• Tidak ada hasil yang ditemukan

DISTORTION OF CAPACITY ON INTER-REGIONAL TRADE OF IMT-GT: STUDY CASES ON FOUR SELECTED PROVINCES IN SUMATRA, INDONESIA) | Avianto | Journal of Indonesian Economy and Business 6286 10692 1 PB

N/A
N/A
Protected

Academic year: 2017

Membagikan "DISTORTION OF CAPACITY ON INTER-REGIONAL TRADE OF IMT-GT: STUDY CASES ON FOUR SELECTED PROVINCES IN SUMATRA, INDONESIA) | Avianto | Journal of Indonesian Economy and Business 6286 10692 1 PB"

Copied!
1
0
0

Teks penuh

(1)

Journal of Indonesian Economy and Business Volume 25, Number 3, 2010, 308 324

DISTORTION OF CAPACITY ON INTER-REGIONAL TRADE

OF IMT-GT: STUDY CASES ON FOUR SELECTED

PROVINCES IN SUMATRA, INDONESIA)

Benito Rio Avianto1

International Economic Cooperation and Financing of ASEAN Division (benito.ekon@yahoo.com)

ABSTRACT

The objective of the paper was to understand the impact of sub regional economic cooperation, known as the Indonesia-Malaysia-Thailand Growth Triangle (IMT- GT), on trade sector in Indonesia. The approach of research based on export macro information by provinces and commodities.

The method used in the analytical framework was a fixed effect method. The regional study covered Nanggroe Aceh Darussalam, North Sumatera, West Sumatera Barat, and Riau provinces, and the commodities involved CPO, coffee and rubber, with 1990-2008 data series.

Based on pooled regression, the IMT-GT, there was a significant impact on export from the four provinces to Malaysia and Thailand for all based years. One might focus on commodity level that, in fact, CPO was the only one coomodity that had a significant impact within the IMT GT region. In addition, Thai Bath and Malaysian Ringgit, with respect to GDP for both countries, had significant influenced on Export;, especially after the IMT GT endorsed.

Keywords: IMT-GT, Province, export, CPO, coffee, and rubber export, pooled regression

1 I am grateful to Catur Sugiyanto for his excellent

Referensi

Dokumen terkait

12 Sakit pada lengan bawah bagian kiri 13 Sakit pada lengan bawah bagian kanan 14 Sakit pada pergelangan tangan kiri 15 Sakit pada pergelangan tangan kanan 16 Sakit

Banyuasin Tahun Anggaran 2015, berdasarkan Berita Acara Hasil Pengadaan Langsung Nomor :. 135/PL/Nakertrans/APBD/Penlatker/2015 tanggal 27 Juli 2015, dan Surat

[r]

[r]

Penelitian ini ingin menguji perbedaan kelelahan ditinjau dari shift pagi (dimulai pukul 07.00 sampai dengan pukul 13.00), shift siang (dimulai pukull3.00 sampai

Bersama ini kami sampaikan Hasil Evaluasi Pra Kualifikasi E-Lelang Umum Pekerjaan Marka Jalan Tol pada Lokasi Pekerjaan Pemeliharaan Periodik dan Rekonstruksi

 Seperangkat rencana dan pengaturan mengenai tujuan, isi dan bahan pelajaran serta cara yang digunakan sebagai pedoman penyelenggaraan kegiatan pembelajaran untuk mencapai tujuan

atau tidak memperhatikan berbagai hambatan yang ada untuk tercapainya komunikasi yang efektif pada pasien lanjut usia sehingga.. memunculkan interpretasi