• Tidak ada hasil yang ditemukan

ProdukHukum BankIndonesia cl61204.

N/A
N/A
Protected

Academic year: 2017

Membagikan "ProdukHukum BankIndonesia cl61204."

Copied!
2
0
0

Teks penuh

(1)

Unofficial Translation

No. 6/ 12 /DPNP Jakarta February 26, 2004

CIRCULAR LETTER

TO

ALL COMMERCIAL BANKS

IN INDONESIA

Concerning : The Interest Rate Margin for Third Party Deposit Under Government Guarantee

With the issuance of the Decree of Bank Indonesia Directors Number 31/32/KEP/DIR dated May 29, 1998 concerning the Guarantee for Third Party Deposit and Inter Bank Money Market as amended by Bank Indonesia Regulation Number 3/5/PBI/2001 dated March 22, 2001 (the State Gazette of the Republic of Indonesia of 2001 Number 23, the Supplement to the State Gazette Number 4082) and in regard to the Letter of National Banking Restructuring Agency to Bank Indonesia Number PROG-2345/BPPN/0700 dated July 28, 2000 concerning the Interest Rate Margin for Third Party Deposit Under Government Guarantee, the provisions on the interest rate for Third Party Deposit under Government Guarantee shall be altered to be as follows:

Types Time Period In Rupiahs (basis point)

In Foreign Currency (basis point)

1 month 18

(eighteen)

8 (eight)

3 months 20

(twenty)

8 (eight)

6 months 21

(twenty one)

8 (eight) Deposit

12 months 23

(twenty three)

(2)

-2-

24 months 19

(nineteen)

12 (twelve) Inter Bank

Money Market

42 (forty two)

0 (zero)

above the average Deposit Interest Rate from JIBOR member banks selected by Bank Indonesia.

With the promulgation of this Circular Letter, Bank Indonesia Circular Letter Number 5/25/DPNP dated October 23, 2003 concerning the Interest Rate Margin for Third Party Deposit under Government Guarantee is declared no longer valid.

The provisions in this Circular Letter shall come into force since March 1, 2004. For the public to be informed, it is ordered that this Circular Letter be promulgated in the State Gazette of the Republic of Indonesia.

Kindly be informed.

BANK INDONESIA

Signed

SWD. MURNIASTUTI

Referensi

Dokumen terkait

Pendaftaran dan pengambilan Dokumen Pengadaan dapat diwakilkan dengan membawa surat tugas dari direktur utama / pimpinan perusahaan / kepala cabang dan

[r]

diumumkan Pemenang Paket Pekerjaan Pembangunan Pembangkit Listrik Tenaga Surya (PLTS). Tersebar Kecamatan Lembor Selatan dengan total HPS Rp 541,114,000,-

guru pembimbing melakukan evaluasi dari apa yang telah dilakukan praktikan sehinga dengan mahasiswa praktikan dapat melakukan perbaikan untuk penampilan mengajar pada hari

[r]

Berdasarkan evaluasi yang dilakukan oleh Pejabat Pengadaan Dinas Pertanian dan Perkebunan Kab.. Manggarai Barat, maka hasil evaluasi administrasi, teknis dan biaya sebagai

Memperhatikan Berita Acara Hasil Pengadaan Langsung Nomor : 1.05/PP DITPHP/III/2017 tanggal 06 Maret 2017 dan surat penetapan penyedia pelaksana Pekerjaan Pengadaan

Diberitahukan bahwa setelah diadakan penelitian oleh Panitia menurut ketentuan-ketentuan yang berlaku, Pejabat Pengadaan Barang dan Jasa dilingkungan Dinas Pekerjaan Umum Daerah