• Tidak ada hasil yang ditemukan

DAFTAR PUSTAKA. 1. Ardiansyah, F. (2007), Pemanasan Global dan Respon Indonesia, WWF- Indonesia.

N/A
N/A
Protected

Academic year: 2021

Membagikan "DAFTAR PUSTAKA. 1. Ardiansyah, F. (2007), Pemanasan Global dan Respon Indonesia, WWF- Indonesia."

Copied!
42
0
0

Teks penuh

(1)

DAFTAR PUSTAKA

1.

Ardiansyah, F. (2007),

Pemanasan Global dan Respon Indonesia,

WWF-Indonesia.

2.

Bruno, J.F., Selig, E.R., Casey, K.S., Cathie A., Willis, B.L., Harvell, C.D.,

Sweatman, H., Melendy, A.M. (2007),

Thermal Stress and Coral Cover as

Drivers of Coral Disease Outbreaks.

3.

O’Farrel, S., Korda, R., Rose, H., Williams, C., Comley, J. Lovelace, B.,

Armstrong, H., Guilland, R., Benjamin, J., Day, O. (2007),

Mass Coral

Bleaching event in Tobbago,

Report on the 2005 Part I, Result from phase 1

survey.Buccoo reef trust, coral cay conservation dan jointpatner tobago House of

Assembly, dan the Travel foundation.

4.

Buchheim, J. (1998),

Coral Reef Bleaching,

Oddysey Expedition, Tropical

Marine Biology Voyages.

5.

Buddemeier, Robert, W., Kleypas, Joan A., Aronson, Richard B. (2004),

Coral

Reefs and Global Climate Change, Potential Contributions of Climate Change to

Stresses on Coral Reef Ecosystem,

PEW Climate Centre.

6.

Burke, L., Selig, E., Spalding, M. (2002),

Terumbu karang yang terancam di

Asia tenggara

. World Resources Institute.

7.

Done, T., Whetton, P., Jonnes, R., Berkelmans, R., Lough, J., Skirving, W.,

Wooldrige, S. (2003),

Global Climate Change and Coral Bleaching on the Great

Barrier Reef.

Final Report to the state of Queensland Taskforce through the

Department of Natural Resources and Mines.

CSIRO-Australian Institute of

Marine Science-CRC.

8.

Douglas, Bruce C. (2004),

Global Sea Level Change: Determination and

Interpretation,

U.S. National Report to IUGG, 1991-1994. Rev Geophys. Vol. 33

Suppl, American Geophysical Union.

9.

Gammon, R. (2007),

Transition to Sustainability Synergy: Sustainable Living

Conference

, Chemistry-Oceanography, Atm. Science University of whasington

10.

Geophysical Fluid Dynamics Laboratory (GFDL). (2004),

Climate Impact of

Quadrupling Atmospheric CO

2

,

An Overview of GFDL Climate Model Results,

Princeton University Forrestal Campus. Princeton.

(2)

11.

Hansen, J.,Ruedy, R., Sato, M., Lo, K. (2005),

GISS Surface Temperature

Analysis. Global Temperature Trends: 2005 Summation.,

NASA Goddard

Institute for Space Studies and Columbia University Earth Institute, New York.

12.

Hoegh-Guldberg, O. (2004),

Climate Change, Coral Bleaching, and the Future

of the World’s Coral Reefs.

The Coral Reef Research Institute, University of

Sydney.

13.

http://orbit-net.nesdis.noaa.gov/orad/coral_bleaching_index.html

14.

IPCC. (2001),

Summary for Policymakers. Climate Change 2001: Impacts,

Adaptation, and Vulnerability.

A Report Working Group II.

15.

Lindsey. (2004),

A Dangerous Intersection: Humans and Climate Destroy Reef

Ecosystem

. Earth observatory, NASA.

16.

Marine Reef International (MRI). (2007), Mass bleaching around the world

17.

Marshall, P., Schuttenberg, H., West, J. (2006),

A Reef Manager’s Guide to

Coral Bleaching,

GBRMPA, NOAA, IUCN, Great Barrier Reef Marine Park

Authority, Townsville, Australia.

18.

NOAA Coral Reef Watch. (2000),

Davies Reef Sea Surface Temperature and

Degree Heating Week Time Series Charts NOAA Twice Weekly Near Real Time

50 km Sattelite Nighttime AVHRR.

http://coralreefwatch.noaa.gov/satellite/current/key_sst_50km_field.html.

19.

NMRGOV. (2007),

Coral Bleaching, Indicator Status.

Estuarine, coastal, and

marine habitat integrity.

20.

NOAA Satellites and Information. (2006),

Operational Satelitte Coral Bleaching

Monitoring Products Methodology

, Information processing Division. Office of

Sattelite Data.

21.

ReefBase. (2007),

ReefBase Dataset: Coral Bleaching.

UNEP-WCMC.

http://www.reefbase.org/contribute/bleachingreport.aspx.

22.

Rogers, C.S., Garrison, G., Grober, R., Marie hillis, Z., Franke, M. A. (1994),

Field survey methods coral reef Monitoring Manual for carribbean and western

atlantic, National park service Virgin Island national park.

23.

Setiasih, N., Ismunarto, Dwi H. (2006),

Bali Barat National Park. Coral

Monitoring Report,

Reports for Friends of the Reef Project WWF Indonesia.

Denpasar.

(3)

24.

Strong, A.E., Liu, G., Kimura, T., Yamano, H., Tsuchiya, M., Kakuma, S.,

Woesik, R. (2001).

Detecting and monitoring 2001 Coral Reef Bleaching Events

in Ryukyu Islands Japan Using Satelitte Bleaching Hotspot Remote Sensing

Technique.

25.

Sukmara, A., Siahainenia A. J., Rotinsulu, C. (2001).

Panduan Pemanatauan

Terumbu Karang berbasis Masyarakat dengan Metode Manta Taw.

Proyek

Pesisir-CRMP Indonesia.

26.

Susandi, A., Radjawane, Ivonne M., Subki, A. (2006),

Kajian Potensi Kelautan

Indonesia Dalam Menyerap CO

2

,

Penelitian Hibah Bersaing XIV/1.

27.

Terry D., Peter W., Roger J., Ray B., Janice L., William S., Scott W. (2003),

Final report to state of Queensland greenhouse taskforce

, Department of natural

resources and mines, AIMS, CSIRO, and CRC Reef Research Centre.

28.

TNC

. (2007),

Coral Triangle.

www.tnc.org/coral-triangle/

29.

UCLA. (2004),

Reef Check Instruction Manual, A guide to Reef Check Coral

Reef Monitoring,

Institute of the Environment. University of California.

30.

UNEP. (2006),

Sea Level Rise due to Global Warming,

Potential Climate Change

Impacts. Observed Climate Trends.

31.

Wilkinson, C. (2000),

Status of Coral Reefs of The World: 2000,

Global Coral

Reef Monitoring Network. Australian Institue of Marine Science.

www.environment.gouv.fr/icri.

32.

Woodworth, P.L. (2007),

Long Term Sea and Land Level Changes and their

Monitoring,

Permanent Service for Mean Sea Level. Proudman Oceanographic

Laboratory.

(4)

1

Lampiran A. Persentase

cover area

terumbu karang

A.1. Kedalaman 3 m

A.1.1. Persentase

cover area

terumbu karang di Mangrove dan Kelor

Kode Mangrove Kelor

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 1,453 1,067 1,6 1,733 3,16 ACB 7,453 1,68 30,67 3,017 7,11 0,4 3,16 4,133 9,417 7,8 ACO 1,05 0,6 0,14 ACT 0,167 4,587 1,167 1,48 0,493 3,347 1,467 1,133 AGO 0,16 0,773 1,44 EUP 0,44 0,853 0,417 FAV 1,18 1,587 0,147 1,133 1,693 0,193 0,817 1,933 0,653 0,133 0,16 FNG 0,18 0,187 0,16 0,68 0,067 GAL 0,453 0,167 0,91 0,817 0,04 0,533 0,1 0,14 GON 0,067 0,947 LOB MER 9,387 0,6 1,587 1,173 1,16 3,467 MNT 0,117 9,51 8,373 10,65 8,507 1,1 4,333 1,68 0,4 13,73 17,96 11,11 MSO 0,08 0,133 OHC 0,98 1,667 1,99 0,8 0,013 1,17 1,16 1,173 0,417 PAC 0,14 0,333 PAV 1,987 0,747 0,48 PCL 0,89 0,413 0,453 1,1 1,013 PEC 0,31 PBR 7,117 15 1,1 1,013 35,44 9,707 10,19 15,77 1,04 43,8 7,1 13,95 PMS 0,147 1,133 0,187 4,373 8,667 0,333 1,68 1,08 0,853 11,11 0,933 SER 1,76 0,547 1,907 0,91 1,96 0,11 0,453 0,117 STY 0,173 1,173 1,973 0,48 TUR CME/MIL 0,13 0,33 0,17 CTU CHL HC 13,69 45,94 16,71 53,54 51,41 36,51 14,96 41,36 13,87 76,77 47,35 40,67 High susc 1,893 15,05 11,07 33,56 5,77 16,16 6,387 13,73 8,36 6,71 10,81 13,18 low susc 9,107 18,71 3,307 8,533 37,13 18,71 11,41 11,87 3,933 45,89 18,57 15,18

(5)

2

A.1.2. Persentase

cover area

terumbu karang di Utara Pulau dan Takad Saru

Kode Utara Pulau Takad Saru

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 7,14 0,117 1,31 5,613 0,067 0,16 0,587 ACB 3,31 0,747 0,667 11,63 1,333 0,8 1,947 1,053 1,16 3,933 5,1 ACO 0,67 0,113 1,88 ACT 1,48 0,533 0,8 0,507 1 0 1,067 1,853 1,08 0,573 AGO 0,133 0,31 0,053 0,333 EUP 0,04 FAV 0,4 0,11 1,04 1,18 3,587 1,417 4,013 0,18 5,18 4,31 1,453 FNG 0,37 0,14 0,14 0,173 0,533 0,173 1,51 0,187 0,64 0,453 0,1 0,333 GAL 0,867 0,387 0,11 0,117 0,133 GON 0,1 0,933 3,37 LOB 0,08 0,133 0,017 MER 0,193 1,817 0,167 0,587 0,173 0,76 0,167 MNT 13,35 8,57 9,173 9,36 11,99 0,893 0,947 1,17 1,067 1,017 MSO 0 0,37 OHC 0,15 0,107 0,04 0,653 0,53 0,187 1,4 0,173 0,76 0,707 PAC 0,107 1,453 PAV 0,1 0,053 0,347 0,067 PCL 0,4 0,133 0,067 0,8 4,013 0,947 0,533 0,51 1,96 1,04 PEC 0,107 PBR 10,45 14,43 4,04 13,05 1,893 3,187 0,017 0,16 1,453 9,4 PMS 1,6 4,13 1,613 3,013 1,117 8,453 8,613 11,4 7,11 11,4 13,88 11,04 SER 0,173 1,453 0,14 1,417 1,053 0,187 0,187 1,107 0,907 0,013 STY 0,167 0,187 0,51 0,373 0,333 0,187 TUR CME/MIL 0,11 CTU CHL HC 39,01 41,89 11,6 44,48 11,61 19,93 13,91 13,41 11,8 45,45 18,16 30,07 High susc 11,19 4,493 3,4 15,51 3,747 11,68 1 4,403 4,187 11,54 6,867 6,067 low susc 13,89 19,4 8,933 18,57 5,88 15,48 11,71 15,6 8,333 30,53 19,85 11,17

(6)

3

A.1.3. Persentase

cover area

terumbu karang di Tanjung Gelap dan Pos 2

Kode Tanjung Gelap Pos 2

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 1,173 1,133 0,533 3,153 ACB 0,533 0,973 4,17 4,333 5,6 5,067 5,307 ACO 0,13 0,067 0,61 0,093 ACT 1,373 6,91 1,933 0,533 4,51 4,987 AGO 1,173 0,91 EUP FAV 0,16 0,1 0,167 0,853 3,48 3,347 3,587 3,04 3,013 FNG 0,173 0,347 0,08 GAL 0,493 0,307 0,193 0,653 GON 0,133 0,117 0,307 LOB 0,667 MER 0,147 0,44 0,667 0,133 1,48 MNT 3,4 0,417 1,787 3,467 6,017 3,493 1,067 3,11 MSO 1,167 OHC 0,71 0,133 0,373 3 3,71 0,95 1,667 1,11 0,51 PAC 0,117 PAV 0,133 0,067 0,4 PCL 0,307 0,11 0,96 1,04 1,373 0,4 0,96 PEC 0,573 PBR 10,65 11,19 17,55 11,56 38,57 38,11 0,08 1,31 1,187 7,16 0,153 PMS 11,44 19,11 58,67 38,31 8,733 15,41 8,1 1,59 3 9,667 1,4 1,067 SER 0,167 0,04 1,187 1,493 1,347 1,71 STY 0,16 TUR CME/MIL 0,49 1,51 0,07 0,96 CTU CHL HC 47,1 56,16 87,45 51,31 50,09 57,15 17,84 17,35 30,59 31,35 15,3 14,53 High susc 1,81 1,07 0,167 0,117 0 0 5,44 14,91 11,63 11,79 11,14 14,93 low susc 43,58 51,56 86,39 51,08 47,31 53,79 9,167 7,39 9,187 13,48 11,97 5,96

(7)

4

A.1.4. Persentase

cover area

terumbu karang di Batu Licin dan labuhan Lalang

Kode Batu Licin Labuhan Lalang

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 15,78 1,987 1 0,987 5,04 ACB 1,66 41,33 1,573 1,36 1,373 1,51 11,61 1,113 0,187 ACO 0,133 ACT 1,47 4,6 1,067 1,84 1,6 0,693 1,16 AGO 0,08 1,113 0,187 0 0,16 0,013 EUP 1,04 0,417 0,1 FAV 0,6 1,867 0,14 0,467 0,617 0,133 1,867 0,14 4,387 1,613 0,933 FNG 0,09 0,4 0,31 1,613 0,533 0,053 GAL 0,38 0,733 1,16 0,773 0,113 0,167 0,117 0,68 0,153 0,053 GON 6,18 4,147 10,91 0 0,053 0,4 LOB MER 1,36 0,51 0,067 MNT 4,37 0,773 30,88 1,11 1,973 0,113 0,813 0,107 1,18 0,053 MSO 1,08 OHC 4,08 0,467 0,973 3,45 0,31 0,48 0,117 PAC 0,493 0,533 PAV 0,6 1,4 PCL 0,14 0,953 1,787 1,31 1,113 1,417 PEC 1,81 0,187 0,1 0,16 PBR 4,18 5,173 11,51 31,1 49,47 3,91 0,84 0,573 3,147 1,4 PMS 0,16 0,507 3,787 1,093 1,017 1,94 0,1 1,133 1,18 1,017 SER 0,74 1,573 1,667 1,56 1,68 0,08 1,307 0,167 0,613 0,333 0,813 STY 0,11 0,573 TUR 0,467 CME/MIL 1,89 3,08 0,4 CTU 0,7 1,39 0,33 CHL HC 49,84 66,75 40,85 35 47,71 59,59 10,59 14,17 14,44 14,11 15,11 6,933 High susc 31,46 45,89 8,533 4,557 7 3,573 4,973 6,606 11,43 3,167 5,153 3,587 low susc 11,63 13,39 1,44 15,97 36,76 51,05 5,08 5,133 1,853 10,75 7,08 3,067

(8)

5

A.1.5. Persentase

cover area

terumbu karang di Kotal dan Pemuteran Timur

Kode Kotal Pemuteran Timur

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 1,693 3,307 3,053 0,133 8,387 0,31 0,133 ACB 1,093 0,987 1,91 3,167 3,31 9,147 1,79 0,113 0,417 1,773 ACO 0,41 0,167 1,547 0,8 ACT 1 1,347 1,467 4,973 10,57 8,107 1,333 3,16 1,167 AGO 0,117 0,053 0,307 0,36 0,113 EUP 0,57 FAV 0,153 1,547 0,187 1,467 1,307 3,36 0,14 1,91 3,81 6,96 1,533 1,853 FNG 0,133 0,067 0,067 0,113 0,4 1,67 0,36 GAL 0,44 0,1 0,053 0,107 0,17 0,387 0,133 GON 1,617 0,04 LOB 0,11 MER 0,133 0,04 0,1 3,77 0,147 1,173 MNT 1,373 4,71 0,667 0,6 0,333 0,15 0,147 1,04 MSO 0,093 OHC 0,187 0,067 0,4 0 0,09 1,56 0,77 0,14 0,4 PAC 0,147 1,133 PAV 0,1 0,68 PCL 6,017 1,547 0,417 1,653 1,053 10,45 0,51 3,113 0,8 11,6 1,547 3,31 PEC 0,113 PBR 1,13 0,453 5,973 4,6 4,193 0,11 10,99 10,71 7,747 1,013 PMS 3,15 0,133 1,417 1,787 6,107 8,03 1,77 1,13 15,1 7,44 6,31 SER 0,987 0,947 0,68 0,193 9,307 STY 1,107 0,14 0,14 0,04 0 TUR CME/MIL 0,37 CTU CHL HC 13,48 16,65 17,88 14,45 14,16 61,43 11,58 10,97 16,16 49,11 10,37 19,39 High susc 10,81 9,69 6,4 17 15,41 45,64 1,61 4,893 7,73 16,09 1,693 7,167 low susc 1,057 5,517 6,36 6,733 7,747 13,87 9,19 5,197 18,18 31,88 16,85 9,547

(9)

6

A.1.6. Persentase

cover area

terumbu karang di Pemuteran Barat dan Tabuhan

Kode Pemuteran Barat Tabuan

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 1,147 0,413 5,48 0,96 ACB 1,173 1,167 0,36 3,573 4,093 0,56 1,307 10,18 ACO 1,067 1,067 ACT 0,307 1,113 0,707 3,167 1,56 1,387 1,39 AGO 0,507 EUP FAV 0,093 0,973 0,51 0,8 0,75 0,613 0,653 3,16 0,117 0,31 FNG 0,193 GAL 1,333 GON 0,173 0,11 LOB 0,587 MER 0,48 0,13 MNT 0,31 0,14 3,653 0,107 0,36 1,113 39,09 16,97 14,19 41,61 17,71 MSO 0,067 0,11 OHC 0,4 1,44 0,507 0,33 0,11 0,44 6,51 9,84 1,08 PAC 1,067 PAV 1,307 PCL 0,153 0,387 0,56 1,933 1,19 0,4 3,1 1,307 1,13 PEC PBR 0,667 0,653 6,8 15,48 30,11 16,95 18,15 11,17 58,09 6,307 1,99 PMS 0,307 5 0,947 6,773 11,01 7,95 0,147 4,14 0,36 1,133 0,13 SER 0,387 0,4 0,08 STY 0,387 0,987 0,333 0,133 1,16 TUR CME/MIL 0,97 CTU CHL 1,8 HC 5,11 10,88 14,68 43,19 44 35,91 71,14 71,59 0 75,63 54,97 33,39 High susc 3,167 1,4 1,153 5,667 1,55 8,613 7,573 11,8 0 1,617 4,613 13,01 low susc 1,067 6,8 8,167 34,39 41,98 15,63 19,05 10,16 0 58,75 7,667 1,44

(10)

7

A.1.7. Persentase

cover area

terumbu karang di S.K. Takad dan S.K. Tanjung

Kode Sumber Kima Takad Sumber Kima Tanjung

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 3,133 0,113 1,08 ACB 1,31 0,617 0,153 0,11 0,18 4,107 0,653 ACO 0,067 ACT 1,193 0,153 4,093 8,017 AGO 0,467 0,133 EUP 0,173 1,1 FAV 1,307 0,093 0,507 1,417 3,093 1,6 0,167 1,187 9,013 3,96 0,64 0,453 FNG 0,1 0,067 0,893 3,853 0,347 0,307 0,117 0,187 GAL 0,093 0,167 0,587 0,333 0,08 0,1 0,067 0,787 GON 0,413 0,907 9,4 0,373 0,167 1,87 0,153 LOB 0,04 0,48 0,117 MER 0,093 0,113 0,387 1,017 0,947 0,053 MNT 0,067 5,573 0,453 1,307 1,067 8,573 0,547 0,14 0,347 0,187 MSO 0,113 0,16 0,31 0,113 0,053 0,14 OHC 4,333 0,167 1,03 0,573 1,17 1,48 0,11 0,1 0,03 PAC 1,16 PAV PCL 1,907 0,787 1,08 0,16 0,107 0,117 1,47 1 PEC 1,787 0,193 0,11 0,093 0,173 PBR 1,6 7,053 0,68 0 8,147 17,6 3,417 1,417 5,88 0,493 0,053 4,933 PMS 1,31 1,59 1,16 1,44 10,15 6,493 1,347 1,81 3,6 6,48 4,147 6,04 SER 1,907 1,347 0,933 0,053 0,747 0,693 1,36 0,133 0,747 4,14 STY 0,14 0,947 0,56 0,413 0,147 TUR 0,96 CME/MIL CTU CHL HC 17,45 17,96 9,16 15,68 18,33 44,33 6,703 9,01 33,71 14,04 8,643 15,85 High susc 8,733 1,193 4,363 1,147 1,173 3,133 1,1 1,1 11,48 8,987 1,947 4,14 low susc 4,31 9,617 3,153 11,33 13,14 31,15 5,193 7,01 19,83 14,71 6,193 11,43

(11)

8

A.1.8. Persentase

cover area

terumbu karang di Wreck

Kode Wreck 10/3 03/4 10/4 03/5 09/5 01/6 ACA 1,707 0,613 1,51 ACB 0,99 1,573 8,413 4,113 0,787 ACO 0,14 ACT 3,093 0,817 1,18 1 1,76 AGO 0,453 0,117 0,18 EUP FAV 0,053 1,173 0,507 1,16 0,653 FNG 0,16 0,113 0,067 GAL 0,153 0,417 GON 0 4,533 LOB 0,173 0,167 MER 0,413 1,91 0,373 1,507 MNT 1,16 6,113 10,63 11,15 7,387 46,81 MSO 0,093 OHC 0,76 5,617 4,547 0,11 PAC 0 PAV 0 PCL 0,573 1,96 0,333 0,187 0,417 0,173 PEC PBR 8,093 5,91 13,17 9,617 18,79 8,787 PMS 0,773 8,57 1,307 0,747 0,453 SER 1,91 1,707 6,667 5,153 8,067 STY 0,187 1,56 TUR CME/MIL 0,17 0,65 CTU CHL HC 16,6 38,17 47,31 50,45 45,77 61,09 High susc 5,757 9,79 16,57 16,84 18,14 0,96 low susc 8,91 16,09 15,57 11,01 19,96 13,31

(12)

9

A.2. Kedalaman 10 m

A.2.1. Persentase

cover area

terumbu karang di Mangrove dan Kelor

Kode Mangrove Kelor

ACA 10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 0,333 0,933 0,83 4,18 1,1 ACB 1,017 0,707 0,947 1,787 1,15 0,147 1,573 1,493 1,35 0,307 1,91 ACO ACT 0,68 0,733 0,68 0,933 1,707 0,89 3,8 8,547 1,867 1,57 AGO 0,56 0,187 0,373 0,667 EUP 0,933 1,773 0,533 FAV 1,587 4,547 1,947 6,173 7,44 4,56 1,4 1,347 0,387 3,81 1,14 0,96 FNG 5,147 0,11 0,133 GAL 0,56 0,173 0,147 0,067 0,167 0,16 0,167 3,18 0,71 GON 0,347 1,167 0,193 8,79 0,36 LOB 0,04 MER 1,867 1,11 0,04 0,117 0,093 0,36 0,81 1,1 0,507 MNT 8,333 4,373 3,113 0,067 6,853 1,14 1,817 8,17 1,133 1,71 MSO 0,187 OHC 0,747 5,373 0,153 1,07 0,05 0,08 1,14 1,333 0,493 1,01 0,31 PAC 0,667 0,117 0,44 0,14 0,33 0,307 PAV 0,167 0,547 0,1133 1,19 0,1 PCL 0,1 0,387 0,453 0,47 1,333 0,91 3,31 PEC 0,4 1,733 PBR 1,68 18,04 0,187 1,467 8,333 7,51 4,133 1,347 0,1 4,48 13,34 5,617 PMS 0,4 0,507 0,147 3,667 8,417 4,667 1,4 1,67 0,133 0,59 0,96 SER 0,67 0,147 0,467 0,71 0,08 1,533 0,507 STY 1,493 0,11 4,05 TUR CME/MI 0,31 CTU CHL HC 5,91 51,16 7,504 16,89 39,56 11,83 17,96 13,11 9,747 48,1 14,87 14,44 High susc 0,68 1,693 3,153 7,813 6,71 4,136 9,8 11,61 6,44 15,18 4,35 1,933 low susc 4,117 34,13 1,773 13,64 19,37 17,03 8,4167 6,363 0,987 10,98 18,70 7,973

(13)

10

A.2.2. Persentase

cover area

terumbu karang di Utara Pulau dan Takad Saru

Kode Utara Pulau Takad Saru

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 1,04 1,733 0,56 0,1 0,167 0,31 0,84 ACB 1,04 6,573 4,71 3,4 1,853 1,84 1,017 1,16 1,193 6,533 ACO 0,39 1,187 0,14 ACT 1,96 1,04 8,6 6,51 7,507 0,31 0,973 3,167 0,653 AGO 0,56 0,453 0,31 0,167 EUP 0,333 FAV 0,113 1,16 0,84 0,533 3,693 3,31 1,467 6,987 1,693 8,907 7,33 3,11 FNG 0,147 0,133 0,693 0,947 0,533 0,4 GAL 1,1 0,133 0,467 GON 1,18 13,73 0,147 0,96 0,4 0,167 LOB 0,133 0,4 0,167 MER 1,867 0,933 1,08 0,067 0,153 0,4 MNT 0,133 6,787 3,987 3,573 3,013 0,347 3,093 0,14 1,573 0,933 0,693 MSO 0,53 0,13 OHC 1,133 0,13 0,933 1,96 0,56 4,4 0,17 PAC 0,787 0,14 1,093 0,4 0,533 0,6 PAV 1,14 0,307 0,153 0,117 0,307 PCL 1,03 1,17 0,173 0,193 1,907 0,093 0,56 1,31 0,533 0,43 0,533 PEC 0,413 0,6 0,333 0,07 0,133 PBR 4,093 7,31 0,933 3,173 1,107 17,16 0,653 0,733 0,533 1,413 3,4 PMS 8,59 7,347 1,867 0,507 1,093 0,417 4,77 1,507 17,35 4,13 0,667 SER 0,467 0,11 0,667 0,113 0,133 0,8 0,04 STY 4,413 0,18 0,153 0,147 0,36 0,8 0,133 0,16 1,133 TUR 1,093 0,4 0,747 CME/MIL 1,43 CTU CHL HC 11,73 43,08 14,07 30,57 14,96 17,03 13,17 11,19 9,617 43,15 14,51 19,64 High susc 8,193 9,433 10,4 11,11 11,76 14,04 0,193 3,08 4,507 6,813 8,15 10,83 low susc 4,307 11,91 9,153 17,53 7,84 7,51 19,1 14,46 4,88 18,93 14,51 7,587

(14)

11

A.2.3. Persentase

cover area

terumbu karang di Tanjung Gelap dan Pos 2

Kode Tanjung Gelap Pos 2

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 1,04 1,773 ACB 0,14 0,64 1,067 0,11 1,107 6,31 4,933 1,4 0,707 ACO 1 ACT 0,117 5,1 0,813 5,117 0,1 9,947 3,31 3,1 AGO 0,173 0,6 4,893 EUP 0 0,667 0,13 FAV 0,093 5,533 0,387 9,333 1,6 13,51 6,76 10,95 FNG 0,11 0,933 0,067 1,64 0,787 0,667 0,11 0,117 GAL 0,16 0,13 1,067 1,933 1,667 0,053 GON 3 0,11 LOB 1,1 MER 1,173 0,11 0,147 0,693 1,6 0,15 MNT 7,6 8,55 0,7 6,71 0,36 0,693 5,147 3,187 1,817 3,19 0,387 MSO OHC 5,117 0,18 0,133 0,4 1,47 7,853 1,96 5,55 1,01 PAC 0,617 0,1 0,147 1 0,48 PAV 0,017 0,18 0,133 1,067 0,533 4,11 0,113 PCL 0,113 0 1,05 4,173 1,387 3,08 0,53 PEC 0,05 0,893 PBR 51,51 36,16 17,44 16,73 18,04 47,68 1,04 1,167 0,18 PMS 5,09 10,15 11 14,73 10,67 6,987 8,67 15,89 1,693 8,56 0,73 1,187 SER 0,307 0,167 0,17 0,933 STY 0,6 1,067 0,15 0,067 TUR 0,147 CME/MIL 0,19 CTU CHL HC 57,86 71,19 60,07 47,19 46,78 56,35 19,51 59,11 13,1 59,34 11,41 13,07 High susc 0,14 1,467 1,387 6,167 0 0 4,45 14,49 8,867 11,56 6,07 6,09 low susc 57,71 57,14 49,76 39,76 39,78 55,45 11,14 31,09 4,193 17,4 7,95 14,89

(15)

12

A.2.4. Persentase

cover area

terumbu karang di Batu Licin dan Labuhan Lalang

Kode Batu Licin Labuhan lalang

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 3,547 3,04 18,99 1,107 1,44 ACB 3,167 0,773 0,653 11,68 0,14 0,64 1,18 7,173 1,853 0,133 1,093 3,88 ACO 0,68 0,133 ACT 7,113 1,467 1,387 1,307 1,187 1,68 0,193 1,44 0,44 AGO 1,987 0,16 0,14 0,107 EUP 0,067 0,91 0,417 0,1 FAV 0,093 0,933 0,187 0,76 0,14 0,36 3,453 1,387 1,18 1,133 1,08 FNG 0,31 0,113 1,547 0,133 0,133 0,48 GAL 0,96 0,987 0,14 5,04 1,96 1,947 4,667 GON 0,91 7,017 0,133 4,893 LOB 0,11 0,093 MER 0,333 0,08 0,167 MNT 15,11 0,4 11,35 9,173 1,387 1,76 0,667 1,1 7,493 0,467 0,6 0,667 MSO 0,133 OHC 1,91 3,193 1,907 0,41 0,36 0,79 0,14 0,167 0,18 0,467 0,16 0,107 PAC 1,773 0,11 0,067 0,117 0,133 PAV 0,867 0,587 0,11 0,71 PCL 0,413 0,133 0,84 1,61 0,71 4,147 0,193 PEC 1,653 0,84 PBR 4,64 7,773 0,667 3,107 8,733 5,893 1,947 5,04 0,867 1,76 1,067 0,76 PMS 10,17 0,867 1,193 0,71 0,153 0,373 0,64 5,333 0,117 SER 11,75 11,69 0,96 1,573 0,187 0,813 0,193 0,173 STY 0,44 1,867 0,193 3,453 0,76 0,167 0,347 TUR 1,08 CME/MIL CTU CHL HC 51,51 53,73 10 67,58 17,63 11,91 9,333 18,58 16,11 10,03 8 8,04 High susc 17,87 19,15 1,467 38,71 1,573 1,093 5,413 15,66 4,16 4,71 3,96 4,31 low susc 6,613 16,89 1,16 18,41 11,65 8,167 1,893 10,51 4,017 14,37 1,907 1,84

(16)

13

A.2.5. Persentase

cover area

terumbu karang di Kotal dan Pemuteran Timur

Kode Kotal Pemuteran Timur

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 0,167 1,67 0,4 0,117 ACB 0,133 5,31 0,347 19,71 5,147 9 1,893 1,19 1,853 0,307 0,493 ACO 0,51 0,187 ACT 5,6 1,57 1,11 1,19 0,907 0,33 0,813 AGO 0,147 EUP 0,71 0,017 1,387 FAV 0,96 0,41 0,613 0,387 1,547 0,1 0,88 1,68 1,113 1,153 FNG 0,107 1,093 0,147 0,107 0,36 0,147 4,59 0,147 1,08 0,113 GAL 0,1 0,153 0,04 GON 0,15 1,06 0,1 0,56 0,1 LOB MER 0,173 0,133 MNT 11,8 4,15 11,36 14,96 35,45 43,19 6,79 0,88 15,11 3,8 51,69 1,147 MSO OHC 1,96 0,16 0,71 0,173 0,533 1,01 1,76 0,07 1,573 PAC 0,533 PAV 0,867 0,4 PCL 1,117 0,15 0,573 0,133 1,747 0,1 0,153 0,64 PEC 0,17 PBR 3,47 7,01 4,8 11,61 3,113 5,68 46,18 3,61 0,587 0,8 PMS 0,56 0,68 0,6 0,49 1,093 0,76 1,387 SER 0,47 0,413 0,053 STY 0,6 0,16 0,08 0,093 0,31 0,08 TUR CME/MIL CTU CHL HC 35,93 16,67 19,84 61,67 46,11 59,6 56,14 11,17 18,51 10,4 56,87 8,147 High susc 7,817 10,96 1,1 10,11 5,587 9 1,59 5,867 1,81 3,56 0,947 0,573 low susc 5,44 8,1 6,11 16,87 4,907 6,14 46,84 1,613 10,41 3,04 4,117 4,853

(17)

14

A.2.6. Persentase

cover area

terumbu karang di Pemuteran Barat dan Tabuhan

Kode Pemuteran Barat Tabuan

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 0,1 5,067 1,117 ACB 0,617 0,507 1,587 3,193 1,167 0,747 4,467 3,733 1,187 ACO 0,173 0,11 ACT 1 0,933 1,113 0,71 1,533 1,973 AGO 0,117 1,48 EUP 0,1 0,093 FAV 0,64 1,187 0,153 0,733 0,167 1,08 0,973 0,14 1 0,51 FNG 0,507 0,347 0,093 0,36 0,187 0,467 GAL 3,893 0,667 0,147 4,96 1,14 GON 0,14 0 LOB 0,333 0,187 MER 0,117 0,547 1,6 0,133 0,117 MNT 6,48 0,113 0,467 0,193 10,51 16,71 11,11 10,77 13,65 MSO 0,133 0,08 OHC 0,33 1,88 0,093 0,017 4,01 3,84 9,167 0,85 0,133 0,88 PAC 0,373 PAV 9,547 PCL 0,18 0,133 0,117 1,18 0,4 0,49 1,56 0,117 0,333 PEC 0,133 0,933 PBR 3,14 1,36 0,147 10,57 11,8 3,613 11,64 3,013 PMS 0,467 1,947 0,893 0,387 3,84 0,973 1,14 13,14 0,147 0,18 SER 0,347 1,617 0,333 0,68 0,117 STY 0,76 0,187 1,707 0,18 TUR CME/MIL 0,57 CTU CHL HC 4,517 11,09 17,16 6,153 1,14 16,9 31,51 59,16 0 68,08 33,45 10,64 High susc 1,853 1,48 5,387 1,613 0,413 6,11 4,787 5,917 0 14,37 7,33 1,747 low susc 1,107 3,133 9,68 3,08 0,8 6,347 13,37 14,79 0 11,81 15,11 4,18

(18)

15

A.2.7. Persentase

cover area

terumbu karang di S.K. Takad dan S.K. Tanjung

Kode Sumber Kima Takad Sumber Kima Tanjung

10/3 03/4 10/4 03/5 09/5 01/6 10/3 03/4 10/4 03/5 09/5 01/6 ACA 4,153 1,947 1,453 3,067 ACB 0,4 10,05 1,053 1,51 1,16 0,133 ACO ACT 0,6 0,133 AGO 0,05 EUP 1,453 0,173 1,017 0,48 0,053 FAV 0,693 1,11 1,373 3,153 1,04 1,03 4,113 0,76 4,71 FNG 1,587 0,147 1,987 0,973 0,187 3,107 GAL 0,307 0,6 3,307 0,187 0,1 0,333 1,4 GON 11,11 4,6 0,747 0,417 0,907 0,1 LOB 0,547 1,347 MER 0,307 0,173 3,96 3,947 MNT 0,56 1,44 0,733 1,907 3,153 1,11 1,853 4,91 MSO 0,113 OHC 0,467 0,813 1,017 1,31 0,48 0,66 PAC 1,14 0,83 0,307 0,053 PAV 0,333 PCL 0,413 0,56 1,387 0,68 0,56 0,1 0,467 PEC 0,733 0,76 1,4 0,147 3,51 0,413 1,48 PBR 0,44 11,09 0,773 0,71 0,193 7,587 PMS 3,31 1,507 1,64 1,907 0,99 0,71 1,453 0,173 1,91 SER 0,167 0,193 0,96 0,187 0,467 1,013 1,017 1,373 STY 0,413 0,187 1,813 1,533 0,533 0,68 0,933 TUR 0,51 0,16 CME/MIL CTU CHL HC 8,08 11,83 31,41 19,63 16,76 7,07 6,96 0 13,13 0 6,04 36,11 High susc 6,08 0,587 13,79 9,653 4,853 1,08 4,113 0 11,53 0 1,907 8,867 low susc 1,44 18,11 14,84 16,14 7,31 1,73 1,747 0 7,48 0 3,653 11,33

(19)

16

A.2.8. Persentase

cover area

terumbu karang di Wreck

Kode Wreck 10/3 03/4 10/4 03/5 09/5 01/6 ACA 3,16 1,84 1,18 ACB 4,49 3,89 4,707 18,57 1,117 8,133 ACO 0,173 ACT 1,573 3,51 5,693 1,853 AGO 0,617 0,107 EUP 1,067 FAV 1,88 5,4 1,093 3,167 0,867 1,467 FNG 1,113 0,067 0,387 GAL 0,16 0,413 0,167 0,1 GON 0,333 LOB 0,4 MER 1,653 1,71 0,4 MNT 5,093 1,84 1,787 4,133 8,773 11,44 MSO OHC 1,307 1,88 1,49 0,19 0,13 PAC 0,467 0,1 0,133 PAV 0,587 0,18 PCL 1,107 1,17 0,96 0,817 1,933 1,467 PEC 0,04 1,067 0,467 PBR 4,973 3,613 0,467 1,193 0,48 PMS 0,88 0,73 1,467 1,733 3,4 0,617 SER 1,4 0,333 0,333 3,067 1,053 1,68 STY 0,193 1,09 1,067 0,173 TUR CME/MIL 1,17 CTU CHL HC 17,61 17,77 13,86 34,8 15,54 30,81 High susc 11,73 11,15 14,48 14,6 10,11 14,71 low susc 7,893 10,16 4,907 6,067 5,817 4,193

(20)

 

17

Lampiran B. Persentase Hard Coral Cover (% HCC) dan perbandingan antar waktu

pengambilan untuk tiap-tiap wilayah kajian

B.1. Persentase

Hard Coral Cover

B.1.1. Lokasi 1. Utara Pulau

B.1.2. Lokasi 2. Wreck

B.1.3. Lokasi 3. Mangrove

B.1.4. Lokasi 4. Pos 2

(21)

 

18

B.1.7. Lokasi 7. Takad Saru

B.1.8. Lokasi 8. Kotal

B.1.9. Lokasi 9. Batu Licin

B.1.10. Lokasi 10. Teluk Kelor

(22)

 

19

B.1.13. Lokasi 13. Pemuteran Timur

B.1.14. Lokasi 14. Pemuteran Barat

(23)

 

20

Perbandingan pengambilan I&II

0 10 20 30 40 50 60 70 Utar a P ulau Wre ck Ma ngro ve Pos 2 Tanj. Ge lap Lab . Lala ng Tak ad S aru Kota l Batu Lici n Telu k K elor S.K . Tak ad S.K. Tan jung Pem . Tim ur Pem . Ba rat Tabu han Lokasi P e rsen tase Okt03 Mart04

Perbandiang pengambilan II&III

0 10 20 30 40 50 60 70 80 Uta ra P ula u Wre ck Man gro ve Pos 2 Tan j. G elap Lab. L ala ng Tak ad S aru Kot al Batu Lic in Tel uk K elo r S.K . T akad S.K . T an jung Pem . T imur Pem . B ara t Tab uha n Lokasi Pe rs e n ta s e Mart04 Okt04

B.2. Perbandingan antar waktu pengambilan

B.2.1. Perbandingan pengambilan I dan II

B.2.2. Perbandingan pengambilan II dan III

 

 

 

 

 

 

 

 

 

 

 

 

 

(24)

 

21

Perbandingan pengambilan III&IV

0 10 20 30 40 50 60 70 80 Utar a Pu lau Wr eck Man grov e Pos 2 Tanj . G elap Lab. Lala ng Taka d S aru Kota l Batu Lic in Telu k Ke lor S.K . Tak ad S.K . Tan jung Pem . Tim ur Pem . Bar at Tabu han Lokasi P e rs en ta se Okt04 Mart05

Perbandingan pengambilan IV&V

0 10 20 30 40 50 60 70 80 Utar a P ula u Wre ck Ma ngro ve Pos 2 Tan j. G elap Lab. La lang Taka d S aru Ko tal Ba tu L icin Tel uk K elo r S.K. Tak ad S.K. Tan jung Pem . Timur Pe m. Ba rat Tabu han Lokasi P e rsen ta se Mart05 Septm05

B.2.3. Perbandingan pengambilan III dan IV

 

 

 

 

 

 

 

 

 

 

 

B.2.4. Perbandingan pengambilan IV dan V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(25)

 

22

Perbandingan pengambilan V&VI

0 10 20 30 40 50 60 70 Uta ra P ula u Wre ck Man gro ve Po s 2 Tan j. G ela p La b. L ala ng Tak ad S aru Ko tal Batu Lic in Telu k K elor S.K . Tak ad S.K . Tanj ung Pem . Ti mur Pe m. Ba rat Tab uha n Lokasi Per s ent a se Septm05 Febu06

Perbandingan pengambilan I&VI

0 10 20 30 40 50 60 70 Uta ra P ula u Wre ck Man gro ve Pos 2 Tan j. G elap Lab. Lal ang Tak ad S aru Kota l Bat u Li cin Telu k K elo r S.K . Tak ad S.K . T anju ng Pe m. T imur Pem . Bara t Tab uha n Lokasi Per s e n tase Okt03 Febu06

B.2.5. Perbandingan pengambilan V dan VI

 

 

 

 

 

 

 

 

 

 

 

B.2.6. Perbandingan pengambilan I dan VI

(26)

23

Lampiran C.

High

dan

Low susceptibility

untuk tiap-tiap wilayah kajian dan pada kedalaman

yang berbeda (3 dan10 m).

C.1.

High

dan

Low susceptibility

pada kedalaman 3 m

C.1.1. Wilayah batu Licin dan Wreck

C.1.2. Wilayah Utara Pulau dan Tanjung Gelap

(27)

24

C.1.4. Wilayah S.K. Tanjung dan S.K. Takad

C.1.5. Wilayah Mangrove dan Labuhan Lalang

(28)

25

(29)

26

C.2.

High

dan

Low susceptibility

pada kedalaman 10 m

C.2.1. Wilayah Mangrove dan Labuhan Lalang

C.2.2. Wilayah Kotal dan kelor

(30)

27

C.2.4. Wilayah Takad Saru dan tabuhan

C.2.5. Wilayah S.K. Tanjung dan S.K. Takad

(31)

28

(32)

29

Lampiran D.

SST untuk wilayah Bali

D.1. SST tahun 2003

(33)

30

(Ki-ka) (tanggal/bulan) Baris 1: 16/01, 14/02, 24/03, 18/04, baris 2: 20/04, 04/06, 23/07, 16/08, baris 3: 17/09, 11/10, 14/11, 22/12.

D.2. SST tahun 2004

(34)

31

(Ki-ka) (tanggal/bulan) Baris 1: 21/01, 06/02, 10/03, 11/03, baris 2: 22/06, 24/07, 17/08, 26/9, baris 3: 04/04, 12/04, 20/04, 28/04,

baris 3: 12/10, 13/11

(35)

32

D.4. SST tahun 2006

(36)

33

Lampiran E.

Anomali perairan untuk wilayah Bali

E.1. Anomali tahun 2003

(37)

34

E.3. Anomali tahun 2005

(38)

35

 

 

Lampiran F.

SSH untuk beberapa titik disekitar wilayah Bali

F.1.

SSH Utara Bali dan

smoothed

180

162

144

126

108

90

72

54

36

18

1

0.2

0.1

0.0

-0.1

-0.2

Index

S

S

H

(

m

et

er

)

MA PE 316.212 MA D 0.068 MSD 0.007 A ccuracy Measures A ctual Fits Variable

Trend Analysis Plot for SSH Utara Bali

Linear Trend Model

Yt = -0.0194 + 0.000213*t

180

162

144

126

108

90

72

54

36

18

1

0.2

0.1

0.0

-0.1

-0.2

Index

SSH

Length 12 Moving Average MAPE 238.358 MAD 0.067 MSD 0.007 Accuracy Measures Actual Smoothed Variable

(39)

36

 

 

F.2.

114.9E 8.6S

160

144

128

112

96

80

64

48

32

16

1

0.3

0.2

0.1

0.0

-0.1

-0.2

-0.3

Index

me

te

r

MA PE 119.838 MA D 0.087 MSD 0.012 A ccuracy Measures A ctual Fits Variable

Trend Analysis Plot for 114.9 8.6S

Linear Trend Model

Yt = -0.0265 + 0.000292*t

F.3.

114.6E 8.4S

160

144

128

112

96

80

64

48

32

16

1

0.3

0.2

0.1

0.0

-0.1

-0.2

-0.3

Index

me

te

r

MA PE 140.948 MA D 0.077 MSD 0.009 A ccuracy Measures A ctual Fits Variable

Trend Analysis Plot for 114.6 8.4S

Linear Trend Model

Yt = -0.0264 + 0.000303*t

(40)

37

 

 

F.4.

115.1E 7.9S

160

144

128

112

96

80

64

48

32

16

1

0.2

0.1

0.0

-0.1

-0.2

Index

me

te

r

MA PE 184.770 MA D 0.057 MSD 0.005 A ccuracy Measures A ctual Fits Variable

Trend Analysis Plot for 115.1 7.9S

Linear Trend Model

Yt = -0.0212 + 0.000282*t

F.5.

114.9E 8.6S

160

144

128

112

96

80

64

48

32

16

1

0.3

0.2

0.1

0.0

-0.1

-0.2

-0.3

Index

me

te

r

MAPE 119.838 MAD 0.087 MSD 0.012 Accuracy Measures Actual Fits Variable

Trend Analysis Plot for 114.9 8.6S

Linear Trend Model

Yt = -0.0265 + 0.000292*t

(41)

38

 

 

F.6.

115.6E 8.6S

160

144

128

112

96

80

64

48

32

16

1

0.2

0.1

0.0

-0.1

-0.2

Index

me

te

r

MA PE 167.052 MA D 0.071 MSD 0.008 A ccuracy Measures A ctual Fits Variable

Trend Analysis Plot for 115.6 8.6S

Linear Trend Model

Yt = -0.0194 + 0.000323*t

F.7.

115.4E 9.1S

160

144

128

112

96

80

64

48

32

16

1

0.3

0.2

0.1

0.0

-0.1

-0.2

-0.3

Index

me

te

r

MAPE 115.649 MAD 0.096 MSD 0.014 Accuracy Measures Actual Fits Variable

Trend Analysis Plot for 115.4 9.1S

Linear Trend Model

Yt = -0.0157 + 0.000299*t

(42)

39

 

 

F.8.

115.4E 7.9.S

160

144

128

112

96

80

64

48

32

16

1

0.2

0.1

0.0

-0.1

-0.2

Index

me

te

r

MA PE 135.216 MA D 0.056 MSD 0.005 A ccuracy Measures A ctual F its Variable

Trend Analysis Plot for 115.4 7.9S

Linear Trend Model

Yt = -0.0210 + 0.000300* t

Referensi

Dokumen terkait

Setelah melalui proses pengolahan data, didapat bahwa kondisi sungai Pepe Baru berdasarkan struktur bangunan prasarananya adalah 83.71% dan termasuk kategori BAIK,

Sеlama kеgiatan produksi bеrlangsung, PT Pupuk Kalimantan Timur sеlalu mеlalukan pеngеcеkan tеrhadap produk yang dihasilkan sеcara rutin dan bеrkala. Hasil produksi

In loblolly pine, the tap root biomass fraction showed an average 94% increase in response to elevated CO 2 and an average 29% increase in response to high nitrogen treatment

Memperhatikan ketentuan-ketentuan dalam Perpres Nomor : 54 Tahun 2010 beserta perubahannya dan Petunjuk Teknisnya dalam Perka LKPP Nomor : 06 Tahun 2012, maka bersama

NIP : 197912222005012003 Email :franxa22_2@yahoo.co.id Unit Kerja :Fakultas Bahasa dan Seni Status :Dosen. Keahlian

Pengaruh Disiplin Kerja dan Motivasi Terhadap Kinerja Karyawan Pada Rumah Sakit Umum Daerah Kanjuruhan Malang : Jurnal Ilmu Manajemen.. Ardansyah &

• Yg membahayakan diri sendiri maupun orang lain • Tidak dapat dikendalikan dengan obat atau terapi.

Ketentuan Pasal 7 dalam Peraturan Kepala Badan Meteorologi, Klimatologi, dan Geofisika Nomor 10 Tahun 2013 tentang Jabatan, Kelas Jabatan, dan Tunjangan Kinerja Pegawai di