• Tidak ada hasil yang ditemukan

ENVIRONMENTAL PROFILE OF CILIWUNG RIVER BASIN

N/A
N/A
Protected

Academic year: 2021

Membagikan "ENVIRONMENTAL PROFILE OF CILIWUNG RIVER BASIN"

Copied!
38
0
0

Teks penuh

(1)ENVIRONMENTAL PROFILE OF CILIWUNG RIVER BASIN.

(2) 3 D of Ciliwung Watershed. G. GEDE. G. SALAK G. PANGRANGO. Ciliwung river.

(3) CILIWUNG RIVER BASIN ECOSYSTEM AND ADMINISTRATION AREA. Total area of Ciliwung River Basin are 52,169 hectare Spring in Pangrango Mountain West Java dan Estuary in Jakarta Bay Administration Area: • West Java Province - Bogor Regency - Bogor City - Depok City • Capital City Jakarta Province (South Jakarta, East Jakarta, Center Jakarta, West Jakarta, and North Jakarta).

(4) PROBLEMS - Land Use Changes - Water Level Fluctuation (water level fluctuation ratio more than 100) - Water Quality Æ polluted from upstream to downstream ¾Solid Waste ¾Waste water Æ domestic waste - Land degradation Æ erosion and sedimentation.

(5) Gn GEDEPANGRANGO. Land Use Image of Upper Ciliwung River Basin in 1999 Source: Arwin & Nasa, 2003 & Lansat: S.Sobirin, 2004.

(6) BOGOR. Land Use Image of Middle Ciliwung River Basin in 1999 Source: Arwin & Nasa, 2003 & Lansat: S.Sobirin, 2004.

(7) How About Today?. HALIM P. Land Use Image of Lower Ciliwung River Basin in 1999 Source: Arwin & Nasa, 2003 & Lansat: S.Sobirin, 2004.

(8) Land Cover in 2000 & 2005.

(9) Land Cover on 2007 & 2008.

(10) Soil Map (Great Soil Group) in Ciliwung Watershed.

(11) Rainfall Station Map Surround Ciliwung Watershed.

(12) Isohyet Map in Ciliwung Watershed. Dry month 2–4. Dry month 1–3. Wet month 7–9. Wet month 8 – 10.

(13) Water Quality Categories of Ciliwung River Current Water Quality. Target Water Quality. No Class. III. DKI Jakarta. No Class. II. Depok. IV. II. Kab. Bogor. IV. II. Kota Bogor. IV. II. Kab. Bogor. IV. I. District DKI Jakarta.

(14) • Decreasing Spring Discharge. Degradation Facts in Ciliwung River/ Bopunjur Area Source: Landsat: S.Sobirin, 04 & N.Puspaningsih, 2003. Debit (liter/sec). Before. Ciburial. 2001. 700. 300. 50. 20. Batu/Salak Mountain. • Decreasing Amount and function of Small Dam Location Bogor Tangerang Bekasi Total. Year 1940. Year 1994. 122 (649,5 Ha). 102 (515 Ha). 45 (1.335 Ha). 19 (968 Ha). 17 (136 Ha). 8 (10 Ha). 184 (2.120 Ha). 129 (576,5 Ha). • Main Cause of flooding: Static Natural Condition: Geographic Position, Topographic, River Characteristic Dynamic Natural Event: Land Subsidence Due To Over Exploitation Of Ground Water Social-Economic: Deforestation, Development, River Bank Utilization, Law Enforcement.

(15) Jiwa. Population in Ciliwung River Basin in West Java Area. Based on population/km2 (data taken from BPS), River Basin Area, Population Growth Rate. 460000 450000 440000 430000 420000 410000 400000 390000 380000 370000 360000. 453748 436212. 396310. 1990. 400184. 2000. 2005. Tahun. 2008.

(16) WATER SAMPLING LOCATION FOR MONITORING WEST JAVA (9 location) : • Masjid Attaawun (West Java Province) • Cisampay (Bogor Regency, West Jbt. Panus Java Province • Leuwi Malang (Bogor Regency , PdkRajeg West Java Province) • Pasir Angin (Bogor Regency , West Java Province) • Katulampa (Bogor City, West Java Kdghalang Province • Kebun Raya (Kota Bogor, West JavaSempur Province) Katulampa • Kedung Halang (Kota Bogor , West Bd. Gadog Java Province) • Pondok Rajeg (West Java Province) • Jembatan Panus (Depok City, West Java Province). Cisarua Cisampay Atta’awun.

(17) WATER SAMPLING LOCATION FOR MONITORING Capital City (6 location) : • Jembatan Kelapa Dua (Capital CityJakarta) • Condet (Capital CityJakarta) • Manggarai (Capital CityJakarta) • Kwitang (Capital CityJakarta) • Gunung Sahari (Capital City Jakarta) • Pantai Indah Kapuk (Capital City Jakarta).

(18) Existing Condition OF CILIWUNG River Water Quality TREND KUALITAS AIR SUNGAI CILIWUNG 2005 - 2008 PARAMETER BOD. Atta'awun. mg/L. Cisampay. 10 9. Cisarua. 8. Bend. Gadog. 7. Katulampa. 6. Sempur. 5 4. 2. Kedung Halang Pondok Rajeg. 1. Panus. 3. 0 2005. 2006. 2007. 2008. BMA Kls II BOD = 3.

(19) Existing Condition OF CILIWUNG River Water Quality TREND KUALITAS AIR SUNGAI CILIWUNG 2005 - 2008 PARAMETER COD. Atta'awun Cisampay. mg/L 40. Cisarua. 35. Bend. Gadog. 30. Katulampa. 25 20. Sempur. 15. Kedung Halang. 10. Pondok Rajeg. 5. Panus. 0 2005. 2006. 2007. 2008. BMA Kls II COD = 25.

(20) Existing Condition OF CILIWUNG River Water Quality TREND KUALITAS AIR SUNGAI CILIWUNG 2005 - 2008 PARAMETER OKSIGEN TERLARUT (DO). Atta'awun. mg/L. Cisampay. 9 8. Cisarua. 7. Bend. Gadog. 6. Katulampa. 5. Sempur. 4. 2. Kedung Halang Pondok Rajeg. 1. Panus. 3. 0 2005. 2006. 2007. 2008. BMA Kls II DO =4.

(21) Existing Condition OF CILIWUNG River Water Quality TREND KUALITAS AIR SUNGAI CILIWUNG 2005 - 2008 PARAMETER pH 9. Atta'awun. 8 BM pH = 6 - 9. 7. Cisampay. 6. Cisarua. 5. Bend. Gadog. 4. Katulampa. 3. Sempur. 2. Kedung Halang. 1. Pondok Rajeg. 0 2005. 2006. 2007. 2008. Panus.

(22) Existing Condition OF CILIWUNG River Water Quality TREND of CILIWUNG RIVER WATER QUALITY IN 2005 - 2008 PARAMETER FECAL COLY Jml./100 mL 45000. Atta'awun. 40000. Cisampay. 35000. Cisarua. 30000. Bend. Gadog. 25000. Katulampa. 20000. Sempur. 15000. Kedung Halang. 10000. Pondok Rajeg. 5000. Panus. 0 2005. 2006. 2007. 2008. BMA Kls II Koli Tinja.

(23) Existing Condition OF CILIWUNG River Water Quantity TREND of CILIWUNG WATER DISCHARGE IN 2005 - 2008. Atta'awun. m3/sec. Cisampay. 14. Cisarua 12. Bend. Gadog. 10. Katulampa. 8. Sempur. 6. Kedung Halang. 4. Pondok Rajeg. 2. Panus. 0 2005. 2006. 2007. 2008.

(24) CILIWUNG RIVER BASIN. The average average of of water water quality quality The standard in in Ciliwung Ciliwung River River Basin Basin standard heavy polluted polluted (D), (D), evaluated evaluated isis heavy by IP IP Method Method or or STORET STORET by. Explanation of Water Quality Standard A ( Incompliance with Standard) B ( Slight Polluted) C ( Medium Polluted) D ( Heavy Polluted).

(25) Regulation – Goverment Regulation No. 82 Year 2001 about Water Quality Monitoring and Water Pollution Control – Goverment Regulation No. 42 Year 2008 about Water Resources Management.

(26) Efforts for Water Pollution Control in Ciliwung River Basin • Transboundary Synchronization and Coordination in Pollution and Degradation Control Programs in Ciliwung River Basin: - Sampling Points Agreement - Institutional Capacity Building - Coordination between Institutions - Data and Information Management.

(27) AGREEMENT ON WATER POLLUTION CONTROL AND MONITORING 1. Determining targets for water quality standard of achivement along 20 year are : • Upsteam area in Bogor Regency before entering Bogor City: Class I • Bogor City : Class II • River segment in Bogor Regency after Bogor City before Depok city: Class II • Depok City : Class II • South Jakarta before Manggarai: Class II • Urban area in downstream (Jakarta) start in Manggarai : Class III.

(28) AGREEMENT ON WATER POLLUTION CONTROL AND MONITORING 2.Ecosystem and Sector- Authority based river basin management (MoE, MoA, MoF, MoHA, Local Government, etc) 3.Coordination River Monitoring Activity 4.Prioritazing Management Actions based on problem typology in field.

(29) WATER QUALITY MANAGEMENT • Integrated water quality management based on Government Regulation No. 82/2001 on Water Quality Management and Water Pollution Control (Article 9 Section 1) states that water classification of river located in two or more provinces is determined by the President. • Integrated management is based on Master Plan as a guidelines for National Board of Planning, Provincial and Local Board of Planning in arranging action plan. Sumber : KLH.

(30)

(31) Future Plan Pollution sources 1. Domestic waste Programme: 1. Community sanitation (SANIMAS) 2. Solid waste trapping for small channal + 3 R 3. Build septictank communal. 2. Waste water from Cow / Cattle Programme: 1. Biogas instalation 2. Organic fertilizer (solid and liquid).

(32) Future Plan Pollution sources 3. Waste water from Agriculture Programme: 1. Subtitution of anorganic fertilizer and organic fertilizer. 4. Waste from Industries Programme: 1. Waste water instalation 2. Agreement letter to comply the regulation (SUPER KASIH).

(33) Future Plan Pollution sources 5. Land degradation Programme: 1. Agroforestry 2. Sediment trap for small channal. 6. Recharge Area Protection Programme: 1. Small Dam Protection and Maintaining 2. Shallow well recharge to rainwater harvesting.

(34) EVALUATION PROGRAMME. MASTER PLAN FIRST FIVE YEAR SYNCHRONIZATION PROGRAMME. MASTER PLAN SECOND FIVE YEAR. •EVALUATION OF WATER QUALITY TARGET •IMPROVING OF MASTER PLAN. SYNCHRONIZATION PROGRAMME. •EVALUATION OF WATER QUALITY TARGET •IMPROVING MASTER PLAN. MASTER PLAN THIRD FIVE YEAR. ETC. ETC.

(35) Shallow well recharge. bak kontrol sedimen 50 cm. sedimen mengendap di bagian bawah 2-10 m tergantung jenis dan lapisan tanah. pasangan batu kosong dan ijuk.

(36) Pembuatan Instalasi Bio Gas. Instalasi Bio Gas.

(37) Pembuatan Septictank Komunal & WC Komunal. Pembuatan Septictank Comunal dan WCdan Comunal di DAS Ciliwung Pembuatan Septictank Komunal WC Komunal.

(38)

(39)

Referensi

Dokumen terkait

In this article, a novel method for finding EP over data stream both in online and offline mode is proposed using a new windows model called Fibonacci Windows (F-windows or F-

atas goodwill tersebut, maka jumlah perbedaan temporer kena pajak berkaitan pada goodwill berkurang dari Rp10.000 menjadi Rp8.000, dengan menimbulkan penurunan pada nilai liabilitas

Usulan Teknis dinyatakan memenuhi syarat (lulus) apabila mendapat nilai minimal 70 (tujuh puluh), peserta yang dinyatakan lulus akan dilanjutkan pada proses

Penelitian ini adalah penelitian untuk analisis sifat fisis dan mekanis tanah berbutir halus dengan bahan tambah limbah pupuk kimia, dengan menganalisa sifat fisis tanah

Adapun masalah penelitian ini hanya dibatasi pada wujud dan makna referensial pada istilah pendidikan dalam kolom wacana pendidikan surat kabar harian Solopos

Di samping itu karyawan bank syari'ah harus skillful dan professional (fathonah) dan mampu melaksanakan tugas secara team-work di mana informasi merata di seluruh

Berdasarkan hasil penelitian yang diperoleh disimpulkan bahwa sebagian besar siswa SMA “X” Kabupaten Aceh Tenggara, yaitu sebesar 94,9% memiliki intention kuat untuk tidak

mempunyai pengalaman yang sukses dalam penerapan ketrampilan dan pengetahuan pada operasi dan proses kerja yang akan dilakukan;.. pendidikan akan efektif apabila sejak