Propinsi

No --- Sumber Dana Rencana Realisasi Rencana Realisasi Rencana Realisasi Rencana Realisasi Rencana Realisasi Rencana Realisasi

Kabupaten/Kota

(Ha) (Ha) (Ha) (Ha) (Ha) (Ha) (Ha) (Ha) (Ha) (Ha) (Ha) (Ha)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

I JAWA BARAT

1 Bandung SKOR-DR 150,0 150,0 - - - - 150,0 150,0 Subang 50,0 50,0 - - - - 50,0 50,0 Cianjur 500,0 500,0 - - - - 500,0 500,0 Bogor 700,0 700,0 - - - - 700,0 700,0 2 Bandung GNRHL/APBN 437,0 437,0 2.900,0 2.900,0 2.400,0 - 700,0 3.100,0 715,0 715,0 7.152,0 7.152,0 Sumedang 340,0 340,0 1.685,0 1.685,0 - - 125,0 125,0 - - 2.150,0 2.150,0 Cianjur 1.291,0 1.291,0 3.160,0 3.160,0 1.800,0 - - 1.800,0 4.325,0 4.325,0 10.576,0 10.576,0 Purwakarta 1.100,0 1.100,0 2.000,0 2.000,0 1.700,0 - - 1.700,0 760,0 760,0 5.560,0 5.560,0 Karawang 100,0 100,0 2.500,0 2.500,0 1.425,0 - 150,0 1.575,0 390,0 390,0 4.565,0 4.565,0 Bekasi 170,0 170,0 500,0 500,0 100,0 - - 100,0 350,0 350,0 1.120,0 1.120,0 Bogor 1.652,0 1.652,0 1.605,0 1.605,0 1.400,0 - - 1.400,0 1.400,0 1.400,0 6.057,0 6.057,0 Sukabumi - - 2.525,0 2.525,0 2.990,0 - 100,0 3.090,0 4.300,0 4.300,0 9.915,0 9.915,0 Subang - - 1.000,0 1.000,0 1.200,0 - - 1.200,0 2.000,0 2.000,0 4.200,0 4.200,0 Indramayu 404,0 404,0 1.500,0 1.500,0 - - - - 1.904,0 1.904,0 3 Bogor APBD 30,0 30,0 30,0 30,0 19,0 19,0 - - - - 79,0 79,0 Sukabumi - - 12,0 12,0 - - - - 12,0 12,0 Bandung - - - - 1.023,0 1.059,0 - - 1.023,0 1.059,0 Subang - - - - 600,0 600,0 625,0 625,0 1.225,0 1.225,0 Purwakarta - - - - 350,0 350,0 350,0 350,0 4 Bogor APBN/P2RSHL 200,0 200,0 - - - - 200,0 200,0

II BANTEN

1 Serang GNRHL/APBN 750,0 750,0 500,0 500,0 750,0 - 175,0 925,0 2.400,0 2.400,0 4.575,0 4.575,0 Pandeglang 1.500,0 1.500,0 2.900,0 2.900,0 1.050,0 - 575,0 1.625,0 6.200,0 6.200,0 12.225,0 12.225,0 Lebak 750,0 750,0 2.525,0 2.525,0 1.500,0 - 750,0 2.250,0 2.350,0 2.350,0 7.875,0 7.875,0 Cilegon - - 125,0 125,0 500,0 - 200,0 700,0 175,0 175,0 1.000,0 1.000,0 Tangerang 300,0 300,0 250,0 250,0 50,0 - - - 200,0 200,0 800,0 750,0

2 Tangerang APBD - - - - - - 50,0 50,0 - - 50,0 50,0 Serang - - - - 80,0 80,0 - - 80,0 80,0 Tabel IV.2.1.3. Rencana dan Realisasi Pengembanganan Pengelolaan Hutan Rakyat (Fungsi Produksi)

Tahun

2007

2003 2004 2005 2006 Jumlah

Di Wilayah Kerja BP DAS Citarum-Ciliwung. Setiap Tahun Selama Lima Tahun Terakhir

(2)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

III DKI JAKARTA

1 Kep. Seribu GNRHL/APBN - - - - 200,0 - - 200,0 - - 200,0 200,0 Jakarta Timur - - - - 50,0 50,0 50,0 50,0

Jumlah 10.424,010.424,0 25.717,0 25.717,0 17.084,0 19,0 4.528,0 21.579,0 26.590,0 26.590,0 84.343,0 84.329,0

Gambar

Tabel IV.2.1.3. Rencana dan Realisasi Pengembanganan Pengelolaan Hutan Rakyat (Fungsi Produksi)                         Di Wilayah Kerja BP DAS Citarum-Ciliwung

Referensi

Dokumen terkait

Berdasarkan hasil index uji efektifitas pada semua parameter penelitian yang mencakup uji kimiawi dan uji organoleptik (Lampiran 19) menunjukkan bahwa perlakuan F4 (tepung terigu 20

[r]

[r]

[r]

[r]

β3 = 0,462; berarti apabila variabel Jaminan (X1.4) meningkat, maka akan mengakibatkan peningkatan pada Kepuasan Pelanggan (Y), dengan asumsi variabel bebas yang dianggap

Sehubungan dengan Dokumen Pra Kualifikasi yang saudara ajukan untuk Pengawasan Penanganan Resiko Banjir Blok Sekunder Ciputat Tahun Anggaran 2014 , dengan ini kami

11/ULP-ROMIN/FK/VIII/2014 Tanggal 15 Agustus 2014 serta Berita Acara Penetapan Pemenang Pelelangan Pekerjaan Pengadaan Sewa Mesin Fotokopi dan Penggandaan Tahun