27th FEBRUARY 2017

SHARING PENGELOLAAN HEAT RATE

PLTU TANJUNG JATI B

Ari Basuki

(2)
(3)

www.pln.co.id |

TJB 1&2 TJB 3&4

Project Scheme

Plant Owner (Lessor) Plant Operator

(Lessee)

O&M Contractor

established by

•Medco Group (80.1%)

•AF Consult (Finland) (19.9%)

•Durasi 23 tahun

established by

• KOMIPO (Korea) (51%)

• PT.PJB (49%)

•Durasi 20 tahun

Coal Shipping PT. Arpeni Pratama Ocean Line PT. Bahtera Adhiguna

Plant Capacity (Net) 660.8MW x 2Units 661.1MW x 2Units

Supplier/ Contractors

TOSHIBA (Turbine/Generator)

• B&W/Black&Veatch (Boiler & BOP)

• Toshiba Plant Systems and Services (Erection Work)

• Mitsui Engineering & Shipbuilding (Civil)

• Mitsubishi Heavy Industry (Chimney)

TOSHIBA (Turbine/Generator)

• Mitsubishi Heavy Industry (Boiler)

• Black & Veatch (BOP)

• Toshiba Plant Systems and Services (Erection Work) • Mitsui Engineering & Shipbuilding (Civil & Chimney )

Fuel

Commercial Operation

(since) Unit 2: Nov 1, 2006Unit 1: Oct 1, 2006 Unit 3 : Oct 13, 2011Unit 4 : Jan 1, 2012

Outline of the Tanjung Jati B Project

Finance Lease Scheme

PT. Central Java Power

PT. PLN (Persero)

Coal (from South East Kalimantan ) ,7.6 Mil ton consumption/ year

(4)

www.pln.co.id |

PLN

CJP

(PT.Central Java Power)

EPC Contractors (SPDL/SWJO)

• Acquisition of Land

Purchase of Power Plant from EPC Contractors • Lease Power Plant & Land to PLN

Procurement of LoanRepayment of Loan

• Lessee of Power Plant & Land

• Construction of Transmission Line

Fuel Supply

Operation & Maintenance

Payment of Finance Lease Installment

Supply / Construction Contract

Finance Lease (Leasing & Operation) Agreement

Lenders

(JBIC & Commercial Banks)

Loan Agreements

GOI

Liquidity Facility

JBIC

MOF Letter / JBIC Letter

Finance Lease (Construction & Warranty) Agreement

FLA II

FLA I

• Establishment of CJP

Construction of Power Plant • Arrangement of Finance

• Necessary support to CJP, as sponsor

Operator PT. TJBPS

Coal , Fuel Limestone

Supplier

Coal Shipping PT. APOL

(5)

www.pln.co.id |

PLN

CJP

(PT.Central Java Power)

EPC Contractors (SPDL/SCJO)

• Acquisition of Land

Purchase of Power Plant from EPC Contractors • Lease Power Plant to PLN

Procurement of LoanRepayment of Loan

Expansion Finance Lease (Leasing & Operation) Agreement

Lenders

(JBIC & Commercial Banks)

Expansion Loan Agreements

GOI

Liquidity Facility

JBIC

MOF Letter / JBIC Letter

Expansion Finance Lease (Construction & Warranty) Agreement

Umbrella Note of Mutual Understanding

FLA V

FLA IV

• Lessee of Power Plant

• Construction of Transmission Line

Fuel Supply

Operation & Maintenance

Payment of Finance Lease Installment

Expansion Supply / Construction Contract

• Establishment of CJP

Construction of Power Plant • Arrangement of Finance

• Necessary support to CJP, as sponsor

Operator PT. KPJB Coal , Fuel Limestone

Supplier

Coal Shipping PT. BAg

(6)

www.pln.co.id |

Skema Bisnis & Cashflow TJB

PLN TJB

Coal Supplier O&M Operator

O&M Suppliers

Lessor (CJP) PLN Pusat

Escrow Agent (SMBC)

PLTU Tanjung Jati B (4 x 660MW)

Pelanggan

Energi Listrik

Batubara

Spare part & Service O&M Service

O&M Fee

Payment

Droping Monthly OM&Fuel, Monthly MNR for FLIb, Semi Annual Profit Sharing (if any)

Monthly MNR for FLIb

Semi annnual Profit Sharing (if any)

Semi Annual FLI

Singapore Tokyo

Rekening Listrik

(7)

www.pln.co.id |

FLI CALCULATION

7

5 ~ 55%**

*: for the purpose of this presentation, not including EADTX and FLI Adjustment Amount. **: 5 ~ 55% of a weighted average of FLIb during Phase 1 is applied for FLIb during Phase 2 ***: 5 ~ 100% of FLIb during Phase 1 is applied for FLIb during Phase 2

5 ~ 100%*** 3 years

12 years (Phase 1) 8 years (Phase 2) FLIb varies every 3 years

FLIb is fixed during whole lease period : FLI b)

Phase 1 : D (calculated every 6 months)

TJB3&4

FLI* = FLIb + D

FLI* = FLIb + D

TJB1&2

(8)

www.pln.co.id |

FLI CALCULATION UNIT 1-2

8

Basic concept of FLI calculation is “Risk & Profit Sharing” between PLN and CJP.

FLI consists of (i)Fixed Portion (“FLIb”) and (ii)Variable Portion (“D”).

Fuel Cost

Variable Portion & Lease Payment

to be determined during each 6 month Payment Period

Lease Payment

Lease Payment

Phase One

(1st – 12th years)

PLN actual costs

PLN actual costs

PLN

Network Loss

Variable Portion (“D”)

PLN Proft O&M Cost

Phase Two

(13th year – 20th year (plus Delay Period))

Fixed Portion (FLIb)

to be determined on Commercial Operation Date (“COD”) and Every 3

years for 1st 12 years (Phase One)

Fuel Cost

O&M Cost

PLN

Network Loss

Variable Portion (“D”)

PLN Proft

FLIb O&M Cost

FLIb

Network Loss

(9)

www.pln.co.id |

FLI CALCULATION UNIT 3-4

9

Fuel Cost

O&M Cost

Variable Portion & Lease Payment

to be determined during each 6 month Payment Period

Lease Payment

Phase One

(1st – 12th years)

PLN actual

costs

Network Loss

Variable Portion

FLIb

Fixed Portion (FLIb)

fxed during whole Phase One

FLIb FLIb

US ¢ 2.55/kWh flat PLN

Fuel Cost

O&M Cost

Lease Payment

PLN actual

costs

Network Loss

Variable Portion

FLIb

Phase Two

(13th – 20th years plus Delay

D:100% D:100%

(10)

FLIb for Phase One (1st to 12th year) to be determined at COD and every 3

years

[FLIb] = (Expected Proft by operation of TJB on FLIb Determination Date)

   = {(Expected revenue by electricity sales) – (Generating Costs)}

= {ATb x [100% – TDL] – (OMb+Fb+Pb)} x THpp x UC x 80% x YRb

Unit Capacity [kW] (UC)

x x Capacity Factor( 80%) x

Exchange Rate [Yen/Rp.]

(YRb)

For COD: average of “OM” used to refer to the audited report of IP and PJB [Rp/kWh]

For others (every 3years): O&M Costs [Rp./kWh] for the payment period including FLIb Determination date

For COD: (average cost of fuel [Rp./kg] purchased by PLN prior to COD) x (Unit Heat Rate) / (HHV of fuel) For others (every 3years): Fuel Costs [Rp./kWh] for the payment period including FLIb Determination date

(PLN Sales Tarif [Rp./kWh]) x (Transmission and Distribution Loss[%])

FLIb, but not less than minimum FLI determined in the Finance Lease

Agreements (US ) 2.0/kWh )

[FLIb] = (Weighted average of FLIb during Phase One) x 5~55%

Calculation of FLI Fixed Portion (“FLIb”)

x

Expected Fuel Cost (Fb) Expected O&M

Cost (OMb)

FLIb Network Loss

(TDL)

FLIb for Phase Two (13th to 20th (plus Delay Period, if any) )

4383 [hours]

(11)

Private (Finance Company)

Comparison with other Scheme

Finance Arrange

(Loan Procure)

Plant Owner EPC

O&M

Fuel

Transmission &

Distribution

PLN PLN

Private (Developer, Owner and Lessor)

Private (Developer, Owner and Lessor) PLNPLN PLNPLN

PLN PLN

PLN PLN Private (Developer and Owner)

Private (Developer and Owner)

TJB FLA scheme, a “Build, Lease and Transfer (BLT) scheme”, is a unique category of

electricity supply business with private sector investment”.

- SV of PLN OM&F

- Power Plant OM&F Works (in a unique case)

PLN Power Plant

PPA (BOO, BOT)

FLA (BLT)

(12)

HEAT RATE

(13)

www.pln.co.id |

Net Plant Heat Rate (NPHR)

NPHR = Gross PHR – Pemakaian Sendiri (PS)

kCal ¢ Pemakaian Energi yang dikonversi (minimalkan)

NPHR satuan :

---kWh ¢ Jumlah Produksi Energi Listrik (maksimalkan)

kCal ¢ sangat dipengaruhi oleh efektifitas sistem heat transfer pembangkit

(14)

www.pln.co.id |

PENYEBAB UMUM KENAIKAN HEAT RATE

(15)

www.pln.co.id |

HEAT RATE UNIT 1-2

`

15

Actual degradation (%)

# 1 2,64

(16)

www.pln.co.id |

PERFORMANCE TEST VS NATURAL DEGRADATION

16

Keterangan:

(17)

www.pln.co.id |

HEAT RATE OPERASIONAL UNIT 1 (2007 – 2016)

17

EPC Performance test Sep 2006

- Unit Net Heat Rate : 2290 kcal/kWh

- Turbine Net Heat Rate : 1914 kcal/kWh - Boiler Efficiency : 89.6%

(18)

www.pln.co.id |

18

EPC Performance test Sep 2006

- Unit Net Heat Rate : 2279 kcal/kWh

- Turbine Net Heat Rate : 1904 kcal/kWh - Boiler Efficiency : 89.6%

- Aux Pwr consumption : 46.52 MW

(19)

www.pln.co.id |

DATA HEATRATE 1&2

(20)
(21)

www.pln.co.id |

HEAT RATE (PERFORMANCE TEST)

21

NPHR Unit 3

(22)

www.pln.co.id |

NPHR Unit 4

(23)

www.pln.co.id |

DEGRADATION FACTOR (%)

(MANUFACTURE DESIGN)

Item Boiler Turbine Unit

Degradation factor/month (%)

(months 0 - 18) 0.012 0.025 0.037

Degradation factor/month (%)

(months 19 - ~) 0.012 0.014 0.026

(24)

www.pln.co.id |

EFFICIENCY BOILER (%)

24

Boiler Efficiency Unit 3

Ef

Boiler Efficiency Unit 4

(25)

www.pln.co.id |

TURBINE HEAT RATE

25

Turbine Gross HR Unit 3

Tu

Turbine Gross HR Unit 4

(26)

www.pln.co.id |

Data Realisasi NPHR berdasarkan

CF

26

CFnet(%) 70.51 68.98 61.99 88.16 84.65 77.32 65.47 77.80 42.88 73.80 75.38

JAN FEB MAR APR MEI JUN JUL AGS SEP OKT NOV

(27)

www.pln.co.id |

EFFORTS TO MAINTAIN NPHR

Coal quality analysis : daily and CoA supplier

Coal fineness test 60 – 70% 200mesh and <2% 50meshSootblower operation

CTC (Condenser Tube Cleaning) - TurbineLOI (Lost In Ignition) fly ash analysis (<1%)Performance test every 6 months each Unit

Monitoring critical operation parameter (main steam, cond.vaccuum,etc)

Mill maintenance (Grinding table and roller) to maintain coal fineness

Heater element of Air Heater replacement or cleaningLPH, HPH, condenser tube cleaning

Heat Exchanger element cleaningBoiler tube cleaning

Pemeliharaan dengan konsep Modular system (roll in roll out equipment)

Pre-combustion

Operation

(28)

www.pln.co.id |

DAILY COAL QUALITY ANALYSIS

(29)

www.pln.co.id |

COAL FINENESS ANALYSIS

(30)

www.pln.co.id |

LOI (%)

(31)

www.pln.co.id |

LOI (%)

(32)

MERIT ORDER SEPTEMBER 2016

(33)

MERIT ORDER OKTOBER 2016

(34)

34

(35)

35

(36)

36

(37)

37

(38)

TERIMA KASIH

(39)

39

Performance Test 1&2

(40)
(41)

www.pln.co.id |

PURPOSE

1. To perform maintenance most efficiently

2. To maintain the original performance of the equipment

3. To prevent the re-occurrence of failures and any degradation in operating conditions

4. To minimize the number of breakdowns and reduce the frequency of failure and the duration of repair time

(42)

www.pln.co.id |

PROGRAMS

Time base, by daily,

weekly, monthly, yearly

lubricating the

rotating equipment, battery check,

calibration, visual inspection, table and grinding roller of coal mill

Maintenance Program

To correct specifc

problems that have been identifed in the power plant, in the shortest possible time

Implemented to

un-critical equipment

As follow up to

service request issued by Operator

Condition base

Used the tools to

take the data

Applied vibration

analysis, CMSA, tribology, oil tr. Analysis,

(43)

www.pln.co.id |

CONTINUED…

Every 2 years each

Unit

Maintenance Program

Due to plant has

forced derated or forced outage

Strategy: stocking

critical

part/equipment in the warehouse in order to expedite recovery time

To solve the problem

(44)

www.pln.co.id |

Overhaul (Planned Outage)

Type Duration Interval Work Scopes

B- Class (Minor) 37 days 2 years Maintenance of the only low

pressure turbine

(45)

OPERATION

(46)

www.pln.co.id |

PURPOSE

1. Accomplishing the highest level of performance

(47)

www.pln.co.id |

PROGRAMS

Daily meeting

Local patrol check

Issued Service

Request

Communicate with

Dispatcher

Entry operation data

to operator log sheet

Make disturbance

record

Operation Program

Setting control

standard for Start up and shutdown of

unit

Building up &

application of PTW system

Set up SOP & Work

Instruction

Set up internal

environmental guidelines

Maintain flue gas

parameter through CEMS

Thorough operation

(48)

www.pln.co.id |

Continued…

Develop the pertinent operating

procedures and instructions

Implement & utilize PEMS

Periodical implementation of the

performance tests every six months per unit

Fineness coal analysis

Loss of Ignition analysis

Monitoring the in-house power

consumption

Operation

Train the Operators as the

high-qualifed specialists of operation

Implement various

(49)

www.pln.co.id |

UNIT 3&4 KPI ACHIEVEMENT

KPI YEAR

2012 2013 2014 2015 2016

EAF 90.19 95.10 94.61 94.03 93.99

EFOR 1.59 0.02 0.77 1.13 1.06

(50)
(51)

www.pln.co.id |

(52)
(53)

www.pln.co.id |

NPHR Unit 3

(54)
(55)
(56)

www.pln.co.id |

Referensi

Dokumen terkait

Hasil keterampilan proses sains, sikap ilmiah, dan pemahaman konsep mahasiswa pada kelas eksperimen 1 dan kelas eksperimen 2 didapatkan bahwa kelas eksperimen 1 lebih baik dari kelas

Tidak.. Posisi robot ada di sebelah kiri dari garis yang terdapat di lintasan, yang berarti hanya sensor yang sebelah kanan saja yaitu sensor KA2 yang membaca garis hitam.

Pengujian kebutuhan-kebutuhan pengguna terhadap data yang merupakan hasil dari tahap 3, dan dihasilkan sebuah skema basis data konseptual dengan model data tingkat

Pada kelas angka bebas jentik kelas 1 atau angka bebas jentik tinggi (keadaan lingkungan bersih tidak ada jentik) tidak terdapat kasus penyakit demam berdarah karena di

Sedangkan kompresor sentrifugal, termasuk dalam kelompok kompresor Sedangkan kompresor sentrifugal, termasuk dalam kelompok kompresor dinamik adalah kompresor dengan

Jadi rata – rata total biaya yang dikeluarkan pengrajin gula semut dalam satu kali pengiriman adalah sebesar Rp.812.549,-, seperti tersaji dalam tabel berikut.. Total Biaya

Tegangan permukaan adalah gaya persatuan panjang yang terdapat pada antar muka dua fase cair yang tidak tercampur dan selalu lebih kecil daripada tegangan permukaan karena

Menurut Agung (2010:2) menyatakan, PTK sebagai suatu bentuk penelitian yang bersifat reflektif dengan melakukan tindakan-tindakan ter- tentu agar dapat memperbaiki