• Tidak ada hasil yang ditemukan

TOR Lelang Switch Layer 2

N/A
N/A
Protected

Academic year: 2017

Membagikan "TOR Lelang Switch Layer 2"

Copied!
3
0
0

Teks penuh

(1)

H 0 H 30 + Lead Time Regional H 60 + Lead Time Regional

1. LATAR BELAKANG

Pemenuhan kebutuhan Material Switch CPE Layer 2 untuk penyambungan pelanggan.

2. TUJUAN

Tersedianya Switch CPE Layer 2 sesuai dengan spesifikasi teknis yang telah ditetapkan..

3. DESKRIPSI KEBUTUHAN BARANG & JASA

Barang dan jasa yang dibutuhkan dalam pengadaan ini adalah : 3.1. Switch CPE Layer 2

3.2. Jasa pengiriman Switch CPE Layer 2

4. RUANG LINGKUP PEKERJAAN

Lingkup pekerjaan pengadaan Material Switch CPE meliputi tapi tidak terbatas pada: 4.1. Project Management

4.2. Comply of Statement Document (kesesuaian spesifikasi)

4.3. Penyediaan dan Pengiriman Switch CPE Layer 2 ke Seluruh Gudang/ Wilayah ICON+

4.4. Penggantian material yang tidak kompatibel termasuk penjemputan dan pengiriman kembali material pengganti ke Gudang Regional ICON+

4.5. Supporting Garansi Material (after sales supporting )

5. JANGKA WAKTU

5.1.Pemenuhan pengiriman material tahap 1 dilakukan 30hari + lead time pengiriman regional sejak tanggal PO/DO diterbitkan oleh ICON+ (Tabel Lead Time Terlampir)

5.2.Pemenuhan pengiriman material tahap 2 dilakukan 60hari + lead time pengiriman regional sejak tanggal PO/DO diterbitkan oleh ICON+ (Tabel Lead Time Terlampir)

Dengan Timeline sebagai berikut :

6. SPESIFIKASI BARANG

6.1.Spesifikasi Material SWITCH CPE

i. Spesifikasi Teknis Umum

a. Tiap Switch CPE dilengkapi 2 Buah SFP Bidi (Bidirectional) original rekanan yang Cisco compatible dan compatible dengan perangkat distribusi ICON+ yang meliputi - Cisco 3600 Series

- Cisco 3750 Series - Cisco 3400 Series - Cisco 3800 Series - Cisco 7600 Series - Cisco 7200 Series

PO ICON+ kepada Rekanan Pemenang

Pemenuhan pengiriman Material tahap ke-1

(2)

- Cisco ASR 920 Series - Huawei S5700 Series - Juniper ACX 4000 Series - Juniper MX 480 Series

atau SFP Cisco Compatible yang lolos POC di ICON+ sesuai SED ICON+ Nomor : 05211/SE/001/PUSAT/ICON+/2015 dengan Merk 6COM atau GIGALIGHT, atau WAREX

b. Untuk Jenis/Jarak SFP :

LX = Memiliki range jarak 0-40km

c. Tiap – tiap material harus memiliki Serial Number dan Mac Address berbeda, baik untuk Perangkat CPE maupun SFP nya

ii. Spesifikasi Teknis Khusus

NO KUALIFIKASI TEKNIS MINIMUM REQ KETERANGAN

1 Up Link Port SFP Based (NNI) 1000 base-X 1 Gbps

Support ZX SFP

Support SFP CWDM CWDM Channel 1470 - 1610 nm

Support SFP Bi-Directional Single core

minimum 2 port

2 Down Link / Access Port (UNI) 10/100/1000 Base-T

minimum 2 ports

3 Standards VLAN (IEEE 802.1Q)

STP (IEEE 802.1d)

RSTP (IEEE 802.1w) MSTP (IEEE 802.1s)

IEEE 802.3ad

IEEE 802.3ah

IEEE 802.1ag

IEEE 802.1p CoS classification

4 Performance Support 4K VLAN ID

Support MTU 9000 bytes 5 Multicast Supports IGMP v1/v2/v3 snooping 6 Power AC Power Supply range 100 V to 240 V,

50/60 Hz

7 Management Supports re ote co figuratio a d maintenance by using Telnet.

Supports SNMP v1/v2/v3.

Supports SSH v2.

Supports Web management. Support Authentication methods AAA, RADIUS, and TACACS+

8 Metro Ethernet Services 802.1Q Tunneling

QinQ

Selective QinQ

IEEE 802.1ag Connectivity Fault Management provides standard support for transport fault management. It allows for discovery and verification of path for Layer 2 services.

Ethernet Local Management Interface enables service providers to communicate service configuration and status information to the customer-edge device IEEE 802.3ah Ethernet in the First Mile

(3)

NO KUALIFIKASI TEKNIS MINIMUM REQ KETERANGAN provides standard support for monitoring,

remote failure indication, loopback, and OAM discovery on the link between the customer equipment and service provider network.

ITU-T Y.1731 introduces the support for fault management functions, including alarm indication signal (AIS), remote defect indication (RDI) and locked signal (LCK) to detect and signal a failure in the service path

three Colour QoS

7. Bill Of Quantity (BoQ) 7.1. Material

BoQ General untuk 1 unit Switch CPE adalah :

No Part Jumlah Satuan

1 Switch (8 Acces port base-T, 1 port uplink 1000 base-X) 1 unit

2 SFP 1000base-LX, 1310, DDM 2 unit

3 1 year warranty support 1 unit

4 AC Power Cord (Europe) 1 unit

lulus PoC Kualifikasi Perangkat CPE Pada Layanan Ethernet L2 Periode 2015 – 2016

Total kebutuhan Switch CPE Layer 2 adalah 783 unit

7.2. Jasa Pengiriman Material

Lokasi Pengiriman :

No LOKASI

1 GUDANG JABODETABEK

2 GUDANG REGION BALI & NT

3 GUDANG REGION INTIM

4 GUDANG REGION JAWA BARAT

5 GUDANG REGION JAWA TENGAH

6 GUDANG REGION JAWA TIMUR

7 GUDANG REGION SUMBAGSEL

8 GUDANG REGION SUMBAGUT

Referensi

Dokumen terkait

Penelitian lebih lanjut menggunakan metode desain faktorial perlu dilakukan untuk melihat pengaruh masing-masing dan interaksi komponen CMC-Na dan Karbomer sebagai

Berdasarkan uraian latar belakang di atas, permasalahan yang akan dikaji dalam penelitian ini adalah sebagai berikut : Apakah Faktor Risiko Antara Pola Minum

bahan-bahan alami, kualitas produk kosmetik yang tahan lama, tidak mudah. rusak, tidak mengandung racun, tidak membahayakan kesehatan

Konsekuensi ekonomi adalah suatu konsep yang menegaskan bahwa, meskipun terlepas dari implikasi teori pasar sekuritas yang efisien, pilihan kebijakan akuntansi

4 Pengamatan pribadi di kelas IV MI PSM Sumberagung Tulungagung, tanggal 07 Mei 2015 5 Hasil Wawancara dengan bapak Budi Siswianta, Guru Mata Pelajaran IPS Kelas 3 SDN 2

(2) Rapat Pleno diadakan untuk membahas hasil Rapat Pengurus Internal Partai, Rapat Pengurus Bidang Pemerintahan, dan Rapat Pengurus Bidang Kerakyatan yang dihadiri oleh

 Definisi dari satu variabel akan memberikan tempat penyimpanan untuk variabel dan mendefinisikan tipe data yang akan ditangani dalam lokasi.  Mempunyai bentuk 

Pada metode ID-MFCC, komponen masukan sistem adalah nilai spectrum sinyal yang diperoleh melalui transformasi Fourier, maka pada metode 2D-MFCC sebagai komponen masukan sistem