PEKERJAAN PLUMBING
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JMLH HARGA
(Rp) (Rp)
I PEKERJAAN PLUMBING BANGUNAN UTAMA & TURUTAN ( TAHAP III ) A Instalasi Main Line Air Bersih & Air Kotor
1 Pipa air bersih PPR PN20
Dia. 3' 48,00 m
Dia. 21/2" 98,00 m Pipa GIP Ke PDAM Dia. 2" 70,00 m Fitting & aksesoris 1,00 ls
B Instalasi Air Bersih & Air Kotor Dalam Gedung 1 Lantai 1
3 Pipa air kotor PVC AW
Dia. 4" 204,00 m
Dia. 3" 158,00 m
Fitting & aksesoris 1,00 ls Clean Out dia. 4" 1,00 bh
C INSTALASI TANDON AIR AREA LOUNDRY KITVHEN, KANTEEN & K. JENAZAH
1 Pompa Distribusi 2,00 unit Kapasitas : 275 LPM
Total Head : 40 meter Power : 3,7 KW
5 Pressure gauge 1,00 bh
6 Pressure switch 5,00 bh
7 WLC 5,00 set
RENCANA ANGGARAN BIAYA
D INSTALASI PLUMBING AREA CSSD
1 Water Heater Kaps. 100L 1,00 unit
1 Instalasi Air Bersih Pipa air bersih PPR PN20
Dia. 1' 15,00 m
Dia. 3/4" 51,00 m Fitting & aksesoris 1,00 ls
3 Pipa air kotor PVC AW
Dia. 4" 25,00 m
TOTAL PEKERJAAN PLUMBING GEDUNG UTAMA
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JMLH HARGA
(Rp) (Rp)
I PEKERJAAN PLUMBING GEDUNG DIAGNOSTIK A Pelalatan Utama
1 Pompa Distribusi 2,00 unit Kapasitas : 275 LPM
Total Head : 40 meter Power : 3,7 KW
6 Pressure gauge 2,00 bh
7 Pressure switch 2,00 bh
8 Ground Tank 10 m3 1,00 unit
B Instalasi Main Line Air Bersih & Air Kotor 1 Pipa air bersih PPR PN20
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JMLH HARGA
(Rp) (Rp)
2 Pipa Air Kotor PVC AW
Dia.4" 40,70 m
C Instalasi Air Bersih & Air Kotor Dalam Gedung 1 Lantai 1
3 Pipa air kotor PVC AW
Dia. 4" 50,50 m 3 Pipa air kotor PVC AW
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JMLH HARGA
(Rp) (Rp)
3 Lantai 3
1 Pipa air bersih PPR PN20
Dia. 11/2" 28,60 m Dia. 3/4"" 106,70 m Fitting & aksesoris 1,00 ls 2 Gate Valve
Dia. 3/4" 2,00 bh Dia. 1 1/4" 1,00 bh 3 Pipa air kotor PVC AW
Dia. 4" 22,00 m
Dia. 3" 47,80 m
Dia. 2" 63,80 m
Dia. 11/2" 11,60 m Fitting & aksesoris 1,00 ls 4 Sanitary
Floor drain 3,00 bh
Kran air 15,00 bh
Clean out dia. 4" 4,00 bh Clean out dia. 3" 8,00 bh
TOTAL PEKERJAAN PLUMBING GEDUNG DIAGNOSTIK TOTAL PEKERJAAN PLUMBING
PAJAK 10 %
JUMLAH TERMASUK PAJAK DIBULATKAN