• Tidak ada hasil yang ditemukan

TCW097 Pacific II TCW097. Dimensions in mm

N/A
N/A
Protected

Academic year: 2021

Membagikan "TCW097 Pacific II TCW097. Dimensions in mm"

Copied!
11
0
0

Teks penuh

(1)

Waterproof Luminaire

TCW097 Pacific II

Features

• Dust-and moisture-proof

• Impact resistant

• Specially designed toggles

protects against dust and

water ingress

• Easy installation and

maintenance using toggles and

mounting brackets

• Luminaire is integrated and

prewired with control gear

Materials and finish

Housing: poly-carbonate (PC) in

cream base color

Cover: clear poly-carbonate (PC)

Toggles: stainless steel

Mounting bracket: stainless steel

Installation and mounting

Electrical connection through the

provided cable gland (PG13.5)

Method: surface mount or

suspension (with provided

mounting bracket)

Options

Fused terminal block

Emergency lighting

Other electrical system

i.e. 230-240V, 60Hz

TCW097 Pacific II

Functional impact-, dust-, and

jetproof luminaire for single and

twin TL’D and TL’5 fluorescent

lamps for indoor applications.

Housing and cover of TCW097

are made of high quality

poly-carbonate which has an excellent

impact resistant property.

Available with conventional or

high-frequency (HF) electronic

control gears. Can be ceiling

mounted or suspended. Equipped

with mounting brackets, mounting

is made easy via screws without

drilling into the luminaire housing.

Gear tray and metal toggles are

pre-installed; cable gland and

mounting brackets are delivered

with the luminaire.

Classifications

IP66

IK08

Class I

Comply with IEC598

Main Applications

• General Industry

• Food & Beverage Industry

• Dusty Areas

• Wet & Moist Areas

• Car Parks

• Storage areas

TCW097

Dimensions in mm

Type A B C D TCW097/114,TCW097/118 660 100 676 417 TCW097/128,TCW097/136 1270 100 1276 880 TCW097/135,TCW097/158 1570 100 1576 590 TCW097/214,TCW097/218 660 150 676 417 TCW097/228,TCW097/236 1270 150 1276 880 TCW097/235,TCW097/258 1570 150 1576 590

(2)

Type Lamp Gross wt. Packing dimensions Qty per Ordering (kg) (mm) box numbers For TL’D Lamps TCW097 1XTL-D18W HFE 1xTL’D 18W 2 664x108x99 1 9104 019 83680 TCW097 1XTL-D18W I 1xTL’D 18W 2.1 664x108x99 1 9104 019 83880 TCW097 1XTL-D18W IC 1xTL’D 18W 2.1 664x108x99 1 9104 019 84080 TCW097 1XTL-D36W HFE 1xTL’D 36W 2.8 1274x108x99 1 9104 019 84680 TCW097 1XTL-D36W I 1xTL’D 36W 2.9 1274x108x99 1 9104 019 84880 TCW097 1XTL-D36W IC 1xTL’D 36W 2.9 1274x108x99 1 9104 033 20080 TCW097 1XTL-D58W HFE 1xTL’D 58W 4.8 1574x108x99 1 9104 033 20280 TCW097 1XTL-D58W I 1xTL’D 58W 4.9 1574x108x99 1 9104 033 20480 TCW097 1XTL-D58W IC 1xTL’D 58W 4.9 1574x108x99 1 9104 033 20680 TCW097 2XTL-D18W HFE 2xTL’D 18W 2.4 664x108x99 1 9104 033 21080 TCW097 2XTL-D18W I 2xTL’D 18W 2.6 664x108x99 1 9104 033 21280 TCW097 2XTL-D18W IC 2xTL’D 18W 2.6 664x108x99 1 9104 033 21480 TCW097 2XTL-D36W HFE 2xTL’D 36W 4.6 1274x108x99 1 9104 033 22080 TCW097 2XTL-D36W I 2xTL’D 36W 4.8 1274x108x99 1 9104 033 22380 TCW097 2XTL-D36W IC 2xTL’D 36W 4.8 1274x108x99 1 9104 033 22480 TCW097 2XTL-D58W HFE 2xTL’D 58W 6 1574x108x99 1 9104 033 22680 TCW097 2XTL-D58W I 2xTL’D 58W 6.2 1574x108x99 1 9104 033 22880 TCW097 2XTL-D58W IC 2xTL’D 58W 6.2 1574x108x99 1 9104 033 23080 For TL’5 Lamps TCW097 1XTL-D14W HFA 1xTL’5 14W 2 664x108x99 1 9104 019 83480 TCW097 1XTL-D28W HFA 1xTL’5 28W 2.1 1274x108x99 1 9104 019 84280 TCW097 1XTL-D35W HFA 1xTL’5 35W 2.8 1574x108x99 1 9104 019 84480 TCW097 2XTL-D14W HFA 2xTL’5 14W 2.9 664x108x99 1 9104 033 20880 TCW097 2XTL-D28W HFA 2xTL’5 28W 4.8 1274x108x99 1 9104 033 21680 TCW097 2XTL-D35W HFA 2xTL’5 35W 4.8 1574x108x99 1 9104 033 21880

Note: I = electromagnetic ballast, IC = electromagnetic ballast+capacitor, HFE = electronic ballast (EB-S) for TL’D lamps, HFA = electronic ballast for TL’5 lamps Standard products with electromagnetic ballast are for 220V 50Hz system

Specification subject to change without prior notice

(3)

St. No. Work Order Qty Equipment St. No. Work Order Qty Equipment

100 1 Ambil Frame Body, letakkan pada 1

shooter

2 Pasang pada Frame Body :

- Seat Lock Comp 1

- Bolt Flange 6x12, kencangkan 2 UW 6 SLDK hsb 10 mm

2 Pasang pada Frame Body :

- Grommet A/C Case 2

102 1 Pasang pada Jig Press M/C : 103 1 Pasang pada Jig Press M/C :

NUM - Race Steering Top Ball 1 NUM - Race Steering Top Ball 1

- Race Steering Bottom Ball 1 - Race Steering Bottom Ball 1

2 Ambil Frame Body, dari kereta 2 Ambil Frame Body, dari kereta

letakkan pada Jig Press M/C letakkan pada Jig Press M/C

3 Injak Foot Switch untuk menjalankan Press M/C 3 Injak Foot Switch untuk menjalankan Press M/C

siklus kerja mesin siklus kerja mesin

4 Scan Barcode Frame dan Barcode Numbering M/C 4 Scan Barcode Frame dan Barcode Numbering M/C

Lot Produksi untuk marking nomor Lot Produksi untuk marking nomor

Frame Body Frame Body

5 Selipkan Barcode pada Stay 5 Selipkan Barcode pada Stay

Frame Body Rear Grip Frame Body Rear Grip

6 Cek hasil Numbering 6 Cek hasil Numbering

7 Pasang pada Frame Body : 7 Pasang pada Frame Body :

- Horn Comp 1 - Horn Comp 1

- Bolt Flange 6 x 12, kencangkan 1 UW 6 SLDK - Bolt Flange 6 x 12, kencangkan 1 UW 6 SLDK

8 Ambil Frame Body dari mesin, hsb 10 mm 8 Ambil Frame Body dari mesin, hsb 10 mm

geser ke shooter (sebelah kanan geser ke shooter (sebelah kanan

jig Numbering) jig Numbering)

105 1 Pasang pada Frame Body :

- Wire Harness 1

106 1 Ambil Switch assy comb & Lock 1 107 1 Pasang pada Wire Harness

connect couplernya ke Wire Harness - Relay Assy Winker, 1

2 Pasang pada Wire Harness connect couplernya

- Switch Assy Rear Stop 1 - Unit Assy CDI, 1

connect kabelnya ke Wire Harness connect couplernya

109 1 Pasang pada Frame Body :

Switch Assy Comb. & Lock beri Lockted pada lubang screw

- Screw U Lock Flat 6 x 12, 2 UW 6 SLDK

kencangkan sdb 2

110 1 Pasang pada head pipe frame body :

- Stay Front Top Cover 1

- Bolt Flange 8 x 32, kencangkan 2 UW 6 SHDK hsb 12 mm

2 Pasang ke head pipe Frame Body :

- Guide Cable Black 1

- Bolt Flange 6 x 12, putar 3-4 ulir 1

(4)

114 1 Pasang di Race St. Bottom Ball 115 1 Connect coupler Key Set

(di Head Pipe Frame Body) : ke coupler Wire Harness

- Steel Ball #6 mm, diberi grease 29 Steel Ball Plate 2 Pasang pada Wire Harness

2 Pasang pada Frame Body (under) : - Rectifier Comp. Regulator,

- Fender Rear Inner, tekan 1 connect kabelnya ke Wire Harness

3 Pindahkan dan balik Frame Body,

letakkan pada jig sub line

116 1 Semprot hasil numbering dengan 117 1 Bersihkan lubang untuk Pipe Rear 1

Air Gun untuk menghilangkan debu / Air Gun Brake Pivot

kotoran 2 Ambil Pedal Comp. Brake, pasang 1

2 Olesi hasil Numbering dengan Clear Kuas pada lubang pivotnya:

3 Pasang pada Pipe Rr Brake Pivot : - Pipe Rr Brake Pivot (dari arah luar 1

- Pin Split 3.0x25, tekuk 1 Long Nose Pedal Comp. Brake, ujung Pivot

di-4 Ambil Barcode dari stay Rear Grip Plier olesi grease), pukul Palu Plastik

5 Cocokkan hasil numbering di 3 Kaitkan Pipe Rr Brake Pivot

Barcode dengan di Frame Body pada lubang di Frame Body

6 Kembalikan Barcode ke stay Rr. Grip 4 Pasang pada Frame Body (under) :

7 Rapikan Fender rear inner - Stand Comp Main, 1

(tekan Pipe Rr Brake Pivot pada Frame Body hingga keluar dari sisi kanan lubang Pipe Rr Brake Pivot)

118 119 1 Connect kabel Wire Harness ke 1

Horn Assy

2 Ambil Hook Main Stand Spring, 1

pasang :

- Spring D Main Stand 1

3 Kaitkan Hook Main Stand Spring

pada guide di Frame Body

4 Kaitkan ujung Spring D Main Stand Obeng pengait

pada guide di Stand Comp Main spring

5 Pasang pada stay di Stand Comp

Main (bawah) :

- Rubber Stand Stopper HH 02, 1 tekan dengan Stand Comp Main

120 1 Balik Frame Body kerjasama 121 1 Pasang pada Frame Body :

dengan stasiun 121 - Case Battery Assy 1

2 Pasang pada Frame Body : 2 Pasang pada cover Case Battery

- Fuel Tank Assy 1 dan Case Battery (front dan rear) :

- Bolt Flange 6 mm, kencangkan 1 UW 6 SLDK hsb 10 mm

3 Pasang pada Fender Rear Inner dan

Case Battery :

- Bolt Flange 6 mm, kencangkan 1 UW 6 SLDK hsb 10 mm

4 Rapikan kabel Wire Harness

5 Balik Frame Body kerjasama dengan

stasiun 120

122 1 Pasang pada Air Cleaner : 123 1 Pasang pada Frame Body :

- Guide Air Vent Tube 1 - Air Cleaner Assy 1

- Bolt Hex 6 x 14, kencangkan 1 UW 6 SLDK 2 Pasang pada Air Cleaner dan stay

hsb 10 mm L di Frame Body

2 Pasang pada cover Case Battery - Washer Chain Case Setting 1

dan Case Battery (front dan rear) : - Bolt Hex 6 x 14, kencangkan 1 UW 6 SLDK

- Bolt Flange 6 mm, kencangkan 2 UW 6 SLDK hsb 10 mm

hsb 10 mm 3 Pasang pada Fuel Tank Assy :

3 Pasang pada Fuel Tank Assy : - Bolt Flange 6 x 12, kencangkan 1 UW 6 SLDK

- Bolt Flange 6 x 12, kencangkan 1 UW 6 SLDK hsb 10 mm

hsb 10 mm 4 Pasang pada Rectifier comp regulator

- Bolt Flange 6 x 12, kencangkan 1 UW 6 SLDK hsb 10 mm

(5)

125 1 Pasang pada Fuel Tank Assy : (bagian atas)

- Bolt Flange 8 x 16, kencangkan 2 UW 6 SHDK hsb 12 mm

2 Pindahkan Frame Body dari sub line

ke shooter

126 1 Lepaskan isolasi kertas yang

ENG menutupi lubang Pipe Inlet

2 Angkat Engine Assy dari kereta, 1 Jig Sub Engine

letakkan di atas jig Sub Engine Air Hoist 120

3 Pasang pada Engine :

- Stay Leg Shield 1

- Bolt Hex 6 x 20, kencangkan 2 UW 6 SLDK hsb 10 mm

127 1 Pasang pada Engine Assy (under) :

- Step Bar Assy 1

- Bolt Washer 8 x 20, kencangkan 4 UW 9 SK hs 12 mm

2 Selipkan Tube Breather 5 x 320,

di antara Step Bar dan Engine

3 Letakkan Engine di atas palet

4 Geser palet ke St. berikutnya Shooter Engine

Pallet Engine

401 1 Angkat Engine dari pallet Hois Endo 201 1 Ambil Frame Body dari shooter,

dan letakkan di jig main line 1 EHW 120 setting pada jig dengan Engine

2 Geser palet ke shooter bawah 2 Pasang ke Frame Body dan Engine :

3 Ambil Cushion Assy Rear dari kereta, 2 - Bolt Hex 8 x 100 / Rr Engine Under 1

letakkan Cushion L Rr di Conveyor - Bolt Hex 8 x 110 Kuning 1

4 Pasang pada Frame Body 3 Luruskan Side Stand ke arah

- Washer Plain 12 mm 1 bawah

- Cushion Assy Rear sebelah 1

kanan

402 1 Bantu St. 201, pasang Frame Body 202 1 Pasang antara Pipe In Under dan

pada Engine Engine (kiri) :

2 Pasang pada bolt Engine (under) : - Gasket Assy 1

- Washer Spring 8 mm 1 2 Pasang pada Pipe In Under dan

- Nut Hex 8 mm, kencangkan 1 UW 131 EK Engine :

hs 14 mm - Clamper Fuel Tube 1

3 Pasang pada bolt Engine (upper) : - Bolt Flange 6x28, putar 1 UW 6 SSLDK

- Nut Hex 8 mm, kencangkan 1 UW 131 EK hsb 10 mm

hs 14 mm 3 Pasang di bolt Cushion L Rear di

Frame Body :

- Washer Plain 12 mm 1

- Cushion Assy Rear sebelah kiri 1

- Washer 10.2 x 20 1

- Nut Hex 10 mm, putar 3-4 ulir 1 901 1 Beri marking warna merah

pada socket

2 Cek dan kecangkan nut hex Torque Wrench

8 mm pd Engine Hanger Upper Wrench manual hs 14 mm 3 Cek dan kecangkan nut hex Torque Wrench

8 mm pd Engine Hanger Under Wrench manual

403 1 Ambil Set Start Magnetic sub dan 1

connect coupler kabelnya ke Wire Harness

2 Kaitkan kabel Magnetic di Wire

Harness ke dua bolt di Set Start Magnetic sub

3 Pasang pada bolt di Set Start

Magnetic :

(6)

4 Rapikan kedua cover kabel hsb 10 mm Magnetic pada Wire Harness

5 Pasang pada Stay Starter Magnetic switch

- Set Start Magnetic sub

404 1 Pasang pada Pipe In (under) dan 204 1 Pasang di bolt Cushion L Rear di

Engine : Frame Body :

- Bolt Flange 6x28, kencangkan dan 1 UW 6 SSLDK - Washer 10.2 x 20 1

kencangkan Bolt Flange 6x28 (di kiri) hsb 10 mm - Nut Hex 10 mm, putar 3-4 ulir 1

2 Ambil Spring Stop Switch, kaitkan 1 2 Rapikan Tube Air Vent. (kaitkan)

ke dalam Spring Brake Pedal pada clip Engine

3 Ambil Pipe Assy Rear Grip, pasang 1 3 Connect Coupler ACG dari Engine

pada Frame Body dengan : ke coupler di Wire Harness

- Bolt Flange 8x16, kencangkan 1 UW 6 SLDK 4 Pasang pada Pipe Rear Grip dan

hsb 14 mm Frame Body :

- Bolt Flange 8x16, kencangkan 1 UW 6 sldk hsb 14 mm

405 1 Pasang pada Frame Body : 205 1 Angkat Swing Arm sub dari shooter, 1

- Coil Assy Ignition 1 letakkan di atas conveyor

kencangkan Screw Pan 5 x 20, UW 6 SLDK 2 Pasang pada Frame Body

connect kabelnya sdb. 3 (pada lubang bolt pivot)

2 Bantu pasang Swing Arm ke - Swing Arm sub

Frame Body - Bolt Swing Arm Pivot 1

3 Pasang pada Cushion Assy Rear 3 Connect Coupler ACG dari Engine

sebelah kanan ke coupler di Wire Harness

- Washer 10.2 x 20 1

- Nut Hex 10 mm, putar 3-4 ulir 1

406 1 Pasang pada Bolt Swing Arm Pivot : 206 1 Connect Coupler ACG dari Engine

- Nut Hex 10 mm, putar 3-4 ulir, 1 UW 9 SK ke coupler di Wire Harness

kencangkan hs 14 mm 2 Ambil Chain Drive dari box, 1

2 Pasang pada bolt Rear Cushion kaitkan Chain Drive pada Sprocket

under ( di Swing Arm ) : Engine dan Flange

- Washer 10.2 x 20 1 3 Kaitkan (pasang) Arm Swing pada

- Nut Flange Cap 10 mm, kencangkan 1 UW 9 SK lubang Rear Cushion L

3 Pasang pada kabel coil assy Ignition hs 14 mm 4 Ambil dari kereta dan pasang pada

.- Cap Noise Suppressor Swing Arm :

4 Kencangkan Bolt Hex 6x20 pada UW 6 SLDK - Case Assy Drive Chain 1

Stay Leg Shield R Side hsb 10 mm

407 1 Pasang pada Race Steering 207 1 Kencangkan Bolt Hex 6x20 pada UW 6 SLDK

Top Ball : Stay Leg Shield R Side hsb 10 mm

- Steel Ball #6 mm, diberi grease 23 Steel Ball Plate 2 Pasang pada Case Drive Chain dan Swing Arm :

- Washer Chain Case Sett. 1

- Bolt Flange 6 x 10 Hitam, 1 UW 6 SLDK

kencangkan hsb 10 mm

(magnet)

3 Pasang pada bolt Rear Cushion

under ( di Swing Arm ) :

- Washer 10.2 x 20 1

- Nut Flange Cap 10 mm, 1

4 kencangkan nut Rear Cushion upper UW 9 SK

(7)

408 208 1 Rapikan Tube Air Vent. (kaitkan) pada clip Engine

2 Kaitkan Tube Over Flow Carburator

pada Clamper Over Flow

3 Connect Cable ACG dari Engine

ke coupler di Wire Harness

4 Rapikan Cover Coupler ACG

5 Kencangkan Bolt Flange 6x28 UW 6 SLDK

hsb 10 mm

6 Pasang pada Case Drive Chain

dan Swing Arm :

- Washer 6 x 9 1

- Bolt Flange 6 x 10 Hitam, 1 UW 6 SLDK

kencangkan hsb 10 mm

409 1 Connect kabel set Start Magnetic ke 209 1 Ambil Cover L Rr Crank Case dari 1

Wire Harnnes box, pasang pada Engine

2 Pasang pada Rear Brake Panel 2 Pasang pada Cover L Rr Crank Case

(bagian bawah) dan Engine :

- Bolt A Brake Stopper 1 - Bolt Flange SH 6 x 28, kencangkan 2 UW 6 SLDK

3 Kaitkan Arm Rear Brake Stopper ke hsb 8 mm

Bolt A Brake Stopper 3 Pasang pada bolt Swing Arm Pivot

4 Pasang di ujung Bolt A Stopper Arm ; dan stay di Frame Body :

- Rubber Stopper Arm 1 - Bracket L Pillion Step 1

- Washer 8 mm 1 - Collar Pillion Step Mounting 1

- Nut Hex 8 mm, kencangkan 1 UW 6 SLDK 4 Pasang pada Bracket L Pillion Step

hsb 12 mm dan stay di Frame Body :

5 Pindahkan Frame Body ke main line Hoist - Washer Plain 8 mm 1

- Bolt Hex 8 x 20, kencangkan 1 UW 9 SK hs 14 mm

501 1 Turunkan unit motor dari hoist, 301 1 Pasang di bolt L Swing Arm Pivot :

letakkan di atas jig main line - Nut Hex 10 mm, kencangkan 1 UW 131 EK

2 Kembalikan Endo Hoist hs 14 mm

3 Kaitkan pada Frame Body : 2 Posisikan bolt Chain Adjuster ke

- Rear Fender sub 1 ujung Swing Arm

4 Connect coupler Tail Light ke 3 Bantu pasang Rear Fender sub

coupler di Wire Harness 4 Buka cover Carburator, letakkan di

Conveyor

902 1 Beri Marking da merah pada Socket

2 Cek dan kencangan nut hex 10 mm Torque Wrench

pada Swing Arm pivot Wrench manual

3 Pasang Box Utility ke Frame Body 1

4 Pasang pada bolt Swing Arm Pivot :

- Stay R Pillion Step 1

5 Ambil Spring Assy Rr Brake Pedal,

(8)

502 1 Pasang pada Rod Rear Brake : 302 1 Pasang ke Frame Body :

- Spring A Brake Rod 1 - Front Fork sub 1

2 Pasang pada Bracket Rear Brake 2 Pasang pada Steering Stem Up. :

(di Panel assy Rear) : - Race Steering Top Cone 1

- Joint B Brake Arm 1 - Thread Comp St Head Top 1

3 Masukkan ujung Rod Rear Brake * Keraskan Thread Comp sampai UW 131 EK

ke lubang Joint B Brake Arm putaran maximal hex socket

4 Pasang di ujung Rod Rear Brake * Kendorkan Thread Comp thread comp.

- Nut B Brake Rod Adjusting 1 sampai torque mendekati nol

putar 2 - 3 ulir * Keraskan Thead Comp sebatas

5 Pasang pada Bolt A Brake Stopper kekuatan tangan

- Pin Split 2.0 x 15, tekuk 1 Long Nose * Kendorkan kembali Thread

Plier Comp

503 1 Pasang cap noise ke busi 303 1 Pasang pada Pipe St.Stem :

2 Rapikan Tube Fuel Tank dan Tube - Washer Stem Nut 1

Carburator pada Clamper Fuel Tube. - Nut Steering Stem, kencangkan 1 UW 131 EK

Masukkan Tube Carburator ke SH 32X130

lubang di Frame Body 2 Ambil Barcode di Frame Body, Stempel no.

3 Kaitkan bolt Chain Adjuster R lalu beri stempel produksi

ke bracket di ujung (belakang) (no. urut produksi unit sepeda

Swing Arm Assy dan kencangkan UW 131 EK motor) dan selipkan kembali di

Nut U 12 mm (nut Rear Axle) hsb 17 mm antara Rear Cushion dan Chain

Case

903 1 Beri Marking da merah setelah

pengecekan

2 cek dan kecangan steering stem Torque

nut pada steering stem upper dengan Wrench manual

Socket 30 mm

3 tempelkan label Honda Genuine Part.

pada Arm Swing

504 1 Pasang pada Steering Stem : 304 1 Bekerja sama dengan st. 504,

- Steering Handle sub 1 pasang Steering Handle sub

2 Pasang pada Steering Handle sub 2 Pasang pada Holder St Handle

dan pipe Steering Stem : dan Pipe Steering Stem :

- Collar Handle Setting 1 - Bolt Flange 10x50 Kuning, 1 UW 131 EK

- Nut U Flange 10 mm, putar 2- 3 ulir, 1 kencangkan hs 14 mm

lalu tahan dengan spanner Spanner 17 mm 3 Pasang pada Box Utility-Frame Body :

3 Masukan hose front brake ke - Bolt Flange 6 mm, kencangkan 1 UW 6 SLDK

guide cable. hsb 10 mm

505 1 Connect coupler Switch assy Tang Connect 305 1 Pasang pada Bolt Fuel Tank : 1

Winker dan coupler Head light - Stay Body Cover

(dari Steering Handle) ke 2 (di Steering Handle), pasang di

2 coupler di Wire Harness Cover L Body :

Kencangan Nut Adjuster R UW 6 SLDK - Washer Seat Lock 1

hsb 10 mm - Spring Lock Key Set, tekan 1

(9)

506 1 Pasang pada Front Cushion R 306 1 Rapikan kabel

(di Front Fork assy) 2 Kencangkan Bolt Flange 6x12 UW R 6

- Axle Front Wheel, tekan hingga 1 Soft Hammer (Guide Kabel)

ulirnya keluar 3 Kencangan Nut Adjuster L UW R 6

2 Ambil Front Wheel Assy, letakkan 1

di atas conveyor dan pasang :

- Collar Front Wheel Side 1

- Gear Box assy Speedometer 1

3 Pasang di ujung Axle Fr. Wheel :

- Wheel Assy Front, sambil tekan Soft Hammer

Axle Fr. Wheel

4 Kaitkan stopper Front Cushion L

ke alur Gear Box Speedometer dan

tekan Axle Front Wheel hingga keluar Soft Hammer

keluar dari Fr. Cushion L

5 Pasang pada Clamper Brake Hose

Com Front Brake

.- Clamper B Brake House jepit 1

507 1 Pasang pada Engine (under) : 307 1 Kaitkan ujung Cable Spedometer

- Gasket Exhaust Pipe 1 ke Gear Box Speedometer, sambil

2 Ambil Cover R Body, pasang : 1 putar Front Wheel ke arah depan

- Screw Washer 6 x 16, kencangkan 1 UW 6 SLDK (berlawanan arah jarum jam)

sdb 3 2 Pasang pada ujung kabel throtle

3 Pasang pada Cover R/L Body (bagian cover carburator

depan) dan stay Cover Fr. Body : 3 Pasang pada poros transmisi

- Washer Plain 5 mm 1 (spindle gear shift) Engine assy :

- Nut Hex Cap 5 mm, putar 2-3 ulir 1 - Pedal Gear Change

508 1 Pasang pada Front Cushion R : 308 1 Pasang pada Axle Front Wheel :

- Caliper Assy R Front - Nut U 12 mm, kencangkan 1 UW 131 EK

- Bolt Torx 8x25, putar 2-3 ulir 1 hs 17 mm

2 Pasang pada ClamperB Brake Hose 2 Pasang pada Gear Change Pedal :

.- Bolt Flange 6x10 kencangkan 1 UW 6 SLDK - Bolt Hex 6x20, kencangkan 1 UW 6 SLDK

hsb 10 mm hsb 10 mm

3 Keraskan Nut Hex Cap 5 mm UW 6 SLDK

hsb 8 mm

4 Ambil Bracket R Pillion Step dari kereta 1

- Collar Pillion Step Mounting 1

- Nut Hex 10 mm 1

letakan di atas Conveyor

509 1 Pasang pada Engine (under) 309 1 Ambil Valve Set Throttle dan pegas

dan Bracket R Pillon Step : letakan di atas conveyor

- Muffler Comp Exhaust 1 2 Kaitkan Cable Throttle ke guide di

2 Pasang pada Engine (under) main pipe Frame Body

dan bracket Muffler (front) : 3 Pasang di ujung Cable Throttle :

- Nut Hex 8 mm, putar 2-3 ulir 2 - Valve Set Throttle

3 Ambil Bracket R Pillion Step di atas - Needle Set Jet

Conveyor pasang pada bolt Swing Arm 4 Pasang kembali Needle Set Jet,

- Collar Pillion Step Mounting (1) Valve Set Throttle dan Cover

- Nut Hex 10 mm, putar 2-3 ulir, (1) Carburator ke Carburator assy

5 Setting kekerasan Nut Rr. Brake UW 6 SLDK

(10)

510 1 Pasang pada Caliper Assy R Front 310 1 Pasang pada Gear Box Speedometer :

- Bolt Torx 8x25, kencangkan 1 UW 6 SLDK - Screw Oval 5x20, kencangkan 1 UW 6 SLDK

sd bintang sdb 3

2 Pasang pada Bracket R Pillion Step 2 Ambil Cover Main Pipe lalu 1

dan muffler pasang pada Frame Body

- Washer Plain 8 mm 2 3 Pasang pada Cover Main Pipe

- Bolt Hex 8 x 35, kencangkan 2 UW 9 SK (bagian depan atas) :

hs 12 mm - Screw Pan 5 x 11.5, kencangkan 1 UW 6 SLDK

sdb 3

4 Pasang pada Cover L Body (bagian

tengah/atas) dan Frame Body

- Screw Pan 5 x 11.5, kencangkan 1 UW 6 SLDK sdb 3

511 1 Keraskan Nut Hex 8 mm di Muffler UW 6 SLDK 311 1 Setting stay main pipe ( F/B) Soft Hammer

Assy (front) dan Engine hsb 12 mm dan stay Leg Shield untuk Obeng lancip

2 Setting stay main pipe ( F/B) Soft Hammer pemasangan cover L Main Pipe

dan stay Leg Shield untuk Obeng lancip 2 Pasang pada Cover Main Pipe

pemasangan cover R Main Pipe (depan) dan stay Fr. Body :

3 Ambil dari kereta Cover R Main Pipe - Cover L Main Pipe Assy

pasang pada Frame Body 1

512 1 Pasang pada Cover R Main Pipe assy 1 312 1 Pasang pada Cover L Main Pipe

(depan) pada Fr. Body Assy :

- Bolt Fairing Setting, ( kuning ) 1 UW 6 SLDK - Washer Plain 10 mm 1 UW 6 SLDK

kencangkan bagian atas sdb 3 - Screw special 6 mm, kencangkan 3 sdb 3

- Washer Plain 10 mm 1 2 Pasang pada Cover L Body (bagian

- Screw special 6 mm, kencangkan 1 UW 6 SLDK belakang/bawah) dan Frame Body.

bagian bawah sdb 3 - Screw Washer 6 x 16, kencangkan 1 UW 6 SLDK

sdb 3

513 1 Pasang pada Cover Main Pipe 313

(bagian belakang) :

- Screw special 6 mm, kencangkan 1 UW 6 SLDK sdb 3

2 Ambil Cover R Side dari kereta, 1

pasang pada Frame Body

3 Pasang pada Cover R Side :

- Screw special 6 mm, kencangkan 1 UW 6 SLDK

3 Kencangkan Nut Hex 10 mm, UW 131 EK

hs 14 mm

bagian depan

4 Kencangakan nut Hex 10 mm pada UW 9 SK

bracket pillion step HS 14mm

514 1 Ambil Cover Front Top Assy, 1 314 1 Pasang pada Cover L dan R Body

pasang di Head Pipe Frame Body (bagian belakang) :

2 Pasang pada Cover Front Top - Cover Tail, kaitkan, tekan 1

dan Stay Frame Body :

- Bracket Front Number Plate 1 2 Pasang pada Fuel Tank Assy

- Bolt Flange 6 x 20, kencangkan 2 UW 6 SLDK (depan) dan Frame Body :

hsb 10 mm - Seat Comp. Double 1

3 Pasang pada bracket Seat

Assy Double dan Frame Body :

- Nut Hex 6 mm, kencangkan 2 UW 6 SSHDK hsb 10 mm

(11)

515 1 Pasang pada Cover Front Top 315 1 Ambil Filler Gun pada Volumetric Volumetric

dan Stay Frame Body : untuk mengisi bensin pada

- Screw Front Cover, kencangkan 1 UW 6 SLDK Carburator dengan cara :

sdb 3 - masukan ujung Tube ke pipe inlet

2 Pasang pada Cover Tail Carburator

dan stay Frame Body : - tarik picu filler gun sampai getaran

- Screw Special 6 x 15, kencangkan 1 UW 6 SLDK pada fleksible hose berhenti

sdb 3 - lepaskan picu,setelah itu lepaskan

3 Pasang pada Cover R Side : tubefiller gun dari Carburator

- Screw special 6 mm, kencangkan 1 UW 6 SLDK 2 Pasang pada Cover L Main Pipe

bagian tengah sdb 3 Side dan Cover Front Top :

- Screw Washer 4 x 20, kencangkan 1 UW 6 SLDK sdb 3

3 Pasang pada Cover Tail

dan stay Frame Body :

- Screw Special 6 x 15, kencangkan 1 UW 6 SLDK sdb 3

516 1 Pasang pada Cover R Main Pipe 316 1 Scan no Frame dan no Engine

Side dan Cover Front Top : pada Barcode Reader

- Screw Washer 4 x 20, kencangkan 1 UW 6 SLDK 2 Beri stempel (warna unit) dan

sdb 3 tanggal produksi pada Barcode Tag

2 Pasang pada poros starter (spindle

kick start) di Engine Assy : - Kick Starter Assy

- Bolt Hex 6 x 22, kencangkan UW 6 SLDK hsb 10 mm

3 Pasang pada Cover R Body (bagian

tengah/atas )

- Screw Pan 5 x 11.5, kencangkan 1 UW 6 SLDK

Referensi

Dokumen terkait

Proses pencampuran kedua bahan baku Bahan baku dimasukkan ke dalam dengan perekat menggunakan cetakan untuk dikempa panas gun sprayer.. Dokumen

Tujuan kegiatan revitalisasi pada tahun 2016 adalah dekontaminasi ruangan HC 102 hingga bersih dengan paparan radiasi- dan kontaminasi radioaktif di bawah batas keselamatan

Agar dapat ber- bicara dengan hantu, Anda harus menyelesaikan quest dari Mage Lyssanore (Dark Ohm).. Setelah men- dapat benda incantation,

Kemudian pada penentuan konstanta pegas dengan metode gerak osilasi pada pegas yang dimuai dari pegas tunggal satu dengan massa beban berturut-turut sebesar 0,05

Terlihat pada gambar 7 pada kapasitas 8,069 L/s bahwa turbin dengan variasi kemiringan sudut sudu 25  menghasilkan daya yang terus meningkat hingga 18,61 Watt pada

Guru-guru tidak dibenarkan mengutip sebarang wang / yuran daripada murid-murid kecuali dengan kebenaran Guru Besar. Sekiranya ada kutipan wang, rekodnya atau rekod

Metode analisa kuantitatip didasarkan pada absorpsi radiasi oleh suatu unsur yang mengabsorpsi dan melibatkan pengukuran intensitas cahaya atau kekuatan

Kalimat pertama menjelaskan bahwa menggunakan handphone saat dalam pengisian daya sangat berbahaya terutama digunakan dalam ruangan yang mempunyai suhu tinggi.. Pilihan jawaban