PROGRAM : PEM BANGUNAN JALAN DAN JEM BATAN
KEGIATAN : PEM BUKAAN BADAN JALAN DUSUN SIBADAR M ENUJU DUSUN SIHALOM BUK DESA M ARSONJA KEC. SEI KANAN KAB. LABUHANBATU SELATAN
LOKASI : KECAM ATAN SEI KANAN
TAHUN ANGGARAN : 2012
NO ANALISA SATUAN VOLUM E HARGA SATUAN
(Rp.)
1 Pengukuran Kem bali - Ls 1,00
2 Sew a Direksi Keet / Gudang Bahan - Ls 1,00
3 Papan Pengenal Proyek - Unit 1,00
4 M obilisasi dan Dem obilisasi Alat Berat - Ls 1,00
5 Fot o Dokum ent asi - Ls 1,00
II PEK. SUBGRADE
1 M em ot ong Bahu Jalan Tinggi unt uk pelebaran K - 211 are 394,35
2 Penim bunan Badan Jalan K - 311 M 3 1435,20
3 Penyiapan Tanah Dasar K - 342 are 1189,65
III PEK. KONSTRUKSI JALAN SEPJ. 11550 M '
1 Lapis Pondasi Baw ah (LPB) Klas C K - 512 M 3 10.654,88
IV Pekerjaan Drainase Sepj. 21930 M '
1 Galian t anah K - 224 M 3 5482,50
Parit Pasangan Sepanjang 2050 M '
1 Galian t anah K - 224 M 3 1234,10
2 Pas. Bat u Padas K - 705 M 3 721,60
3 Plest eran G.50h M 2 3731,00
V PEK. BANGUNAN PELENGKAP A. Pek. Duiker 1 x 1 x 9 M (20 Buah)
1 Galian Tanah K - 224 M 3 626,4
2 Konst ruksi Pasangan Bat u K- 705 M 3 276,66
3 M em ot ong, M em bengkok dan M em asang Tulangan Besi Bet K - 715 Kg 8711,056
4 Acuan unt uk Bet on St rukt ur K - 710 M 2 264,8
5 Bet on St rukt ur Klas K225 K - 722 M 3 57,6
6 Plest eran G.50h M 2 604,8
B. PENGGANTIAN JEM BATAN LANTAI KAYU M ENJADI JEM BATAN BETON 5 x 8,8 M B.1 PONDASI JEM BATAN
1 Galian t anah unt uk konst ruksi K - 224 116,80 M 3
2 Acuan unt uk bet on st rukt ur K - 710 167,32 M 2
3 M em ot ong, m em bengkok, m em asang t ulangan besi K - 715 5259,28 Kg
4 Bet on st rukt ur klas K225 K - 725 48,44 M 3
5 Tem bok Arah Jem bat an K - 705 1,80 M 3
6 Besi L.50.50.5 unt uk expansi joint - 65,98 Kg
7 Plest eran unt uk t em bok arah G.50h 22,32 M 2
8 Tim bunan Oprit jem bat an K - 225 37,00 M 3
B.2. PEK. BANGUNAN ATAS
1 Acuan unt uk bet on st rukt ur K - 710 108,27 M 2
2 M em ot ong, m em bengkok, m em asang t ulangan besi K - 715 2390,05 Kg
3 Bet on Klas K125 unt uk Trot oar K - 720 7,46 M 3
4 Bet on st rukt ur klas 225 K - 722 17,54 M 3
SUB TOTAL PEKERJAAN BANGUNAN PELENGKAP A
SUB TOTAL PEKERJAAN BANGUNAN PELENGKAP B.1
DAFTAR KUANTITAS DAN HARGA
URAIAN PEKERJAAN
SUB TOTAL PEKERJAAN PENDAHULUAN
SUB TOTAL PEKERJAAN SUBGRADE
SUB TOTAL PEKERJAAN KONSTRUKSI JALAN
SUB TOTAL PEKERJAAN DRAINASE
4 Bet on st rukt ur klas 225 K - 722 17,54 M 3
5 Elast rom ic rubber - 4,00 Bh
6 Besi pipa Æ 3" unt uk sandaran jem bat an Ls 309,41 Kg
7 Besi L.50.50.5 unt uk t rot oar jem bat an - 65,98 Kg
8 M engecat pipa sandaran dan t em bok arah - 5,55 M 2
VI PEK. DINDING PENAHAN TANAH PEK. TEM BOK PAS. BATU KIRI / KANAN PADA STA. 35 - STA. 36 SEP. 20 M X 2 = 40 M
NO ANALISA SATUAN VOLUM E HARGA SATUAN (Rp.)
BIAYA (Rp.)
JUM LAH BIAYA (Rp.) URAIAN PEKERJAAN
1 Galian Tanah Konst ruksi K - 224
28,00
M 3NO ANALISA SATUAN VOLUM E HARGA SATUAN (Rp.)
BIAYA (Rp.)
JUM LAH BIAYA (Rp.) URAIAN PEKERJAAN
PEK. TEM BOK PAS. BATU KIRI
PADA STA. 3+250 - STA. 3+330 SEP. 80 M = 80 M
1 Galian Tanah Konst ruksi K - 224
56,00
M 32 Konst ruksi Pasangan Bat u K - 705
132,00
M 3
TOTAL
PEM BULATAN SUB TOTAL PEKERJAAN DINDING PENAHAN TANAH
...,...2012 Dibuat Oleh :
(Nam a Jelas) Tenaga Tenis M enget ahui,
PT/ CV/ Fa/ ...