PROGRAM : KEGIATAN :
PEKERJAAN : : PENYEDIAAN JARINGAN AIR MINUM KAWASAN SIAP BANGUN (KASIBA) LOKASI : : KEC. TILONGKABILA - BONE BOLANGO
THN ANG. : 2012
PAGU ANGG. : 1,953,847,100.00 HPS : 1,953,847,100.00
TOTAL HARGA PENAWARAN
TERMASUK PPN 10% (Rp) PERINGKAT
TOTAL HARGA PENAWARAN TERMASUK
PPN 10% (Rp)
PERINGKAT SETELAH KOREKSI
1 3 4 5 6 7
1 CV.SINAR MULIA UTAMA Rp 1,689,825,000.00 1 Rp 1,691,392,000.00 1 86.57 BERUBAH / TETAP
2 CV. MATARAM Rp 1,738,921,000.00 2 Rp 1,739,103,000.00 2 89.01 BERUBAH / TETAP
3 CV. CAHAYA KARTINI Rp 1,772,584,000.00 3 Rp 1,767,995,700.00 3 90.49 BERUBAH / TETAP
4 CV. UTAMA TEKNIK MANDIRI Rp 1,813,344,000.00 4 Rp 1,810,466,000.00 4 92.66 BERUBAH / TETAP 5 CV. BUMI BERINGIN JAYA Rp 1,837,061,000.00 5 Rp 1,837,006,000.00 5 94.02 BERUBAH / TETAP
BONE BOLANGO, 21 SEPTEMBER 2012
POKJA KONSTRUKSI ULP KAB. BONE BOLANGO
1 IRWAN KURNIAWAN, ST 1 ………..
2 RAHMAN HASAN, ST 2 ……….
3 RAHMIATY PAKAJA, S.ST 3 ………..
[image:1.842.12.780.97.328.2]2
TABEL 1 KOREKSI ARITMATIK
NO NAMA PERUSAHAAN
PENAWARAN
% THD HPS