• Tidak ada hasil yang ditemukan

Directory UMM :Data Elmu:jurnal:S:Stochastic Processes And Their Applications:Vol92.Issue2.2001:

N/A
N/A
Protected

Academic year: 2017

Membagikan "Directory UMM :Data Elmu:jurnal:S:Stochastic Processes And Their Applications:Vol92.Issue2.2001:"

Copied!
1
0
0

Teks penuh

(1)

Stochastic Processes and their Applications 92 (2001) 355

www.elsevier.com/locate/spa

Erratum

Erratum to “Pairs of renewal processes whose superposition

is a renewal process”

[Stochastic Process. Appl. 86 (2000) 217–230]

J.A. Ferreira

Mitthogskolan, Institutionen for fysik och matematik, 851 70 Sundsvall, Sweden

Received 9 May 2000; accepted 28 September 2000

The proof of(d) in Section 3 makes no sense. The following proof should replace the whole sentence ‘Second, replacing ...’.

Using the continuity of F and G in (0; ), we can prove that F and G are contin-uous on (0;2) by showing that they are continuous at each u+v with u; v∈(0; ). Subtracting from both sides of (22) the corresponding expressions withu+v−andv−

in place ofu+vand v, and using F(v−) = F(v), G(v−) = G(v), we nd

G(v)[ F(u+v)−F(u+v−)] =(u)[ G(u+v−)−G(u+v)] F(v);

hence (one side being60 and the other¿0) F(u+v) = F(u+v−) and G(u+v−) =

G(u+v) for u; v∈(0; ). This argument extends to u; v∈(0; n)∩(0; x+),nN, and

hence to (0; x+).

Two smaller mistakes: In the proof of (a), Section 2, ‘m1(t) +m2(t) =m(t)’ should

be replaced by ‘m1(t) +m2(t) =m1(t)’; in the last paragraph of Section 3, ‘in the interior of (0; x+)D’ is a pleonasm because the set is open.

PII of the original article: S0304-4149(99)00095-2.

E-mail address:jose.ferreira@fmi.mh.se (J.A. Ferreira).

Referensi

Dokumen terkait

Gedung Bukan Kantor Masjid Agung Miftahul Ikhsan , telah selesai melaksa nakan pembuktian dok ume n kual ifikasi dari hasil eval uasi dan penilaian terhadap dok umen kual ifikasi

Keluaran Jumlah dokumen Renja SKPD 1 Dokumen Hasil Persentase layanan penyediaan dokumen.

Apabila dari peerta Lelang yang keberatan atas penetapan pemenang tersebut, diharapkan mengajukan sanggahan secam te*ulis paling lambat 5 hari setelah pengumuman ini

Keluaran Jumlah jaringan internet yang yang dibangun 80 titik Hasil Persentase sarana dan prasarana pendukung. berbasis teknologi informasi

Capaian Program Jumlah sarana dan prasarana pendukung berbasis teknologi informasi bagi

Keluaran Jumlah sistem informasi pemerintahan 15 sistem Hasil Persentase sarana dan prasarana pendukung. berbasis teknologi informasi

Unit Layanan Pengadaan Dinas Perhubungan, Komunikasi dan lnormatika Kota Batu pengadaan memutuskan nama-nama perusahaan di bawah ini sebagai Calon Pemenang dan Calon

Keluaran Jumlah media penyebarluasan yang bersifat penyuluhan bagi masyarakat.