. Cat Minyak Lisplank

Pek. Cat Minyak List Profil

Jumlah

Pek. Pembersihan Akhir

(5)

DAFTAR HARGA SATUAN UPAH KERJA

NO 1 OH 2 Oh 3 Oh 4 OH 5 OH 6 OH 7 OH 8 OH 9 OH 10 OH 11 OH 12 OH

DAFTAR HARGA SATUAN MATRIAL

NO

1 Air liter 2 3 4 5 6 7 8 Kg 9 10 11 m3 12 m3 13 BBM 14 15 kg 16 kg 17 kg 18 kg 19 kg 20 m 21 kg 22 kg 23 m 24 kg 25 kg 26 kg 27 kg 28 m' 29 Kg

Uraian Satuan Harga Satuan ( Rp )

Pekerja Tukang Gali Tukang Cat Tukang Tukang batu Tukang batu/pipa Tukang besi

Tukang besi konstruksi Tukang kayu

Kepala tukang Tukang las Mandor

Jam kerja efektif untuk tenaga kerja diperhitungkan 5 jam per-hari.

Uraian

Satuan

Harga Satuan

Rp

Alang - alang ikat

Ampelas Lbr

Bak Fiberglass bh

Bambu Ø 6 - 8 / 600 cm btg

Bata berongga ekspose Buah

Bata merah buah

Batu Apung Batu belah m3 Batu belah 15 cm/20 cm m3 Batu Belah 5 / 20 Batu Belah 5 / 7 Ltr bekisting/spacer Besi angkur ö=8 mm Besi baja IWF Besi beton

Besi beton (polos/ulir) Besi beton polos Besi lis kaca (1 x 1) cm Besi plat baja

Besi profil Besi scuare tube Besi siku L 30.30.3 Besi strip

Besi strip tebal 5 mm Bon-Bon Keramik Bilik bambu Cat Tembok

 

Mandor OH 0,075  

(6)

30 Kg 31 Kg 32 Kg 33 Kg 34 Kg 35 Kg 36 Kg 37 38 Door Closer 39 Door Holder 40 Door Stop 41 42 43 44 Floor Drain 45 46 47 48 49 50 51 M2 52 53 54 55 56 57 58 Gypsum board 59 60 Hollow Block 10 61 Hollow Block 15 62 Hollow Block 20 63 kg 64 m2 65 m2 66 m2 67 m2 68 m2 69 m2 70 m2 71 m2 72 m2 73 74 Kg 75 76 kg 77 kg 78 Kg 79 kg 80 kg Cat Antara Cat Dasar Cat Kayu glotek Cat Meni Cat Penutup Dempul Dempul Jadi Dolken Kayu Ø 8 - 10/400 cm btg Bh Bh Bh Engsel Angin Bh Engsel Jendela Bh Engsel Pintu Bh bh Formika Lembar Genteng Aspal lbr Genteng Beton lbr

Genteng Bubung Kodok bh

Genteng Bubung Palentong bh

Genteng Kodok bh

Genteng Metal

Genteng Palentong bh

Genteng Palentong Super bh

Genteng Sirap lbr Grendel Pintu bh Grendel Jendela bh Gymfloor m2 Lembar Handel Jendela bh Buah Buah Buah Ijuk

Jendela nako (rangka + kaca 5 mm) Kaca Buram Kaca Cermin 5 mm Kaca Cermin 8 mm Kaca Patri Kaca Polos 3 mm Kaca Polos 5 mm Kaca Polos 8 mm Kaca Wireglass Kait Angin Bh Kapur Sirih Karpet m2 Kawat beton Kawat diameter 4 mm Kawat Duri kawat las Kawat las listrik

(7)

81 82 83 84 85 86 87 m3 88 m3 89 90 91 92 93 94 95 96 97 98 99 kg 100 101 kg 102 103 104 105 106 107 108 109 110 kg 111 kg 112 kg 113 114 m’ 115 Kg 116 Kg 117 Lt 118 Liter 119 Kg 120 Liter 121 122 123 m2 124 125 126 127 128 kg 129 kg 130 kg Kawat nyamuk m2

Kayu Kelas I ( Kulim ) m3

Kayu kelas II Papan m3

Kayu kelas II balok m3

Kayu kelas III m3

Kayu kelas III (papan) m3

Kayu Papan 3 / 20 borneo Kaso Kayu Kelas II

Keramik 20x20 cm Buah

Keramik 20x25 cm Buah

Keramik 30x30 cm Buah

Keramik 40x40 cm Buah

Keramik 50x50 cm Buah

Kloset Duduk / Monoblok bh

Kloset Jongkok Porselen bh

Kloset Jongkok Teraso bh

Kapur padam m3

Kerikil Saring m3

Kerikil Saring ( kg )

Koral Beton / Split ( 2- 3 cm, 3-5 cm ) m3

Koral Beton / Split ( 2- 3 cm, 3-5 cm ) Kg

Kran Air bh

Kuas Bh

Kunci Lemari Bh

Kunci Tanam bh

Kunci Silinder Bh

Kunci Tanam Antik Bh

Kunci Tanam Biasa Bh

Kunci Tanam Kamar Mandi Bh

Lem Lem kayu Lem vinyl

List kayu 2/4 m3

List kayu profil Meni ( Read Lead ) A Meni ( Read Lead ) B Meni Besi Minyak bekisting Minyak Cat Minyak pelumas Mosaik Buah Nok Paten lbr Nok standar 40 cm 18, swg 22

Nok Stel rata lbr

Nok Genteng Beton lbr

Nok Genteng Metal lbr

Nok Pinggir Genteng Metal lbr

Paku Biasa Paku Triplek Paku Atap

(8)

131 kg 132 Kg 133 kg 134 135 kg 136 137 kg 138 Parquet m2 139 m3 140 kg 141 m3 142 Kg 143 m3 144 145 146 Thinner 147 m3 148 Kg 149 m' 150 m' 151 m' 152 m' 153 m' 154 m' 155 m' 156 m' 157 158 Kg 159 Plastic Aerator 160 161 162 163 164 Plywood 4 mm 165 Plywood 9 mm 166 167 168 Portland Cement kg 169 m 170 m’ 171 m 172 173 174 175 176 Lt 177

178 Roof Light Fiberglass

179 Kg

180 Seal tape

181 Sealant Tube

Paku Hak Pnjang 15 cm Paku Pancing 60 x 230 Paku skrup

Paku skrup 1 cm – 2,5 cm Buah

Paku skrup 10 cm Paku Skrup 3.5" bh Paku skrup 5 cm Pasir beton Pasir beton ( kg ) Pasir Pasang Pasir Silika Pasir urug Pelitur Ltr Pelitur Jadi Ltr Ltr Perancah Kayu Perekat Pipa PVC D 1/2" Pipa PVC tipe AW Ø ¾" Pipa PVC tipe AW Ø 1" Pipa PVC tipe AW Ø 1½" Pipa PVC tipe AW Ø 2" Pipa PVC tipe AW Ø 2½" Pipa PVC tipe AW Ø 3" Pipa PVC tipe AW Ø 4" Pipa Tanah bh Plamir Bh Plint Keramik 10 x 20 cm Bh Plint Keramik 10 x 30 cm Bh Plint Keramik 10 x 40 cm Bh Plint Keramik 10 x 50 cm Bh lbr Lembar Porselen Buah Porselen ( 11 x 11 ) cm bh Profil alluminium Profil Alluminium "T" Profil kaca Ramset Buah

Rel Pintu Dorong Bh

Reng (2 x 3) cm m3

Reng (3 x 4) cm m3

Residu atau Ter

Rolling door alluminium m2

lbr Sabun

(9)

182 Semen Nat Kg 183 Semen Portland Kg 184 185 186 187 m’ 188 189 Jam 190 191 m2 192 193 Kg 194 Solar Liter 195 kg 196 197 Kg 198 Teak Oil 199 200 201 202 203 204 205 206 207 208 Vinyl 209 210 Wall paper m 211 set 212 m’ 213 214 215 216 217 218 219 Unit 220 221 222 223 Seng Gelombang 3" x 6" BJLS 28 Lbr Seng gelombang 3"-5" lbr Seng Gelombang BJLS 32 lbr Seng plat Seng Plat 3" x 6" BJLS 28 Lbr

Sewa alat perakitan baja

Sirtu m3

Sisalation / Alluminium Foil

Skrup fixer Buah

Soda Api Strorox – 100

Sunscreen alluminium m2

Tali Ijuk

Ltr

Teakwood tebal 4 mm ukuran (90 x 220) cm Lembar

Teakwood tebal 4 mm, Ukuran 120 cm x 240 cmLembar

Terawang (roster) Buah

Tanah Liat m3

Tanah Urug m3

Underlayer irubber corrugated m2

Urinoir bh

Venetions blinds dan vertical blinds (tirai) m2

Vernis Ltr

Buah

Vinyl karet Buah

Water Drain + Asesories Waterstop

Washtafell Buah

Waterstop lebar 150 mm m’

Waterstop lebar 200 mm m’

Instalasi Titik Lampu Titik

Instalasi Stop Kontak Buah

Besi Grill Drainase 2 cm T : 3 mm m’

Septick Tank + Resapan

Bak Fiber Bh

Pintu Fiber Komplit KM/WC Bh

sakelar Tunggal Bh

Referensi

Dokumen terkait

Terbilang : Seratus empat puluh delapan juta sembilan ratus tujuh puluh ribu rupiah. Pejabat Pengadaan Barang

Terbilang : Seratus Empat Puluh Sembilan Juta Tujuh Ratus Delapan Puluh Ribu Rupiah Hasil Evaluasi sebagai berikut :..

Lima Ratus Tujuh Puluh Tujuh Ribu Rupiah Ratus Dua Puluh Delapan Ribu Rupiah Terbilang : Tiga Ratus Sembilan Puluh Enam Juta.. Delapan Ratus Satu

Terbilang : Seratus tujuh puluh sembilan juta tiga ratus delapan puluh ribu rupiah. Cadangan Pemenang

Terbilang : Seratus Sembilan Puluh Delapan Juta Dua Ratus Tujuh Puluh Lima Ribu Rupiah.. Waktu Pelaksanaan : 77 (Tujuh Puluh Tujuh)

Terbilang : Seratus Sembilan Belas Juta Delapan Ratus Tujuh Puluh Enam Ribu Seratus Rupiah. Pejabat

Terbilang : Seratus empat belas ribu sembilan ratus delapan puluh tujuh

Terbilang : Empat Ratus Sembilan Puluh Tujuh Juta Enam Ratus Lima Puluh Ribu Rupiah Jangka watu Pelaksanaan : 180 (seratus delapan puluh) hari kalender. Pemenang