: IBRD Loan No. 8213-ID (PNPM IV)
: PT Ganes Engineering Consultant
Paket Pekerjaan
: Oversight Service Provider Regional Management Paket 5
(Central Java & DI Yogyakarta)
Amandemen Kontrak
: Amandemennt No. 02 - Tanggal 27 Mei 2015
Periode Kontrak
: 09 Oktober2014 sd 31Desember 2015
NO
AMENDMENT CONTRACT
NO. 2
I
REMUNERATION ( SUB TOTAL I )
9.933.591.250
1.1
PROFESSIONAL STAFF
7.450.250.000
1.2
SUPPORTING STAFF
1.790.300.000
Fee [...% x [ 1.1+1.2 ]]
II DIRECT REIMBURSABLE COST ( SUB TOTAL II )
7.028.170.685
2.1
DUTY TRAVEL EXPENSES CENTRAL JAVA
2.144.646.500
Transport
1.650.846.500
Accomodation
272.000.000
OSA (Fixed)
221.800.000
2.2
DUTY TRAVEL EXPENSES DI. YOGYAKARTA
357.600.000
Transport
289.200.000
Accomodation
24.000.000
OSA (Fixed)
44.400.000
2.3
OFFICE OPERATIONAL EXPENSES (a+b+c)
903.375.000
2.3.1 Office Running Cost
531.000.000
2.3.2 Office Supply and Consumable
184.875.000
2.3.3 Communication Cost
165.000.000
2.3.4 Internet Cost
22.500.000
2.4
OFFICE EQUIPMENT EXPENSES
139.149.325
a Desktop Computer
50.000.000
b Laptop
55.000.000
c Printer Laser Jet
4.000.000
d Printer Color A3
6.000.000
e Digital Camera
2.500.000
f GPS Tools
7.000.000
g LCD Projector
9.000.000
h Scanner
2.000.000
DESCRIPTION
Sumber Pendanaan
Nama Konsultan
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT-MANDIRI PERKOTAAN (PNPM-MP)
PROYEK PEMBINAAN KAWASAN PERMUKIMAN PERKOTAAN (P2KP)
DIREKTORAT JENDERAL CIPTA KARYA
i Equipment Maintenance (Including Existing Equipment)
3.649.325
2.5
RENTAL EXPENSES (a+b+c)
3.336.675.000
Office Space
198.675.000
Vehicle
3.060.000.000
Motorcycle
78.000.000
2.6
REPORTING EXPENCES (a+b+c)
18.000.000
2.6.1 Reguler Report
12.750.000
2.6.2 Special Report
5.250.000
Fee [...% x [ 2.1 + 2.2 + 2.3.1 + 2.3.2]
Fee [...% x [ 2.1 + 2.2 + 2.3.1 + 2.3.2]
III TOTAL TRAINING ACTIVITY EXPENSES [ 3.1 + Fee ]
3.399.711.075
3.1
Training Activity
3.284.745.000
Fee [ ...% x [ 3.1 ]]
IV TOTAL SOCIALIZATION ACTIVITY EXPENSES [ 4.1 + 4.2 + Fee ]
1.869.504.000
4.1
Socilization Activity in Provincial Levels
164.000.000
4.2
Socilization Activity in City/Regency Levels
1.633.600.000
Fee [[ ...% x [ 4.1 + 4.2 ]]
OVERSIGHT SERVICE PROVIDER [ OSP ] - 5
NATIONAL PROGRAM FOR COMMUNITY EMPOWERNMENT IN URBAN AREAS
I. BREAKDOWN OF REMUNERATION
Volume Unit Price (IDR) Total Amount (IDR) 568,00 7.450.250.000 1.1.1 OSP LEVEL 24,00 499.000.000
1 Program Director OC Drs. Anton Lami Suhadi, M.Si 14,68 19.000.000 279.000.000 2 Assisten OC Drs. Joko Warsono 14,67 7.500.000 110.000.000 3 Sub Spec. Legal & CHU Ardisyah Alam, SH 14,67 7.500.000 110.000.000
B PROVINCE CENTRAL JAVA 424,00 5.160.500.000
1 Provincial Team Leader Ir. Endar Gunarto 14,67 16.500.000 242.000.000 2 Monev Specialist Drs. Elisanta Soetarjono 14,68 11.000.000 161.500.000 3 a. Sub Spec. Monev PNPM I Wayan Ardika Utama, S.Ag, SE 5,00 7.500.000 37.500.000 Ir. Irwan Muchtar 9,67 7.500.000 72.500.000 4 b. Sub Spec. Monev Advance Rudi Santoso, SE, M.Si 14,67 7.500.000 110.000.000 5 MIS Specialist Sartika Darma Wijaya, S.Kom 14,70 9.250.000 136.000.000 6 a. Sub Spec. MIS for PNPM Erwin Effendi, ST - 7.500.000 - Eriyanti, S.Kom 11,00 7.500.000 82.500.000 7 Socialization Specialist Drs. Harry Faddilah - 9.250.000 - Drs. Kunawi, M.Si 10,00 9.250.000 92.500.000 8 Training Specialist Muhammad Yasak, S.Pd 14,70 9.250.000 136.000.000 9 a. Sub Spec.Training/CB for PNPM Drs. Kunawi, M.Si 5,00 7.500.000 37.500.000 I Wayan Ardika Utama, S.Ag, SE 9,67 7.500.000 72.500.000 10 b. Sub Spec.SME’s I Made Sarka, S.Sos 14,67 7.500.000 110.000.000 11 Infrastructure Specialist Basuki Budi Susetyo, ST 14,70 9.250.000 136.000.000 12 a. Sub Spec. Infras. PNPM & DRM Ikhwanudin, ST.,MT 14,67 7.500.000 110.000.000 13 Micro Fin & Fin.Mgmt Spec. Agus Hariyanto, SE, MM, Akt 14,70 9.250.000 136.000.000 14 a. Sub Spec. Fin.Mgmt for PNPM Suyono,SE, MM 14,67 7.500.000 110.000.000 15 b. Sub Spec. RLF Ahmad Aris Sakhroni, SE 14,67 7.500.000 110.000.000 16 Local Gov & Public Policy Spec Drs. Sudarisman 5,00 9.250.000 46.250.000 Drs. Sarsetyono, M.Pd 9,70 9.250.000 89.750.000 17 Urban Planner Specialist Saji Wahyono, ST 14,70 9.250.000 136.000.000 18 Sub Proff. Financial (29 person) TBN - 5.750.000 - 1. Cilacap Maryati 14,70 5.750.000 84.500.000 2. Banyumas Nurkholis 14,70 5.750.000 84.500.000 3. Banjarnegara & Purbalingga Wiwit Priyanto 14,70 5.750.000 84.500.000 4. Kebumen & Purworejo Adi Ganda Purnama 14,70 5.750.000 84.500.000 5. Kab. Magelang,Kota Magelang, Temanggung Imanuel Maryanto Nugroho 14,70 5.750.000 84.500.000 6. Klaten Niken Wijayanti 14,70 5.750.000 84.500.000 7. Klaten Kholis Mahmudah 14,70 5.750.000 84.500.000 8. Klaten Dwi Riyanti 6,70 5.750.000 38.500.000 9. Boyolali & Salatiga Muh Herlani Qosim 14,70 5.750.000 84.500.000 10. Wonogiri & Karanganyar Sugeng Prayitno 14,70 5.750.000 84.500.000 11. Sragen & Surakarta Haryani Sawitri 14,70 5.750.000 84.500.000 12. Sukoharjo Puji Hastuti 14,70 5.750.000 84.500.000 13. Blora & Grobogan Heru Susalit 14,70 5.750.000 84.500.000 14. Rembang Eko Suwarto 14,70 5.750.000 84.500.000 15. Pati Ma'ruf 14,70 5.750.000 84.500.000 16. Pati Ika Juliana 14,70 5.750.000 84.500.000 17. Jepara Kuntarsih 14,70 5.750.000 84.500.000 18. Kudus Noor Haris 14,70 5.750.000 84.500.000 19. Demak & Kab Semarang RM Darmawan 14,70 5.750.000 84.500.000 20. Batang & Kota Pekalongan Nani Kiswati Ekasaputri 14,70 5.750.000 84.500.000 21. Kota Semarang Sendy Yolanda H M 14,70 5.750.000 84.500.000 22. Kota Semarang Ruwaidah 14,70 5.750.000 84.500.000 23. Kendal Lis Setijaningsih Veronica 14,70 5.750.000 84.500.000 24. Pemalang Sundari 14,70 5.750.000 84.500.000 25. Kab. Tegal Warsida 14,70 5.750.000 84.500.000
NO. POSITION NAME
AMENDMENT CONTRACT NO.2
Volume
(IDR) (IDR)
26. Kab. Tegal Agus Wibowo 14,70 5.750.000 84.500.000 27. Brebes & Kota Tegal Agus Salim 14,70 5.750.000 84.500.000 27. Kab. Pekalongan Agus Sumbodo 14,70 5.750.000 84.500.000 29. Kab Pekalongan Firdaus Nurul Tataqun 14,70 5.750.000 84.500.000
19 Sub Proff. Administration (7 person) TBN - 5.750.000 - 1. Sub Proff. Administration 1 Wiwin Sanjaya, S.Sos 14,70 5.750.000 84.500.000 2. Sub Proff. Administration 2 Edy Rudyanto,SE 14,70 5.750.000 84.500.000 3. Sub Proff. Administration 3 Bangun Wibowo,SE 14,70 5.750.000 84.500.000 4. Sub Proff. Administration 4 Akbar Noor Dewanto,SE 14,70 5.750.000 84.500.000 5. Sub Proff. Administration 5 Indera Risdyakusuma,SE 14,70 5.750.000 84.500.000 6. Sub Proff. Administration 6 Agus Budi Setiawan,SE 14,70 5.750.000 84.500.000 7. Sub Proff. Administration 7 Sutrisno,SE 14,70 5.750.000 84.500.000
PROVINCE DI YOGYAKARTA 120,00 1.790.750.000
1 Provincial Team Leader Drs. Nanang Priyana 14,68 14.750.000 216.500.000 2 Monev Specialist Ir. Sri Juwarni 14,68 11.000.000 161.500.000 3 MIS Specialist Tri Datha Younathan, S.Kom 14,70 9.250.000 136.000.000 4 Socialization Specialist Handayani Candraningsih, SP 14,70 9.250.000 136.000.000 5 Training Specialist Aris Haryanto, S.Pd 14,70 9.250.000 136.000.000 6 a. Sub Spec.SME’s Raharja Mulya Atmaja, A.Md 14,67 7.500.000 110.000.000 7 Infrastructure Specialist Ir. Nurokhman, MT 14,70 9.250.000 136.000.000 8 Micro Fin & Fin.Mgmt Spec. Agus Subiyantoro, SE, M.Si 1,00 9.250.000 9.250.000 Dwi Hery Agustriyanto, SE 8,70 9.250.000 80.500.000 9 a. Sub Spec. RLF Dwi Hery Agustriyanto, SE 6,00 7.500.000 45.000.000 Dwi Riyanti 7,67 7.500.000 57.500.000 10 Local Gov & Public Policy Spec Setyadi, SE.,M.Si - 9.250.000 - Drs. Sudarisman 10,00 9.250.000 92.500.000 11 Urban Planner Specialist Budhi Kristiyanto Widodo, ST 14,70 9.250.000 136.000.000 12 Sub Proff. Financial (3 person) TBN - 5.750.000 - 1. Sub Proff. Finacial Kota Yogyakarta Dwi Retno Sriharjanti 14,70 5.750.000 84.500.000 2. Sub Proff. Finacial Kab. Bantul Wahyu Puguh Hartono 14,70 5.750.000 84.500.000 3. Sub Proff. Finacial Kab. Sleman Basuki Rakhmad 14,70 5.750.000 84.500.000 13 Sub Proff. Administration (1 person) TBN - 5.750.000 - 1. Sub Proff. Administration (1 person) Alief Rusdiana N, SE, MM 14,70 5.750.000 84.500.000 -1.153,00
1.790.300.000
PROVINCE CENTRAL JAVA 72,00 298.700.000
1 Office Manager Pujiono Santoso 14,71 4.250.000 62.500.000 2 Assisten Office Manager Fian Arie Madhona 14,77 3.250.000 48.000.000 3 Secretary M. Arifin 6,00 2.750.000 16.500.000 Adinda Ayuningtiyas 8,73 2.750.000 24.000.000 4 Computer Operator (3 person) TBN - 2.000.000 - a. Computer Operator 1 Fathur Rohman 14,75 2.000.000 29.500.000 b. Computer Operator 2 Syaifur Rohman 14,50 2.000.000 29.000.000 c. Computer Operator 3 Miftahul Kharis 14,75 2.000.000 29.500.000 5 Office Boy (1 person) Kasturi 14,74 1.350.000 19.900.000 6 Security (2 person) TBN - 1.350.000 - a. Security 1 Suwardjianto 14,74 1.350.000 19.900.000 b. Security 2 Basuki 14,74 1.350.000 19.900.000
PROVINCE DI YOGYAKARTA 48,00 207.200.000
1 Ass Office Manager Vadeani Perwitasari 14,77 3.250.000 48.000.000 2 Secretary Herni Budiarti Santoso 14,73 2.750.000 40.500.000 3 Computer Operator (2 person) TBN - 2.000.000 - a. Computer Operator 1 Indra Kurniawan 14,75 2.000.000 29.500.000 b. Computer Operator 2 Widiarto Adi 14,75 2.000.000 29.500.000 4 Office Boy (1 person) Tri Wahyudi 14,74 1.350.000 19.900.000 5 Security (2 person) TBN - 1.350.000 - I. 2 SUPPORTING STAFF
Volume Unit Price (IDR)
Total Amount (IDR)
NO. POSITION NAME
AMENDMENT CONTRACT NO.2
a. Security 1 Rudi Wasdianto 14,74 1.350.000 19.900.000 b. Security 2 Ali Mamasta 4,00 1.350.000 5.400.000 Agus Ristanto 10,74 1.350.000 14.500.000
1.033,00
1.284.400.000 1 Computer Operator TBN - 2.000.000 -
PROVINCE CENTRAL JAVA
a. Korkot Purbalingga (44 kelurahan) Suwatmi 14,75 2.000.000 29.500.000 b. Korkot Magelang (27 kelurahan) Eko Prasetyo 14,75 2.000.000 29.500.000 c. Korkot Blora (45 kelurahan) Yuaningsih 14,75 2.000.000 29.500.000 d. Korkot Temanggung (41 kelurahan) Ary Prihatiningsih 14,75 2.000.000 29.500.000 e. Korkot Batang (39 kelurahan) Eni Sofiati,S.Kom 14,75 2.000.000 29.500.000 f. Korkot Brebes (38 kelurahan) Utin Agustina 14,75 2.000.000 29.500.000 g. Korkot Kota Pekalongan (47 kelurahan) Iis Sugiarti 14,75 2.000.000 29.500.000 h. Korkot Banyumas (85 kelurahan) Susanti 14,75 2.000.000 29.500.000 i. Korkot Kebumen (54 kelurahan) Dwi Fitriana 14,75 2.000.000 29.500.000 j. Korkot Boyolali (61 kelurahan) Tri Puji Wahyudi 14,75 2.000.000 29.500.000 k. Korkot Sukoharjo (83 kelurahan) Yenie Rahmawati 14,75 2.000.000 29.500.000 l. Korkot Karanganyar (51 kelurahan) Sumini 14,75 2.000.000 29.500.000 m. Korkot Rembang (54 kelurahan) Muh Mohlisin 14,75 2.000.000 29.500.000 n. Korkot Kudus (86 kelurahan) Oni Firmansyah 14,75 2.000.000 29.500.000 o. Korkot Jepara (86 kelurahan) Susilo Ningsih 14,75 2.000.000 29.500.000 p. Korkot Kendal (57 kelurahan) Wardatun Nikmah 14,75 2.000.000 29.500.000 q. Korkot Pemalang (79 kelurahan) Dewi Setiani 14,75 2.000.000 29.500.000 r. Korkot Kota Surakarta (51 kelurahan) Sabar Purnomo 14,75 2.000.000 29.500.000 s. Korkot Pati (101 kelurahan) Santosa 14,75 2.000.000 29.500.000 t. Korkot Pekalongan (119 kelurahan) Iin Yulianti 14,75 2.000.000 29.500.000 u. Korkot Tegal (116 kelurahan) Antonius Dani Prayatomo 14,75 2.000.000 29.500.000 v. Korkot Kota Semarang (177 kelurahan) Rahmawati Dwi Kustanti 14,75 2.000.000 29.500.000 w. Korkot Klaten Siti Yuliana 14,75 2.000.000 29.500.000
PROVINCE DI YOGYAKARTA
a. Korkot Kota Yogyakarta Aris Sukoco 14,75 2.000.000 29.500.000 b. Korkot Sleman Ernawati 14,75 2.000.000 29.500.000 c. Korkot Bantul Dian Alyani Nurainina 14,75 2.000.000 29.500.000
2 Office Boy TBN - 1.350.000 - PROVINCE CENTRAL JAVA
a. Korkot Purbalingga (44 kelurahan) Syarif Chamdani 14,74 1.350.000 19.900.000 b. Korkot Magelang (27 kelurahan) Priharyatno 14,74 1.350.000 19.900.000 c. Korkot Blora (45 kelurahan) Dina Miranti 14,74 1.350.000 19.900.000 d. Korkot Temanggung (41 kelurahan) Mukhotib Muhammad 14,74 1.350.000 19.900.000 e. Korkot Batang (39 kelurahan) Rokhayah 14,74 1.350.000 19.900.000 f. Korkot Brebes (38 kelurahan) Lukni Maulana 14,74 1.350.000 19.900.000 g. Korkot Kota Pekalongan (47 kelurahan) Mochammad Yasir 14,74 1.350.000 19.900.000 h. Korkot Banyumas (85 kelurahan) Catur Setiawan 14,74 1.350.000 19.900.000 i. Korkot Kebumen (54 kelurahan) Dodi Prihatin 14,74 1.350.000 19.900.000 j. Korkot Boyolali (61 kelurahan) Suparmi 14,74 1.350.000 19.900.000 k. Korkot Sukoharjo (83 kelurahan) Dwi Erlita Meindarwati 14,74 1.350.000 19.900.000 l. Korkot Karanganyar (51 kelurahan) Suparno 14,74 1.350.000 19.900.000 m. Korkot Rembang (54 kelurahan) Putri Nurjanah 14,74 1.350.000 19.900.000 n. Korkot Kudus (86 kelurahan) Alfa Fitria Safoarifa 14,74 1.350.000 19.900.000 o. Korkot Jepara (86 kelurahan) Andreas Sony Sanjaya 14,74 1.350.000 19.900.000 p. Korkot Kendal (57 kelurahan) Umi Khoirul ummah 14,74 1.350.000 19.900.000 q. Korkot Pemalang (79 kelurahan) Arif Muzaki 14,74 1.350.000 19.900.000 r. Korkot Kota Surakarta (51 kelurahan) Afifah Khoiri Ripih Widayanti 14,74 1.350.000 19.900.000 s. Korkot Pati (101 kelurahan) Lusi Ana 14,74 1.350.000 19.900.000 t. Korkot Pekalongan (119 kelurahan) Guntur Dwi Prasetyo 14,74 1.350.000 19.900.000 u. Korkot Tegal (116 kelurahan) Nurkholis 14,74 1.350.000 19.900.000 v. Korkot Kota Semarang (177 kelurahan) Pungkas Dimas Sasongko 14,74 1.350.000 19.900.000 CITY COORDINATORS OFFICE (29 Korkot)
Volume
(IDR) (IDR)
w. Korkot Klaten A Bambang Heru Sasomo 14,74 1.350.000 19.900.000
PROVINCE DI YOGYAKARTA
a. Korkot Kota Yogyakarta Slamet Riyanto 14,74 1.350.000 19.900.000 b. Korkot Sleman Bagus Tri Joko 14,74 1.350.000 19.900.000 c. Korkot Bantul Wachid Nur'Aini 14,74 1.350.000 19.900.000
9.240.550.000 TOTAL REMUNERATION
OVERSIGHT SERVICE PROVIDER [ OSP ] - 5
NATIONAL PROGRAM FOR COMMUNITY EMPOWERNMENT IN URBAN AREAS
II. DIRECT REEIMBURSABLE COST
2.1. DUTY TRAVEL EXPENSES FOR CENTRAL JAVA PROVINCE
Vol Unit Price (IDR)
Total Amount (IDR) 2.1.1 IN PROVINCE
2.1.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x Number of Kelurahan)
45.800.000
a To Cilacap & Banyumas (100 kel x 3% = 4 kel)
Transport fixed Rate 5 300.000 1.500.000 Acomodation Ceiling Rate 8 150.000 1.200.000 OSA fixed Rate 13 50.000 650.000 b To Purbalingga & Banjarnegara (57 kel x 3% = 3 kel)
Transport fixed Rate 5 200.000 1.000.000 Acomodation Ceiling Rate 8 150.000 1.200.000 OSA fixed Rate 13 50.000 650.000 c To Kebumen, Purworejo dan Wonosobo (101 kel x 3% = 4 kel)
Transport fixed Rate 5 200.000 1.000.000 Acomodation Ceiling Rate 8 150.000 1.200.000 OSA fixed Rate 13 50.000 650.000 d To Magelang, Temanggung & Kota Magelang (85 kel x 3% = 4 kel)
Transport fixed Rate 5 200.000 1.000.000 Acomodation Ceiling Rate 8 150.000 1.200.000 OSA fixed Rate 13 50.000 650.000 e To Boyolali, Klaten & Sukoharjo (356 kel x 3% = 12 kel)
Transport fixed Rate 7 200.000 1.400.000 Acomodation Ceiling Rate 14 150.000 2.100.000 OSA fixed Rate 21 50.000 1.050.000 f To Wonogiri & Karanganyar (77 kel x 3% = 3 kel)
Transport fixed Rate 5 200.000 1.000.000 Acomodation Ceiling Rate 8 150.000 1.200.000 OSA fixed Rate 13 50.000 650.000 g To Kota Surakarta & Sragen (67 kel x 3% = 3 kel)
Transport fixed Rate 5 200.000 1.000.000 Acomodation Ceiling Rate 8 150.000 1.200.000 OSA fixed Rate 13 50.000 650.000 h To Grobogan & Blora (62 kel x 3% = 3 kel)
Transport fixed Rate 5 300.000 1.500.000 Acomodation Ceiling Rate 8 150.000 1.200.000 OSA fixed Rate 13 50.000 650.000 i Transport Rembang, Pati & Jepara (241 kel x 3% = 9 kel)
Transport fixed Rate 7 200.000 1.400.000 Acomodation Ceiling Rate 14 150.000 2.100.000 OSA fixed Rate 21 50.000 1.050.000 j To Kudus & Demak (105 kel x 3% = 4 kel)
Transport fixed Rate 5 100.000 500.000 Acomodation Ceiling Rate 8 150.000 1.200.000 OSA fixed Rate - 200.000
-13
50.000 650.000
NO. DESCRIPTION REMARK
Vol
(IDR) (IDR) k To Semarang & Salatiga (53 kel x 3% = 2 kel)
Transport fixed Rate 5 100.000 500.000 Acomodation Ceiling Rate 8 150.000 1.200.000 OSA fixed Rate - 200.000
-13
50.000 650.000 l To Batang, Pekalongan, Pemalang, Kota Pekalongan (284 kel x 3% = 11 kel)
Transport fixed Rate 7 200.000 1.400.000 Acomodation Ceiling Rate 14 150.000 2.100.000 OSA fixed Rate - 200.000
-21
50.000 1.050.000 m To Tegal, Brebes, Kota Tegal (181 kel x 3% = 7 kel)
Transport fixed Rate 7 200.000 1.400.000 Acomodation Ceiling Rate 10 150.000 1.500.000 OSA fixed Rate - 200.000
-17
50.000 850.000 n To Kendal, Kota Semarang (234 kel x 3% = 8 kel)
Transport fixed Rate 5 100.000 500.000 Acomodation Ceiling Rate 10 150.000 1.500.000 OSA fixed Rate - 200.000
-15
50.000 750.000
2.1.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM
534.112.500
A. For City Coordinator and Assistance City Coordinator
(2003 Kel x 50%) x 3 fixed Rate 1.503 50.000 75.150.000 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
(2003-1-20+22+1 Kel x 50%) x 3 1.504 50.000 75.187.500 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city
(2003 Kel - 196 Kel luar kota) x 50%) x 7 fixed Rate 3.162 50.000 158.112.500 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
(2003-1-20+22+1 Kel x 50%) x 7 3.509 50.000 175.437.500 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For Ass. City Coordinator Infrastructure and FM out of the town 1 Banyumas to Cilacap
Transport fixed Rate 60 50.000 2.975.000 2 Purbalingga to Banjarnegara
Transport fixed Rate 53 50.000 2.625.000 3 Temanggung To Wonosobo
Transport fixed Rate 77 50.000 3.850.000 4 Magelang to Kota Magelang
Transport fixed Rate 67 50.000 3.325.000 5 Karanganyar to Sragen
Transport fixed Rate 63 50.000 3.150.000 6 Kudus to Demak
Vol Unit Price (IDR)
Total Amount (IDR)
NO. DESCRIPTION REMARK
AMENDMENT CONTRACT NO.2
Transport fixed Rate 74 50.000 3.675.000 7 Kota Semarang to Semarang
Transport fixed Rate 112 50.000 5.600.000 8 Boyolali to Kota Salatiga
Transport fixed Rate 88 50.000 4.375.000 9 Sukoharjo to Wonogiri
Transport fixed Rate 98 50.000 4.900.000 10 Blora to Grobogan
Transport fixed Rate 105 50.000 5.250.000 11 Kebumen to Purworejo
Transport fixed Rate 109 50.000 5.425.000 12 Brebes to Kota Tegal
Transport fixed Rate 102 50.000 5.075.000
2.1.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL 8.800.000
1 Cilacap to Banyumas
Transport fixed Rate - 50.000 -Banyumas to Cilacap
Transport 16 50.000 800.000
2 Purbalingga to Banjarnegara
Transport fixed Rate 16 50.000 800.000 3 Temanggung To Wonosobo
Transport fixed Rate 16 50.000 800.000 4 Magelang to Kota Magelang
Transport fixed Rate 16 50.000 800.000 5 Karanganyar to Sragen
Transport fixed Rate 16 50.000 800.000 6 Kudus to Demak
Transport fixed Rate 16 50.000 800.000 7 Semarang to Kota Semarang
Transport fixed Rate 16 50.000 800.000 Kota Semarang to Kab. Semarang
Transport 16 50.000 800.000
8 Boyolali to Kota Salatiga
Transport fixed Rate 16 50.000 800.000 9 Wonogiri to Sukoharjo
Transport fixed Rate 16 50.000 800.000 Sukoharjo to Wonogiri
Transport
Vol
(IDR) (IDR) Transport fixed Rate 16 50.000 800.000 Blora to Grobogan
Transport 16 50.000 800.000
11 Brebes to Kota Tegal
Transport 16 50.000 800.000
12 Kebumen to Purworejo
Transport 16 50.000 800.000
2.1.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDINATION MEETING
399.300.000
a From Cilacap, Banyumas To Semarang
Transport fixed Rate 43 300.000 12.900.000 Acomodation Ceiling Rate 43 200.000 8.600.000 OSA fixed Rate 86 50.000 4.300.000 b From Purbalingga, Banjarnegara To Semarang
Transport fixed Rate 40 200.000 8.000.000 Acomodation Ceiling Rate 40 200.000 8.000.000 OSA fixed Rate 80 50.000 4.000.000 c From Kebumen, Purworejo & Wonosobo To Semarang
Transport fixed Rate 46 200.000 9.200.000 Acomodation Ceiling Rate 46 200.000 9.200.000 OSA fixed Rate 92 50.000 4.600.000 d From Kota Magelang, Magelang & Temanggung To Semarang
Transport fixed Rate 58 200.000 11.600.000 Acomodation Ceiling Rate 58 200.000 11.600.000 OSA fixed Rate 116 50.000 5.800.000 e From Boyolali, Klaten & Sukoharjo To Semarang
Transport fixed Rate 108 200.000 21.600.000 Acomodation Ceiling Rate 108 200.000 21.600.000 OSA fixed Rate 170 50.000 8.500.000 f From Wonogiri, Karanganyar To Semarang
Transport fixed Rate 37 200.000 7.400.000 Acomodation Ceiling Rate 37 200.000 7.400.000 OSA fixed Rate 74 50.000 3.700.000 g From Kota Surakarta & Sragen To Semarang
Transport fixed Rate 37 200.000 7.400.000 Acomodation Ceiling Rate 37 200.000 7.400.000 OSA fixed Rate 74 50.000 3.700.000 h From Grobogan & Blora To Semarang
Transport fixed Rate 40 300.000 12.000.000 Acomodation Ceiling Rate 40 200.000 8.000.000 OSA fixed Rate 80 50.000 4.000.000 i From Rembang, Pati & Jepara To Semarang
Transport fixed Rate 96 200.000 19.200.000 Acomodation Ceiling Rate 96 200.000 19.200.000 OSA fixed Rate 192 50.000 9.600.000
Vol Unit Price (IDR)
Total Amount (IDR)
NO. DESCRIPTION REMARK
AMENDMENT CONTRACT NO.2
j From Kudus, Demak To Semarang
Transport fixed Rate 46 100.000 4.600.000 Acomodation Ceiling Rate 46 200.000 9.200.000 OSA fixed Rate 92 50.000 4.600.000 k From Semarang, Kota Salatiga To Semarang
Transport fixed Rate 25 100.000 2.500.000 Acomodation Ceiling Rate 25 200.000 5.000.000 OSA fixed Rate 50 50.000 2.500.000 l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Semarang
Transport fixed Rate 116 200.000 23.200.000 Acomodation Ceiling Rate 116 200.000 23.200.000 OSA fixed Rate 232 50.000 11.600.000 m From Tegal, Kota Tegal & Brebes To Semarang
Transport fixed Rate 68 300.000 20.400.000 Acomodation Ceiling Rate 68 200.000 13.600.000 OSA fixed Rate 136 50.000 6.800.000 n From Kendal To Semarang
Transport fixed Rate 34 100.000 3.400.000 Acomodation Ceiling Rate 34 200.000 6.800.000 OSA fixed Rate 68 50.000 3.400.000
2.1.1.5 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO SEMARANG
455.300.000
For Training
Inland Transport for Korkot&Askot (35 Kota/Kab) on OSP Consolidation a From Cilacap, Banyumas To Semarang
Inland transport fixed Rate 39 300.000 11.700.000 b From Purbalingga, Banjarnegara To Semarang
Transport fixed Rate 27 200.000 5.400.000 c From Kebumen, Purworejo & Wonosobo To Semarang
Transport fixed Rate 39 200.000 7.800.000 d From Kota Magelang, Magelang & Temanggung To Semarang
Transport fixed Rate 46 200.000 9.200.000 e From Boyolali, Klaten & Sukoharjo To Semarang
Transport fixed Rate 85 200.000 17.000.000 f From Wonogiri, Karanganyar To Semarang
Transport fixed Rate 24 200.000 4.800.000 g From Kota Surakarta & Sragen To Semarang
Transport fixed Rate 32 200.000 6.400.000 h From Grobogan & Blora To Semarang
Transport fixed Rate 54 300.000 16.200.000 i From Rembang, Pati & Jepara To Semarang
Transport fixed Rate 84 200.000 16.800.000 j From Kudus, Demak To Semarang
Vol
(IDR) (IDR) k From Semarang, Kota Salatiga To Semarang
Transport fixed Rate 16 100.000 1.600.000 l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Semarang
Transport fixed Rate 91 200.000 18.200.000 m From Tegal,, Kota Tegal & Brebes To Semarang
Transport fixed Rate 75 300.000 22.500.000 n From Kendal To Semarang
Transport fixed Rate 21 100.000 2.100.000 Inland Transport for SF, FT, FE, FS (35 Kota/Kab)
a From Cilacap, Banyumas To Semarang
Inland transport fixed Rate 81 300.000 24.300.000 b From Purbalingga, Banjarnegara To Semarang
Transport fixed Rate 40 200.000 8.000.000 c From Kebumen, Purworejo & Wonosobo To Semarang
Transport fixed Rate 74 200.000 14.800.000 d From Kota Magelang, Magelang & Temanggung To Semarang
Transport fixed Rate 61 200.000 12.200.000 e From Boyolali, Klaten & Sukoharjo To Semarang
Transport fixed Rate 219 200.000 43.800.000 f From Wonogiri, Karanganyar To Semarang
Transport fixed Rate 53 200.000 10.600.000 g From Kota Surakarta & Sragen To Semarang
Transport fixed Rate 50 200.000 10.000.000 h From Grobogan & Blora To Semarang
Transport fixed Rate 73 300.000 21.900.000 i From Rembang, Pati & Jepara To Semarang
Transport fixed Rate 170 200.000 34.000.000 j From Kudus, Demak To Semarang
Transport fixed Rate 85 100.000 8.500.000 k From Semarang, Kota Salatiga To Semarang
Transport fixed Rate 37 100.000 3.700.000 l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Semarang
Transport fixed Rate 196 200.000 39.200.000 m From Tegal,, Kota Tegal & Brebes To Semarang
Transport fixed Rate 149 300.000 44.700.000 n From Kendal To Semarang
Transport fixed Rate 46 100.000 4.600.000
Special Event (by request)
a From Cilacap, Banyumas To Semarang
Vol Unit Price (IDR)
Total Amount (IDR)
NO. DESCRIPTION REMARK
AMENDMENT CONTRACT NO.2
Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000 b From Purbalingga, Banjarnegara To Semarang
Transport fixed Rate 3 200.000 600.000 Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000 c From Kebumen, Purworejo & Wonosobo To Semarang
Transport fixed Rate 3 200.000 600.000 Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000 d From Kota Magelang, Magelang& Temanggung To Semarang
Transport fixed Rate 3 200.000 600.000 Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000 e From Boyolali, Klaten & Sukoharjo To Semarang
Transport fixed Rate 3 200.000 600.000 Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000 f From Wonogiri, Karanganyar To Semarang
Transport fixed Rate 3 200.000 600.000 Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000
- -
-g From Kota Surakarta & Sra-gen To Semaran-g
Transport fixed Rate 3 200.000 600.000 Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000 h From Grobogan & Blora To Semarang
Transport fixed Rate 3 300.000 900.000 Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000 i From Rembang, Pati & Jepara To Semarang
Transport fixed Rate 3 200.000 600.000 Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000 j From Kudus, Demak To Semarang
Transport fixed Rate 3 100.000 300.000 Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000 k From Semarang, Kota Salatiga To Semarang
Transport fixed Rate 3 100.000 300.000 Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000 l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Semarang
Transport fixed Rate 3 200.000 600.000 Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000 m From Tegal, Kota Tegal & Brebes To Semarang
Vol
(IDR) (IDR) Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000 n From Kendal To Semarang
Transport fixed Rate 3 100.000 300.000 Acomodation Ceiling Rate 6 200.000 1.200.000 OSA fixed Rate 9 50.000 450.000
2.1.1.6 FROM OSP Level TO KAB/KOTA & PROVINCE 35.200.000 a From Semarang To Kab/Kota in Central Java Province
Transport fixed Rate 22 100.000 2.200.000 Acomodation Ceiling Rate 44 150.000 6.600.000 OSA fixed Rate 66 100.000 6.600.000 b From Semarang To D.I. Yogyakarta Province
Transport fixed Rate 22 200.000 4.400.000 Acomodation Ceiling Rate 44 200.000 8.800.000 OSA fixed Rate 66 100.000 6.600.000 2.1.2 TO JAKARTA
2.1.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 192.448.000 Air Transport Ceiling Rate 16 2.182.000 34.912.000 In land Travel in Jakarta fixed Rate 16 200.000 3.200.000 OSA fixed Rate 64 100.000 6.400.000 For Koorkot and Faskel lokasi program kumuh ( 48 person )
Air Transport Ceiling Rate 48 2.182.000 104.736.000 In land Travel in Jakarta fixed Rate 48 200.000 9.600.000 OSA fixed Rate 336 100.000 33.600.000
2.1.2.2 FOR EGM TO JAKARTA 119.444.000
Air Transport
1 EGM TA/SubTA Training Ceiling Rate 7 2.182.000 15.274.000 2 EGM TA Sosialisasi Ceiling Rate 3 2.182.000 6.546.000 3 EGM TA/SubTA MK/Sub TA RLF Ceiling Rate 7 2.182.000 15.274.000 4 EGM TA/SubTA INFRA/Sub TA Safeguard Ceiling Rate 5 2.182.000 10.910.000 5 EGM TA/SubTA Monev /Sub TA Legal HCU Ceiling Rate 9 2.182.000 19.638.000 6 EGM TA/SubTA SIM Ceiling Rate 5 2.182.000 10.910.000 7 EGM TA Local Goverment Ceiling Rate 3 2.182.000 6.546.000 8 EGM TA Urban Planner Ceiling Rate 3 2.182.000 6.546.000 In land Transport in Jakarta fixed Rate 42 200.000 8.400.000 OSA fixed Rate 194 100.000 19.400.000
2.1.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 23.274.000 Air Transport Ceiling Rate 7 2.182.000 15.274.000 In land Transport in Jakarta fixed Rate 7 200.000 1.400.000 Hotel Accommodation Ceiling Rate 15 300.000 4.500.000 OSA fixed Rate 21 100.000 2.100.000 2.1.2.4 FOR COORDINATION MEETING CITY COORDINATOR
TO JAKARTA (by request)
265.368.000
Vol Unit Price (IDR)
Total Amount (IDR)
NO. DESCRIPTION REMARK
AMENDMENT CONTRACT NO.2
TOT Pemandu Nasional Korkot/Askorkot Pemandu Nasional
Air Transport Ceiling Rate 35 2.182.000 76.370.000 In land Transport in Jakarta fixed Rate 35 200.000 7.000.000 OSA fixed Rate 280 100.000 28.000.000 TOT Pelatihan Program Lanjutan
Air Transport Ceiling Rate 4 2.182.000 8.728.000 In land Transport in Jakarta fixed Rate 4 200.000 800.000 OSA fixed Rate 16 100.000 1.600.000 FOR COORDINATION MEETING
Air Transport Ceiling Rate 35 2.182.000 76.370.000 In land Transport fixed Rate 35 200.000 7.000.000 Hotel Accommodation Ceiling Rate 140 300.000 42.000.000 OSA fixed Rate 175 100.000 17.500.000
2.1.2.5 TO OTHER LOCATION (By Request) 64.800.000
Air Transport Ceiling Rate 12 3.500.000 42.000.000 In land Transport fixed Rate 12 200.000 2.400.000 Hotel Accommodation Ceiling Rate 48 300.000 14.400.000 OSA fixed Rate 60 100.000 6.000.000
II. DIRECT REEIMBURSABLE COST
2.2. DUTY TRAVEL EXPENSES FOR D.I. YOGYAKARTA PROVINCE
REMARK
REMARK Vol Unit Price (IDR)
Total Amount (IDR) 2.2.1 IN PROVINCE
2.2.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x No. of Kelurahan) 2.050.000 a From Yogyakarta To Kulon Progo (8 kel x 3% = 1 kel)
Transport fixed Rate 5 50.000 250.000
OSA fixed Rate 8 50.000 400.000
b From Yogyakarta To Bantul (50 kel x 3% = 2 kel)
Transport fixed Rate 5 50.000 250.000
OSA fixed Rate 8 50.000 400.000
c From Yogyakarta To Sleman (75 kel x 3% = 3 kel)
Transport fixed Rate 5 50.000 250.000
OSA fixed Rate 10 50.000 500.000
2.2.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM 43.650.000 A. For City Coordinator and Assistance City Coordinator
(197 Kel x 50%) x 3 fixed Rate 225 50.000 11.250.000 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city
(197 Kel - 8 Kel luar kota) x 50%) x 7 fixed Rate 606 50.000 30.300.000 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of the town a from Bantul To Kulon Progo
Transport fixed Rate 42 50.000 2.100.000
2.2.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL 1.250.000
a from Bantul To Kulon Progo
Transport fixed Rate 25 50.000 1.250.000 2.2.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING 3.450.000
a Bantul to Yogyakarta
Transport fixed Rate 23 50.000 1.150.000 b Sleman to Yogyakarta
Transport fixed Rate 23 50.000 1.150.000 c Kulonprogo to Yogyakarta
Transport fixed Rate 23 50.000 1.150.000 2.2.1.5 FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION MEETING AT
OSP
19.200.000
Workshop OC / Coordination Meeting at OC From Yogyakarta to Semarang
Transport fixed Rate 42 200.000 8.400.000 OSA [ Fixed ] Ceiling Rate 84 50.000 4.200.000 Acomodation fixed Rate - - -Acomodation fixed Rate 22 300.000 6.600.000
AMENDMENT CONTRACT NO.2
REMARK
REMARK Vol Unit Price (IDR)
Total Amount (IDR) AMENDMENT CONTRACT NO.2
NO. DESCRIPTION
2.2.1.6 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO YOGYAKARTA 24.400.000 For Training
Transport for Korkot &Askot (3 Kota/Kab) on OSP Consolidation a From Bantul to Yogyakarta
Transport fixed Rate 52 50.000 2.600.000 b From Sleman to Yogyakarta
Transport fixed Rate 72 50.000 3.600.000 c From Kulon Progo to Yogyakarta
Transport fixed Rate 12 50.000 600.000 d From Gunung Kidul to Yogyakarta
Transport fixed Rate - 50.000 -Inland Transport for SF, FK, FE, FS (10 Kota/Kab)
a From Bantul to Yogyakarta
Transport fixed Rate 120 50.000 6.000.000 b From Sleman to Yogyakarta
Transport fixed Rate 160 50.000 8.000.000 c From Kulon Progo to Yogyakarta
Transport fixed Rate 48 50.000 2.400.000 d From Gunung Kidul to Yogyakarta
Transport fixed Rate - 50.000 -Special Event (by request)
1 From Bantul to Yogyakarta
Transport fixed Rate 8 50.000 400.000 2 From Sleman to Yogyakarta
Transport fixed Rate 8 50.000 400.000 3 From Kulon Progo to Yogyakarta
Transport fixed Rate 8 50.000 400.000 4 From Gunung Kidul to Yogyakarta
Transport fixed Rate - 50.000 -2.2.2 TO JAKARTA
2.2.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 45.888.000
Air Transport Ceiling Rate 16 2.268.000 36.288.000 In land Travel in Jakarta fixed Rate 16 200.000 3.200.000
OSA fixed Rate 64 100.000 6.400.000
For Koorkot and Faskel lokasi program kumuh ( 12 person )
Air Transport Ceiling Rate 12 2.268.000 27.216.000 In land Travel in Jakarta fixed Rate 12 200.000 2.400.000 OSA fixed Rate 84 100.000 8.400.000
2.2.2.2 FOR EGM TO JAKARTA 81.504.000
Air Transport
EGM TA/SubTA Training Ceiling Rate 5 2.268.000 11.340.000 EGM TA Sosialisasi Ceiling Rate 3 2.268.000 6.804.000
REMARK Vol
(IDR) (IDR) EGM TA/SubTA MK/Sub TA RLF Ceiling Rate 5 2.268.000 11.340.000 EGM TA/SubTA INFRA/Sub TA Safeguard Ceiling Rate 3 2.268.000 6.804.000 EGM TA/SubTA Monev /Sub TA Legal HCU Ceiling Rate 3 2.268.000 6.804.000 EGM TA/SubTA SIM Ceiling Rate 3 2.268.000 6.804.000 EGM TA Local Goverment Ceiling Rate 3 2.268.000 6.804.000 EGM TA Urban Planner Ceiling Rate 3 2.268.000 6.804.000 In land Transport in Jakarta fixed Rate 28 200.000 5.600.000
OSA fixed Rate 124 100.000 12.400.000
2.2.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 30.312.000 Air Transport Ceiling Rate 9 2.268.000 20.412.000 In land Transport in Jakarta fixed Rate 9 200.000 1.800.000 Hotel Accommodation Ceiling Rate 18 300.000 5.400.000
OSA fixed Rate 27 100.000 2.700.000
2.2.2.4 FOR COORDINATION MEETING CITY COORDINATOR TO JAKARTA (by request) 35.480.000 TOT Pemandu Nasional Korkot/Askorkot Pemandu Nasional
Air Transport Ceiling Rate 4 2.268.000 9.072.000 In land Transport in Jakarta fixed Rate 4 200.000 800.000
OSA fixed Rate 32 100.000 3.200.000
TOT Pelatihan Program Lanjutan
Air Transport Ceiling Rate 2 2.268.000 4.536.000 In land Transport in Jakarta fixed Rate 2 200.000 400.000
OSA fixed Rate 8 100.000 800.000
FOR COORDINATION MEETING
Air Transport Ceiling Rate 4 2.268.000 9.072.000 In land Transport fixed Rate 4 200.000 800.000 Hotel Accommodation Ceiling Rate 16 300.000 4.800.000
OSA fixed Rate 20 100.000 2.000.000
2.2.2.5 TO OTHER LOCATION (By Request) 32.400.000
Air Transport Ceiling Rate 6 3.500.000 21.000.000 In land Transport fixed Rate 6 200.000 1.200.000 Hotel Accommodation Ceiling Rate 24 300.000 7.200.000
OSA fixed Rate 30 100.000 3.000.000
OVERSIGHT SERVICE PROVIDER [ OSP ] - 5
NATIONAL PROGRAM FOR COMMUNITY EMPOWERNMENT IN URBAN AREAS
II. DIRECT REEIMBURSABLE COST
2.3. OFFICE OPERATIONAL EXPENSESPROVINCE
Vol Unit Price (IDR)
Total Amount (IDR)
2.3.1 OFFICE RUNNING COST 531.000.000
2.3.1.1 OSP Office 60.000.000
a Propinsi Jawa Tengah (Semarang) 15 2.500.000 37.500.000 b Propinsi DI Yiogyakarta 15 1.500.000 22.500.000
2.3.1.2 City Coordinator Office 422.250.000
a Propinsi Jawa Tengah 375.000.000
Cluster 1 (7 korkot)
Korkot Purbalingga (44 kelurahan) 15 950.000 14.250.000 Korkot Magelang (27 kelurahan) 15 950.000 14.250.000 Korkot Blora (45 kelurahan) 15 950.000 14.250.000 Korkot Temanggung (41 kelurahan) 15 950.000 14.250.000 Korkot Batang (39 kelurahan) 15 950.000 14.250.000 Korkot Brebes (38 kelurahan) 15 950.000 14.250.000 Korkot Kota Pekalongan (47 kelurahan) 15 950.000 14.250.000 Cluster 2 (11 korkot)
Korkot Banyumas (85 kelurahan) 15 1.100.000 16.500.000 Korkot Kebumen (54 kelurahan) 15 1.100.000 16.500.000 Korkot Boyolali (61 kelurahan) 15 1.100.000 16.500.000 Korkot Sukoharjo (83 kelurahan) 15 1.100.000 16.500.000 Korkot Karanganyar (51 kelurahan) 15 1.100.000 16.500.000 Korkot Rembang (54 kelurahan) 15 1.100.000 16.500.000 Korkot Kudus (86 kelurahan) 15 1.100.000 16.500.000 Korkot Jepara (86 kelurahan) 15 1.100.000 16.500.000 Korkot Kendal (57 kelurahan) 15 1.100.000 16.500.000 Korkot Pemalang (79 kelurahan) 15 1.100.000 16.500.000 Korkot Kota Surakarta (51 kelurahan) 15 1.100.000 16.500.000 Cluster 3 (4 korkot)
Korkot Pati (101 kelurahan) 15 1.250.000 18.750.000 Korkot Pekalongan (119 kelurahan) 15 1.250.000 18.750.000 Korkot Tegal (116 kelurahan) 15 1.250.000 18.750.000 Korkot Kota Semarang (177 kelurahan) 15 1.250.000 18.750.000 Cluster 4 (1 korkot)
Korkot Klaten 15 1.250.000 18.750.000
b Propinsi DI Yogyakarta 47.250.000
(3 Kota/Kab)
NO. DESCRIPTION REMARK
Ceiling Rate
AMENDMENT CONTRACT NO.2
Vol
(IDR) (IDR) Cluster 1 (1 korkot)
Korkot Kota Yogyakarta (45 kelurahan) 15 950.000 14.250.000 Cluster 2 (2 korkot)
Korkot Sleman (75 kelurahan) 15 1.100.000 16.500.000 Korkot Bantul (50 kelurahan) 15 1.100.000 16.500.000
2.3.1.3 Assitant CD City Coordinator Office 48.750.000
a Propinsi Jawa Tengah 45.000.000
(12 Kota/Kab) 180 250.000 45.000.000
b Propinsi DI Yogyakarta 3.750.000
(1 Kota/Kab) 15 250.000 3.750.000
2.3.2 OFFICE SUPPLY & CONSUMABLE 184.875.000
2.3.2.1 OSP Office 26.250.000
a Propinsi Jawa Tengah (Semarang) 15 1.000.000 15.000.000 b Propinsi DI. Yogyakarta 15 750.000 11.250.000
2.3.2.2 City Coordinator Office 129.375.000
a Propinsi Jawa Tengah 116.625.000
Cluster 1
Korkot Purbalingga (44 kelurahan) 15 250.000 3.750.000 Korkot Magelang (27 kelurahan) 15 250.000 3.750.000 Korkot Blora (45 kelurahan) 15 250.000 3.750.000 Korkot Temanggung (41 kelurahan) 15 250.000 3.750.000 Korkot Batang (39 kelurahan) 15 250.000 3.750.000 Korkot Brebes (38 kelurahan) 15 250.000 3.750.000 Korkot Kota Pekalongan (47 kelurahan) 15 250.000 3.750.000 Cluster 2
Korkot Banyumas (85 kelurahan) 15 300.000 4.500.000 Korkot Kebumen (54 kelurahan) 15 300.000 4.500.000 Korkot Boyolali (61 kelurahan) 15 300.000 4.500.000 Korkot Sukoharjo (83 kelurahan) 15 300.000 4.500.000 Korkot Karanganyar (51 kelurahan) 15 300.000 4.500.000 Korkot Rembang (54 kelurahan) 15 300.000 4.500.000 Korkot Kudus (86 kelurahan) 15 300.000 4.500.000 Korkot Jepara (86 kelurahan) 15 300.000 4.500.000 Korkot Kendal (57 kelurahan) 15 300.000 4.500.000 Korkot Pemalang (79 kelurahan) 15 300.000 4.500.000 Korkot Kota Surakarta (51 kelurahan) 15 300.000 4.500.000 Cluster 3
Korkot Pati (101 kelurahan) 15 500.000 7.500.000 Fixed Rate
Ceiling Rate
Vol Unit Price (IDR)
Total Amount (IDR)
NO. DESCRIPTION REMARK
AMENDMENT CONTRACT NO.2
Korkot Pekalongan (119 kelurahan) 15 500.000 7.500.000 Korkot Tegal (116 kelurahan) 15 500.000 7.500.000 Korkot Kota Semarang (177 kelurahan) 15 500.000 7.500.000 Cluster 4
Korkot Klaten 15 725.000 10.875.000
b Propinsi DI Yogyakarta 12.750.000
(3 Kota/Kab) Cluster 1
Korkot Kota Yogyakarta (45 kelurahan) 15 250.000 3.750.000 Cluster 2
Korkot Sleman (75 kelurahan) 15 300.000 4.500.000 Korkot Bantul (50 kelurahan) 15 300.000 4.500.000
2.3.2.3 Assitant CD City Coordinator Office 29.250.000
a Propinsi Jawa Tengah 27.000.000
(12 Kota/Kab) 180 150.000 27.000.000
b Propinsi DI Yogyakarta 2.250.000
(1 Kota/Kab) 15 150.000 2.250.000
2.3.3 COMMUNICATION COST 165.000.000
2.3.3.1 OSP Office 15.000.000
a Propinsi Jawa Tengah (Semarang) 15 500.000 7.500.000 b Propinsi DI. Yogyakarta 15 500.000 7.500.000
2.3.3.2 City Coordinator Office 130.500.000
a Propinsi Jawa Tengah
( 26 Kota/Kab) 390 300.000 117.000.000 b Propinsi DI Yogyakarta
(3 Kota/Kab) 45 300.000 13.500.000 2.3.3.3 Assitant CD City Coordinator Office 19.500.000
a Propinsi Jawa Tengah
(12 Kota/Kab) 180 100.000 18.000.000 b Propinsi DI Yogyakarta
(1 Kota/Kab) 15 100.000 1.500.000
2.3.4 INTERNET 22.500.000
2.3.4.1 OSP Office 22.500.000
a Propinsi Jawa Tengah (Semarang) 15 750.000 11.250.000 b Propinsi DI. Yogyakarta 15 750.000 11.250.000
TOTAL OF OFFICE OPERATIONAL EXPENSES 903.375.000
Fixed Rate Fixed Rate Fixed Rate Fixed rate Fixed Rate Fixed Rate
II. DIRECT REEIMBURSABLE COST
2.4 OFFICE EQUIPMENT EXPENSES
Vol
Unit Price
(IDR)
Total Amount
(IDR)
2,4
OSP OFFICE
139.149.325
2.4.1.1 Propinsi Jawa Tengah (Semarang)
69.643.665
a Desktop Computer
5
5.000.000
25.000.000
b Laptop/Notebook
5
5.500.000
27.500.000
c Printer Laser Jet
1
2.000.000
2.000.000
d Printer Color A3
1
3.000.000
3.000.000
e Digital Camera
1
1.250.000
1.250.000
f GPS tools
1
3.500.000
3.500.000
g LCD Projector
1
4.500.000
4.500.000
h Scanner
1
1.000.000
1.000.000
i Equipment Maintenance (Include existing equipment)
-
3.000.000
-1
1.893.665
1.893.665
2.4.1.2 Propinsi DI. Yogyakarta
69.505.660
a Desktop Computer
5
5.000.000
25.000.000
b Laptop/Notebook
5
5.500.000
27.500.000
c Printer Laser Jet
1
2.000.000
2.000.000
d Printer Color A3
1
3.000.000
3.000.000
e Digital Camera
1
1.250.000
1.250.000
f GPS tools
1
3.500.000
3.500.000
g LCD Projector
1
4.500.000
4.500.000
h Scanner
1
1.000.000
1.000.000
i Equipment Maintenance (Include existing equipment)
-
3.000.000
-1
1.755.660
1.755.660
TOTAL OF OFFICE EQUIPMENT EXPENSES
139.149.325
AMENDMENT CONTRACT NO.2
fixed Rate
NO.
DESCRIPTION
Remark
OVERSIGHT SERVICE PROVIDER [ OSP ] - 5
NATIONAL PROGRAM FOR COMMUNITY EMPOWERNMENT IN URBAN AREAS
II. DIRECT REEIMBURSABLE COST
2.5 RENTAL EXPENSES
Vol
Unit Price
(IDR)
Total Amount
(IDR)
2.5.1
OSP OFFICE SPACE (including furniture, AC etc)
-
198.675.000
space/m2 mth
2.5.1.1 Jawa Tengah (Semarang) 266 8
3.990
25.000
99.750.000
2.5.1.2 DI. Yogyakarta 160 8
2.397
25.000
59.925.000
2.5.1.3 For City Coordinator (29 Korkot) 29 8
-
100.000
-For City Coordinator (29 Korkot) 26 8
390
100.000
39.000.000
2.5.2
VEHICLES (Minimun Y 2010 - Included driver, O & M, Insurance
etc) for OSP Office
450.000.000
unit mth
2.5.2.1 Jawa Tengah (Semarang) 3 8
45
6.000.000
270.000.000
2.5.2.2 DI. Yogyakarta 2 8
30
6.000.000
180.000.000
2.5.3
VEHICLES (Minimun Y 2010 - Included driver, O & M, Insurance
etc) for City Coordinator Office
2.610.000.000
2.5.3.1 Jawa Tengah unit mth
( 26 Kota/Kab) 26 8
390
6.000.000
2.340.000.000
2.5.3.2 DI. Yogyakarta
(3 Kota/Kab) 3 8
45
6.000.000
270.000.000
2.5.4
MOTORCYCLE (Minimun Y 2010 - Included O & M, Insuranc
For Assistant CD Mandiri of City Coordinators
78.000.000
2.5.4.1 Jawa Tengah unit mth
(12 Kota/Kab) 12 8
180
400.000
72.000.000
2.5.4.2 DI. Yogyakarta
(1 Kota/Kab) 1 8
15
400.000
6.000.000
TOTAL OF RENTAL EXPENSES
3.336.675.000
AMENDMENT CONTRACT NO.2
Fixed Rate
Fixed Rate
NO.
DESCRIPTION
Remark
Fixed Rate
II. DIRECT REEIMBURSABLE COST
2.6 REPORTING EXPENSES
Vol Unit Price (IDR)
Total Amount (IDR)
2.6.1 REGULAR REPORT Time Eks 12.750.000
a Inception Report 1 15 15 50.000 750.000 b Monthly Report 4 15 120 25.000 3.000.000 c Quarterly Report 2 15 60 25.000 1.500.000 d Annual Report 1 15 30 50.000 1.500.000 e Draft Final Report 1 20 20 50.000 1.000.000 f Final Report (Indonesia & English) 1 40 40 100.000 4.000.000 g Executive Summary (Indonesia & English) 1 40 40 25.000 1.000.000
2.6.2 SPECIAL REPORT Time Eks 5.250.000
a Performance Evaluation of OSP 2 15 45 25.000 1.125.000 b Training Activity Report 1 50 50 25.000 1.250.000 c Complaint Resolution Follow-up Report 8 5 75 25.000 1.875.000 d Workshop Findings and Results 1 20 40 25.000 1.000.000
TOTAL REPORTING EXPENSES 18.000.000
AMENDMENT CONTRACT NO.2
fixed rate
NO. DESCRIPTION
Remark
OVERSIGHT SERVICE PROVIDER [ OSP ] - 5
NATIONAL PROGRAM FOR COMMUNITY EMPOWERNMENT IN URBAN AREAS 3.1 BREAKDOWN OF TRAINING ACTIVITY
Vol. Unit Price(IDR) Total Amount(IDR)
3.1.1 IN REGIONAL LEVELS (Semarang) Time/
Event Days Ptcp Instr 6.500.000
a Rakor OSP 2 2 6 4 20 250.000 5.000.000
- Kits 10 10 50.000 500.000
- Speaker honorarium 4 2 500.000 1.000.000
3.2.2 IN PROVINCIAL LEVELS Time/
Event Days Ptcp Instr 876.640.000 a OSP Consolidation Jawa Tengah 2 1 283 3 276 100.000 27.600.000 b OSP Consolidation DI. Yogyakarta 2 1 39 3 42 100.000 4.200.000 c Special Training for Kelurahan Facilitators (Technic) 1 3 472 6 - 200.000 -d Special Training for Kelurahan Facilitators (Economic) 1 3 265 5 - 200.000 -e Special Training for Kelurahan Facilitators (Social) 1 3 396 5 - 200.000 -f Special Training for Senior Facilitators 1 3 265 5 - 200.000 -g Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder 1 2 22 - 200.000 -h Pelatihan Penguatan Pemda dan Stakeholder 1 5 295 4 - 360.000 -i Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator 1 2 103 4 - 200.000 -j Pelatihan Penguatan Askot dan Fasilitator 1 5 1608 9 - 200.000 -k Konsolidasi Pemandu Pelatihan PLPBK 2 2 22 44 200.000 8.800.000 l Pelatihan Dasar PLPBK (Lokasi baru tahun 2012) 1 6 279 4 - 200.000 -m Pelatihan Penguatan PLPBK (Lokasi baru tahun 2012) 1 4 279 4 - 200.000
-n Pelatihan Dasar PLPBK (Lokasi baru tahun 2013) 1 6 369 4 2.202 200.000 440.400.000
o Pelatihan Penguatan PLPBK (Lokasi baru tahun 2013) 1 4 369 4 - 200.000
-p Pelatihan Tim Teknis PLPBK (Lokasi Baru tahun 2013) 1 4 112 4 464 360.000 167.040.000 q Konsolidasi Pelatihan Khusus Fasilitator 1 1 22 4 26 200.000 5.200.000 r Training for City Coordinators Assistants (Infrastructure, Economic,
Community Dev, MIS, Urban Planner)
1 3 220 7 681 200.000 136.200.000 s Pelatihan Dasar PLPBK 1 6 481 37 426 200.000 85.200.000 t Pelatihan Penguatan PLPBK 1 4 481 37 - 200.000 -u Narasumber PLPBK 4 4 500.000 2.000.000 v Konsolidasi Pemandu Pelatihan KSB 2 1 6 3 - 200.000 -w Pelatihan Dasar KSB 1 6 68 12 - 200.000 -x Pelatihan Penguatan KSB 1 3 68 12 - 200.000 -y Narasumber 4 - 500.000
-3.2.3 In City/Regency Levels Time/
Event Days Ptcp Instr -a Thematic Discussion / Reflection of KBP 1 1 862 2 - 75.000 -b Consolidation of Kelurahan Facilitators, City Coordinators Assistants &
City Coordinators
2 1 1543 - - 25.000
-c Speaker honorarium 2 - 500.000
-1 IN REGIONAL LEVELS Time/
Event Days Peserta Instr
18.600.000
a Rakor OSP 2 2 14 2 64 250.000 16.000.000 - Kits 2 14 2 32 50.000 1.600.000 - Speaker honorarium 2 2 500.000 1.000.000
2 IN PROVINCIAL LEVELS Time/
Event Days Ptcp Instr
2.124.480.000
a.1 OSP Consolidation Jawa Tengah 2 1 60 2 124 100.000 12.400.000 a.2 OSP Consolidation Yogyakarta 2 1 25 2 54 100.000 5.400.000 b.1 Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan 1 1 144 8 152 200.000 30.400.000 b.2 Pelatihan Penguatan Program Lanjutan 1 5 1453 144 7.985 200.000 1.597.000.000 c.1 Konsolidasi Pemandu Pelatihan Pemerintah Daerah 1 1 25 5 30 200.000 6.000.000 c.2 Pelatihan Pemerintah Daerah 1 3 226 25 753 360.000 271.080.000
AMENDMENT CONTRACT NO.2
Ceiling Rate NO. DESCRIPTION Remark Ceiling Rate Ceiling Rate
Vol. (IDR) (IDR)
d Pelatihan SIM 1 3 40 8 144 200.000 28.800.000
e Pelatihan Dasar PLPBK 1 6 0 0 - - -f Pelatihan Penguatan PLPBK 1 3 262 27 867 200.000 173.400.000 g Pelatihan Tim Teknis Pemda 1 4 130 10 - -
-3.3.3 In City/Regency Levels Time/
Event Days Ptcp Instr
258.525.000
a Thematic Discussion / Reflection of KBP, city changer, FK BKM 2 1 800 80 1.760 75.000 132.000.000 b Consolidation of Kelurahan Facilitators, City Coordinators Assistants &
City Coordinators 3 1 1.453 96
4.821
25.000 120.525.000
c Speaker honorarium 12 12 500.000 6.000.000