MUSHOLLA AN-NUR JL. Batas Barat Rt.005 / 010 Kel. Baru, Pasar Rebo Jakarta timur PENGEMBANGAN & RENOVASI MUSHOLLA

N/A
N/A
Protected

Academic year: 2021

Membagikan "MUSHOLLA AN-NUR JL. Batas Barat Rt.005 / 010 Kel. Baru, Pasar Rebo Jakarta timur PENGEMBANGAN & RENOVASI MUSHOLLA"

Copied!
6
0
0

Teks penuh

(1)

No Tanggal Uraian Debet Tanggal Uraian Kredit 27 01-Dec-08 Saldo Awal bulan Desember

36,600,000

1,770,000 34,830,000 28 01-Dec-08 Bp. Harsono, Kalisari 100,000 34,930,000

29 04-Dec-08 Bp. Ivan Santoso 500,000 35,430,000

30 05-Dec-08 Bp. Agus Sudarta, RT 5 300,000 35,730,000

31 05-Dec-08 Bp. H. Hubri 400,000 36,130,000

32 05-Dec-08 Bp. Irdiantoro Susanto,

Bekasi 500,000 36,630,000

33 05-Dec-08 Bp. Widodo, Kalisari 1,500,000 38,130,000 34 06-Dec-08 Bp. Misbach, Kalisari

50,000

06-Dec-08 Ongkos Bongkar Batu Bata

100,000

38,080,000

35 06-Dec-08 Bp. Suparno, RT 7 50,000 38,130,000

36 06-Dec-08 Bp. Siswoyo, Pembina 50,000 38,180,000

37 07-Dec-08 Bp. H. Hasan, RT 5 500,000 38,680,000

38 07-Dec-08 Bp. Hanafi Zain, RT 5 500,000 39,180,000

39 08-Dec-08 Bp. Sukarsa, Dekel 500,000 39,680,000

40 08-Dec-08 Bp. Endang Rachman 300,000 39,980,000

41 08-Dec-08 Bp. Soni A., Bintaro 1,000,000 40,980,000

42 08-Dec-08 Bp. Maksum, Bintaro 1,000,000 41,980,000

43 10-Dec-08 Bp. Harry Fitri, Jakarta 500,000 42,480,000 44 10-Dec-08 Ibu Suminah, Bekasi 250,000 42,730,000 45 10-Dec-08 Bp. Budi Siswanto, RT 7 500,000 43,230,000 46 10-Dec-08 Hasil Penjualan Kupon,

Kurban 120,000 43,350,000

47 10-Dec-08 Kupon Karyawan TMIN 1,500,000 44,850,000

48 12-Dec-08 Bp. Apik Paksa Driya,

B d 100,000 44,950,000

49 13/12/2008 Bp. Thony Lordian 100,000 45,050,000

50 14-Dec-08 Pengeluaran

Biaya Kerja

Bakti 40,000 45,010,000 51 13-Dec-08 Ibu Nani Kurnia/Ibu Pono 300,000 45,310,000 52 13-Dec-08 Saweran ibu -2 majlis ta'lim

An Nur 300,000 45,610,000

53 13-Dec-08 Sri Kustiono 50,000 45,660,000

54 13-Dec-08 Bu Sumarsono RT 03/02 150,000 45,810,000

55 13-Dec-08 Bp Sugiman RT 05 300,000 46,110,000

56 13-Dec-08 Bp. Tomo 100,000 46,210,000

57 13-Dec-08 Bu Rajina RT 07 50,000 46,260,000

58 15-Dec-08 Bu Andi E Sutarto 1,000,000 15-Dec-08 Pasir 1 truk 1,200,000 46,060,000 Cakar Ayam 10

bh 550,000 45,510,000 Benang 45,506,0004,000 Ongkos bongkar

pasir 20,000 45,486,000 59 16-Dec-08 Bp, Namri RT 07 50,000 16-Dec-08 Besi 12 inch 12

bt 1,200,000 44,336,000 Pahat Beton 24,000 44,312,000 17-Dec-08 Pacul 32,000 44,280,000 Buku 1 bh 44,270,00010,000 Pulpen 44,268,0002,000 Spidol 44,262,0006,000 60 18-Dec-08 Bp. Widodo, RT 08 200,000

18-Dec-08 Besi 6 inch 10 btg 160,000 44,302,000 61 18-Dec-08 Bp. Suroto (TMMIN,

Jakarta) 50,000 Besi 10 inch 10 btg 350,000 44,002,000 Kawat bendrad 2 kg 40,000 43,962,000 mata gergaji besi 2 bh 26,000 43,936,000 gegep 2 bh 24,000 43,912,000 split 2 colt 350,000 43,562,000 semen 10 sak 540,000 43,022,000 ember 6 buah 30,000 42,992,000 kunci besi 23,000 42,969,000 batu kali 1 colt 160,000 42,809,000 palu 1 bh 15,000 42,794,000 pensil 1 1,000 42,793,000 62 19-Dec-08 Penjualan Kupon @ 50000 135,000 19-Dec-08 Besi 10 inch 10

bt 450,000 42,478,000 Saldo (Rp.)

JL. Batas Barat Rt.005 / 010 Kel. Baru, Pasar Rebo Jakarta timur

PENGEMBANGAN & RENOVASI MUSHOLLA

2008 – 2009

LAPORAN KEUANGAN 28 Desember 2008

(2)

No Tanggal Uraian Debet Tanggal Uraian Kredit Saldo (Rp.)

Penerimaan (Rp.) Pengeluaran(Rp.)

63 19-Dec-08 Penjualan Kupon @ 50000 50,000 Papan cor 10 bh 120,000 42,408,000 Paku 5 cm 1 kg 16,000 42,392,000 Semen 15 sak 810,000 41,582,000 64 20-Dec-08 Majlis Taklim Al Muttaqin 200,000 20-Dec-08 Besi 12 inch 30

bt 1,800,000 39,982,000 Besi 6 inch 20 bt 320,000 39,662,000 Kawat ayakan 20,000 39,642,000 Triplek 9 mm 2 bh 190,000 39,452,000 Paku 7 cm 1 kg 16,000 39,436,000 Besi ring 12 inch 120,000 39,316,000 Paralon 3 inch 1 bh 65,000 39,251,000 Kne 3 inch 2 bh 30,000 39,221,000 Lem Paralon 1 bh 6,000 39,215,000 Pasir 2 truk 2,400,000 36,815,000 Ongkos bongkar i 50,000 36,765,000 Ongkos Tukang + Kenek 1,180,000 35,585,000 65 21-Dec-08 Bp. Kastono 500,000 21-Dec-08 Pengeluaran Biaya Kerja Bakti 100,000 35,985,000 66 22-Dec-08 Bp. Eko RT 06 200,000 22-Dec-08 Besi 8 inch 30

bt 990,000 35,195,000 67 22-Dec-08 Hamba Allah 1,000,000 Kawat bendrad

5 k 90,000 36,105,000 68 22-Dec-08 Ibu Rusli Cijantung 100,000 Besi ring 21 bh 36,134,00071,000 69 22-Dec-08 Bp. Sudaya RT 07 1,000,000 Ongkos Bongkar Batu Bata 30,000 37,104,000

70 22-Dec-08 Bp. H Joni, Bekasi 100,000 37,204,000

71 22-Dec-08 Bp. Johan 300,000 37,504,000

72 22-Dec-08 Bp. Tomo, Kalisari 200,000 37,704,000

73 23-Dec-08 Bp. Samsuhadi

500,000

23-Dec-08 Pulsa Operasional 100,000 38,104,000 74 23-Dec-08 Bp. Kamsudi, SMK 22 500,000 Papan cor 20 bh 190,000 38,414,000 75 23-Dec-08 Bp. Muslim, SMK 22 200,000 Paku 10 cm 2 kg 36,000 38,578,000 76 23-Dec-08 Bp. Utin, SMK 22 200,000 Paku 7 cm 2 kg 38,742,00036,000 77 23-Dec-08 Bp. Win Kusdiatmono RT 4 500,000 39,242,000

78 24-Dec-08 H. Lukman 100,000 39,342,000

79 24-Dec-08 Hamba Allah 200,000 39,542,000

25-Dec-08 Semen 10 sak 540,000 39,002,000 benang 2 buah 38,998,0004,000 80 26-Dec-08 Lelang Genteng 550,000 26-Dec-08 Paku 4 kg 39,484,00064,000 81 26-Dec-08 Hj Tammah 150,000 Kaso 1 kubik 2,160,000 37,474,000 82 26-Dec-08 Bp. Wahyu Hidayat, PT.

Mahatetra 500,000 Kaso balok 10 btg 640,000 37,334,000 Papan Cor 100

lbr 900,000 36,434,000 83 27-Dec-08 Hamba Allah 300,000 27-Dec-08 Ongkos Tukang 2,055,000 34,679,000 84 27-Dec-08 Hamba Allah 5,000,000 gegep 2 bh 39,655,00024,000

Kaso 4x6 1/2

kubik 1,080,000 38,575,000 27-Dec-08 Besi 10 inch 100

btg 4,300,000 34,275,000 Kayu balok 10

btg 640,000 33,635,000 Besi 12 inch 100

btg 6,000,000 27,635,000 85 28-Dec-08 Bp. Dody RT 7 50,000 28-Dec-08 Papan 3 lbr 135,000 27,550,000

86 28-Dec-08 Ibu Mardhani 60,000 27,610,000

29-Dec-08 Papan 6 lbr 270,000 27,340,000 Kaso 4x6 1/2 kubik 1,080,000 26,260,000 Paku 7 cm 5 kg 26,180,00080,000 Triplek 8 ml 5 lbr 475,000 25,705,000 Triplek 6 mm 20 lbr 1,300,000 24,405,000 Paku 4 xm 1 kg 24,389,00016,000 87 30-Dec-08 Bp. Parjan, RT 7 200,000

30-Dec-08 Photo Copy+lakban 100,000 24,489,000 88 31-Dec-08 Bp. Tata Mulyana, RT 7 300,000 31-Dec-08 Paku 5 cm 4 kg 24,725,00064,000

Kaso 4x6 1

kubik 2,160,000 22,565,000 62,565,000

40,000,000 22,565,000

(3)

No Tanggal Uraian Debet Tanggal Uraian Kredit 88 01/01/09 Saldo Awal bulan

Januari 62,565,000 40,000,000 22,565,000

89 01/01/09 Bp. Bambang RT 5

2,500,000

01-Jan-09 Papan Cor 75 lbr 675,000 24,390,000 Paku 7 cm 3

kg 48,000 24,342,000 90 02/01/09 Bp. Wasiran, RT 7

110,000

02-Jan-09 Kaso 4x6 1kubik 2,160,000 22,292,000 91 02/01/09 Bp. Sarto, RW 9 1,000,000 Paku 7 cm 3 kg 48,000 23,244,000 92 04/01/09 Bp. Hari Winarko 300,000 03-Jan-09 Ongkos Tukang+Kene k 1,895,000 21,649,000 93 04/01/09 Bp. Juminianto, Kalisari 100,000 04-Jan-09 Paku 7 48,000 21,701,000 94 04/01/09 Penjualan Kupon 360,000 Paku 4 cm 48,000 22,013,000 95 05/01/09 Penjualan Kupon 650,000 Cakar Ayam 116,000 22,547,000

Triplek 6 mm

30 lmbar 1,320,000 21,227,000 Bambu

Bagesting, 30

unit 285,000 20,942,000 04-Jan-09 Rokok Kerja

Bakti 100,000 20,842,000 96 06/01/09 Bp. Sungkono, RT 7 500,000 05-Jan-08 Paku 5 cm 48,000 21,294,000 97 06/01/09 Bp. Arifin Junaedi,

Kalisari 1,000,000 Paku 7 cm 48,000 22,246,000 98 06/01/09 Bp. Mujiono, Kalisari

100,000

06-Jan-09 Konsumsi Lembur 75,000 22,271,000 Lampu Neon

2 24,000 22,247,000 99 07/01/09 Alm. Ibu Maryanah

200,000

07-Jan-09 Konsumsi Lembur 81,000 22,366,000 Kawat Bendrad 64,000 22,302,000 Kaso 4 x 6 2 ikat 280,000 22,022,000 Kaso 4 x 6 5 ikat 625,000 21,397,000 Triplek 6 mm 6 lmbar 396,000 21,001,000 Besi 12 inch, 23 btg 1,380,000 19,621,000 Kawat Bendrad 90,000 19,531,000 Meteran 2 b h 26,000 19,505,000 ## 08/01/09 Bp. Hernowo, Vietnam 2,000,000

08-Jan-09 Potokopi Proposal 100,000 21,405,000 ## 08/01/09 Hamba Allah, Austria 4,500,000 Kawat

B d d 54,000 25,851,000 Papan Cor 15

lbr 135,000 25,716,000 Kaso 4 x 6, 5

ikat 625,000 25,091,000 ## 09/01/09 Pendapatan Kotak Amal

1,700,000 Paku 7 cm, 2 kg 32,000 26,759,000 ## 09/01/09 Bp. Sungedi (RT 7) 100,000 09-Jan-09 Ongkos Tukang+Kene k 2,780,000 24,079,000 Papan Cor 15 lbr 135,000 23,944,000 Besi 10 inch, 20 btg 860,000 23,084,000 Paku 7 cm, 2 kg 32,000 23,052,000 Kawat 54,000 22,998,000 Kaso 4 x 6, 4 ikat 500,000 22,498,000 Reng 1 ikat 120,000 22,378,000 Paku 5 cm, 3 kg 48,000 22,330,000 Test pen 5,000 22,325,000 Saldo (Rp.)

JL. Batas Barat Rt.005 / 010 Kel. Baru, Pasar Rebo Jakarta timur

PENGEMBANGAN & RENOVASI MUSHOLLA

2008 – 2009

LAPORAN KEUANGAN 22Januari 2009

(4)

No Tanggal Uraian Debet Tanggal Uraian Kredit Saldo (Rp.) Penerimaan (Rp.) Pengeluaran(Rp.) 10-Jan-09 Kaso 4 x 6, 3 ikat 375,000 21,950,000 10-Jan-09 Gembok 25,000 21,925,000 ## 11/01/09 Bu Eni, 100,000 Reng 3 x 4, 2 ikat 250,000 21,775,000 ## 11/01/09 H. Didi, RT 4 100,000 Paku 7cm, 2k 32,000 21,843,000 Paku 5 cm, 1 k 16,000 21,827,000 Besi 10 inch, 10 bt 430,000 21,397,000 Triplek 6 mm, 1 lb 66,000 21,331,000 Besi 10 inch, 5 btg 215,000 21,116,000 Kawat bendrard, 3 kg 54,000 21,062,000 14-Jan-09 Reng 2 ikay 250,000 20,812,000

Paku 7cm 2 kg 32,000 20,780,000 Benang 5,000 20,775,000 Paku 7cm 2 kg 32,000 20,743,000 Ember Cor 30 bh 150,000 20,593,000 Pengki, 12 bh 84,000 20,509,000 14-Jan-09 Semen 80 sck 4,320,000 16,189,000 ## 17/01/09 Bp. Suwanto 100,000 17-Jan-09 Pasir 1 Truk 1,200,000 15,089,000 ## 17/01/09 Gongseng Motor 100,000 Ongkos bongkar material 50,000 15,139,000 ## 17/01/09 Hamba Allah 30,000

17-Jan-09 Cetak Kupon 40 pcs 250,000 14,919,000 ## 17/01/09 Hamba Allah, Cimanggis

3,000,000

17,919,000

## 17/01/09 H. Komarudin 500,000 18,419,000

## 17/01/09 Bp. Misbach 50,000 18,469,000

## 17/01/09 Bp. Rasmin 1,000,000 19,469,000

## 17/01/09 Kupon Karyawan Toyota 480,000 19,949,000

## 17/01/09 Penjualan Kusen 300,000 20,249,000 ## 18/01/09 Bp. Machbul, RT 4 500,000 20,749,000 ## 18/01/09 Bp. Drs. Yanto SMK 22 1,000,000 18-Jan-09 Ongkos Tukang+Kene k 1,850,000 19,899,000 ## 18/01/09 Bp. Suwito, RT 4 500,000

Kerja Bakti, rokok 227,000 20,172,000 ## 18/01/09 Penjualan Kupon 150,000 Ongkos bongkar material 40,000 20,282,000 ## 18/01/09 Ibu Herni Sp.d, SMK 22 50,000 Sewa Molen+ Operator 300,000 20,032,000 ## 18/01/09 Bp. Drs. Eko Suryono, SMK 22 50,000 Pasir 1 Truk 1,200,000 18,882,000 ## 18/01/09 Bp. Sutarmo, RT 4 300,000 Split 1 Truk 1,200,000 17,982,000 ## 18/01/09 Bp. Letkol H. Sukabi

200,000

Besi 10 inch, 2 btg 86,000 18,096,000 ## 18/01/09 Bp. Anang, RT 7 50,000 Split 1 colt 700,000 17,446,000 20-Jan-09 Besi 20 btg 860,000 16,586,000 Paku 5 cm 1 kg 16,000 16,570,000 Besi 12 inch 10 600,000 15,970,000 Kawat bendrad 2kg 36,000 15,934,000

(5)

No Tanggal Uraian Debet Tanggal Uraian Kredit Saldo (Rp.) besi 8 inch 5btg 165,000 15,769,000 Lot 1 bh 10,000 15,759,000 Kwt bendrad 2kg 36,000 15,723,000 Kaso 4 x 6 4 btg 88,000 15,635,000 reng 5 btg 60,000 15,575,000 paku campur 1kg 16,000 15,559,000 Paku 7 cm 2 kg 32,000 15,527,000 ## 21/01/08 Bp. Juhaeni 500,000

21-Jan-09 Bata Merah, 500 pcs 1,500,000 14,527,000 ## 21/01/09 Hamba Allah

150,000

Uang rokok bongkar 65,000 14,612,000

## 21/01/09 H. Herman Cs 500,000 15,112,000 ## 21/01/09 Bp. Sukamto 1,000,000 16,112,000 ## 23/01/09 BKM Toyota Sunter 300,000 23-Jan-09 Ongkos Tukang + Kenek 1,000,000 15,412,000 23-Jan-09 Biaya Kuli

Material 100,000 15,312,000 25-Jan-09 Bambu Steger 54,000 15,258,000 ## 26/01/09 Bp. Sarbandiyanto, RT 4 500,000 15,758,000 ## 26/01/09 Bp. Wasiran, RT 6/ 10 150,000 15,908,000 ## 26/01/09 Hamba Allah 130,000 16,038,000 ## 26/01/09 Bp. Kamsudi, SMK 22 70,000 16,108,000 ## 26/01/09 Ibu Ema, Kalisari 100,000 16,208,000

## 26/01/09 Bp. Hendra, RT 4 500,000 16,708,000

## 26/01/09 Hamba Allah 100,000 16,808,000

## 27/01/09 Bp. Hj Ali bin Abdul

Halim, Kuningan 1,000,000 17,808,000

26-Jan-09 Besi 10inch 8

btg 264,000 17,544,000 Kawat bendrad 1 kg 18,000 17,526,000 Cincin 2 ikat 140,000 17,386,000 papan cor 20 lbr 180,000 17,206,000 27-Jan-09 Kwt ayakan 20,000 17,186,000 Glass box 8 bh 132,000 17,054,000 ## 28/01/09 Bp. Hari Murtijo, Jakarta

200,000 28-Jan-09 Biaya bongkar pasir 20,000 17,234,000 ## 29/01/09 Penjualan Kupon 590,000 Semen 5 sak 270,000 17,554,000 ## 30/01/09 Kotak Amal Keliling RT 7

940,000

18,494,000

29-Jan-09 Besi 8 inch 10

btg 330,000 18,164,000 besi 10 inch 20 btg 860,000 17,304,000 besi 12inch 10btg 600,000 16,704,000 30-Jan-09 Paku 7 cm 32,000 16,672,000 Paku 5 cm 1 kg 16,000 16,656,000 16,656,000 ## 31/01/09 Hj. Abdul Rachim 1,000,000 31-Jan-09 Ongkos Tukang + Kenek 1,625,000 16,031,000 31-Jan-09 Semen 5 sak 270,000 15,761,000 93,975,000

15,761,000

NoNama Donatu Nama Donatur Material Satuan Jumlah No Material

1 Batu bata 5,000 1 Batu bata

2 Pasir truk 1 2 Pasir

3 Bp. H Sungkono Split truk 1 3 Split

4 Semen sak 10 4 Semen

5 Semen sak 4 5 Ember Ngecor

6 Ember Ngecor unit 10

7 Semen sak 5

8 Semen sak 10

Material Yasmin Kalisari Hamba Allah Sahrudin CV. Ba Ta Tsa Bp. H Sungkono

Ucok Warung, Kalisari Material Yasmin Kalisari

(6)

No

Tanggal

Uraian

Debet

Tanggal

Uraian

Kredit

88 01-Feb-09

Saldo Awal bulan

Januari

93,975,000

78,214,000

15,761,000

03-Feb-09

Besi 10inch

20btg

860,000

14,901,000

Paku 7 cm

2kg

32,000

14,869,000

paku 5 cm

2kg

32,000

14,837,000

kawat

bendrad 2 kg

32,000

14,805,000

Mata gergaji

1 pcs

13,000

14,792,000

04-Feb-09

Glass box 8

bh

120,000

14,672,000

89 05-Feb-09

Penjualan Kupon

30,000

05-Feb-09

Paku 7cm 1

kg

16,000

14,686,000

Paku 5cm

1kg

16,000

14,670,000

Besi 10" 10

btg

430,000

14,240,000

06-Feb-09

Besi 10" 10

btg

430,000

13,810,000

06-Feb-09

Pahat 1 bh

13,000

13,797,000

Reng 1 ikar

70,000

13,727,000

07-Feb-09

Ongkos

Tukang+Kene

k

1,415,000

12,312,000

08-Feb-09

Bata merah

1000pc

265,000

12,047,000

Semen 5 sack

270,000

11,777,000

09-Feb-09

Pasir Putih 1

truck

1,200,000

10,577,000

90 11-Feb-09

Penjualan Kayu Bekas

400,000

09-Feb-09

Bongkar Pasir

20,000

10,957,000

91 11-Feb-09

Bp. Hj. Mustopha

50,000

11,007,000

92 12-Feb-09

Ibu Hj. Danarti

500,000

12-Feb-09

Semen 5 sack

270,000

11,237,000

93 12-Feb-09

PT. Suar Amarta

Solusindo

1,500,000

12,737,000

94 12-Feb-09

Mujiono Kalisari

500,000

13,237,000

95 12-Feb-09

Penjualan Kayu Bekas

650,000

13,887,000

12-Feb-09

Kotak Amal

1,100,000

14,987,000

98,705,000

83,718,000

14,987,000

No Nama Donatur

Material

Satuan

Jumlah

No

Material

1 CV. Ba Ta Tsa

Batu bata

5,000

1

Batu bata

2 Bp. H Sungkon Pasir

truk

1

2

Pasir

3 Bp. H Sungkon Split

truk

1

3

Split

4 Ucok Warung,

Semen

sak

10

4

Semen

5 Material Yasmi

Semen

sak

4

5

Ember Ngecor

6 Material Yasmi

Ember Ngecor

unit

10

7 Hamba Allah

Semen

sak

5

8 Sahrudin

Semen

sak

10

Total

Saldo (Rp.)

MUSHOLLA AN-NUR

JL. Batas Barat Rt.005 / 010 Kel. Baru, Pasar Rebo Jakarta timur

PENGEMBANGAN & RENOVASI MUSHOLLA

2008 – 2009

LAPORAN KEUANGAN 12 Februari 2009

Referensi

Dokumen terkait

Kotler dan Keller (2009:334) menguraikan bahwa merek yang kuat (ekuitas merek) adalah nilai tambah yang diberikan pada produk dan jasa, nilai ini bisa dicerminkan dalam

DAFTAR : PENGHITUNGAN PENETAPAN JUMLAH BANTUAN KEUANGAN KEPADA PARTAI POLITIK YANG MENDAPAT KURSI DI DPRD KABUPATEN MUSI RAWAS UTARA HASIL PEMILU LEGISLATIF TAHUN 2014 TERHITUNG

Indonesia Power UPJP Kamojang merupakan salah satu anak perusahaan PT PLN di Indonesia yang bergerak di bidang pembangkitan energi listrik dengan memanfaatkan sumber panas bumi

Penelitian Komunikasi Adaptasi Teori (KAT) meneliti cara individu membiasakan perilaku komunikasi mereka saat berinteraksi dengan orang lain (dalam hal komunikasi

Pada grafik paket loss OSPF dan MPLS untuk layanan stream video, nilai untuk background trafik 120Mbps dan 140Mbps mengalami penaikan sebesar yaitu 2.1% sedangkan penaikan

Kompaksi adalah Pemadatan tanah dengan menggunakan energi mekanis, termasuk didalamnya modifikasi kadar air dan gradasi tanah.

Bahkan meski jika kita tidak menerima tesis bahwa Yesus pernah ada, kesimpulan dari para sejarawan Perjanjian Baru menghasilkan sesuatu yang memberi pertumbuhan positif dalam

Variabel dependen pada penelitian ini adalah kebijakan dividen perusahaan.. yang diukur dengan Dividend Payout Ratio (DPR) sedangkan