• Tidak ada hasil yang ditemukan

CITRA INDAH KOTA NUANSA ALAM TIMUR CIBUBUR SELATAN CIKARANG RUKO RAFLESIA BOULEVARD 01 RUKO ORCHID BOULEVARD

N/A
N/A
Protected

Academic year: 2021

Membagikan "CITRA INDAH KOTA NUANSA ALAM TIMUR CIBUBUR SELATAN CIKARANG RUKO RAFLESIA BOULEVARD 01 RUKO ORCHID BOULEVARD"

Copied!
14
0
0

Teks penuh

(1)

20-11-17 5 THN 8 THN 10 THN 20-11-17 5 THN 8 THN 10 THN 20-11-17 5 THN 8 THN 10 THN

HARGA SUDAH TERMASUK: CARA KPR:

839,158,755 16,815,021 11,650,771 9,960,965

56/60 690,335,000 763,135,175 818,601,975 749,268,475 112,390,271 636,878,204 12,761,734

TUNAI ANGSURAN DEVELOPER

1THN

ANGSURAN DEVELOPER

2 THN KPR KE 1 DP 15%

1,078,512,469 987,245,594 148,086,839

ANGSURAN KPR SUKU BUNGA 7.5%

71/75

ANGSURAN KPR SUKU BUNGA 7.5%

8,842,334 7,559,859 TIPE LB/LT 1,201,280,000 1,327,729,400 1,424,071,800 909,668,750 PLAPON KPR 1,005,498,969 76/120 62/100 22,203,997 15,384,678 17,512,618 12,134,121 10,374,211 195,546,570 1,108,097,230

RUKO RAFLESIA BOULEVARD 01

RUKO ORCHID BOULEVARD

13,153,314 1,028,202,988 154,230,448 873,972,540 947,417,500 1,047,211,338 1,123,244,738 ANGSURAN DEVELOPER 1THN ANGSURAN DEVELOPER 2 THN

TIPE LB/LT TUNAI KPR KE 1 DP 15% PLAPON KPR

1,303,643,800

RUKO CHRYSANT BOULEVARD

TIPE LB/LT TUNAI ANGSURAN DEVELOPER

1THN

ANGSURAN DEVELOPER

2 THN KPR KE 1 DP 15%

71/75 871,086,250 962,865,306 1,032,792,206 945,383,581 141,807,537

107,374,316 608,454,459 12,192,180

PLAPON KPR ANGSURAN KPR SUKU BUNGA 7.5%

803,576,044 16,102,017

8,447,703 7,222,464

TIMUR CIBUBUR SELATAN CIKARANG

KOTA NUANSA ALAM

CITRA INDAH

11,156,745 9,538,592 56/60 659,515,000 729,079,075 782,080,275 715,828,775 HENDRO Whatsapp: 0821 2424 5610 Email:hendrotyo@yahoo.com www.citraindahcileungsi.com

(2)

20-11-17 HARGA 1 THN HARGA 2 THN KE DEVELOPER KE DEVELOPER 5THN 8 THN 10 THN 15 THN 20 THN JASMINE 1.45/136 556,561,250 615,315,181 660,080,081 604,123,956 30,206,198 573,917,758 11,500,135 7,968,200 6,812,507 5,320,286 4,623,441 JASMINE 1A.45/150 583,931,250 645,559,031 692,513,531 633,820,406 31,691,020 602,129,386 12,065,439 8,359,886 7,147,384 5,581,812 4,850,712 JASMINE 1B.45/170 623,031,250 688,764,531 738,847,031 676,243,906 33,812,195 642,431,711 12,873,014 8,919,438 7,625,780 5,955,419 5,175,385 JASMINE 1C. 52/170 668,715,000 739,245,075 792,982,275 725,810,775 36,290,539 689,520,236 13,816,572 9,573,209 8,184,729 6,391,935 5,554,727 JASMINE 1D.45/180 642,581,250 710,367,281 762,013,781 697,455,656 34,872,783 662,582,873 13,276,802 9,199,214 7,864,978 6,142,223 5,337,721 JASMINE 2.60/170 720,925,000 796,937,125 854,851,125 782,458,625 39,122,931 743,335,694 14,894,923 10,320,376 8,823,528 6,890,811 5,988,260 JASMINE 2A.60/180 740,925,000 818,539,875 878,017,875 803,670,375 40,183,519 763,486,856 15,298,711 10,600,152 9,062,726 7,077,615 6,150,597 JASMINE 3.66/200 864,732,500 955,844,413 1,025,263,013 938,489,763 46,924,488 891,565,275 17,865,140 12,378,376 10,583,040 8,264,917 7,182,387 JASMINE 3A.70/200 890,837,500 984,690,438 1,056,197,438 966,813,688 48,340,684 918,473,004 18,404,316 12,751,960 10,902,440 8,514,355 7,399,154 JASMINE 3B.52/200 773,368,000 854,883,325 916,992,525 839,356,025 41,967,801 797,388,224 15,978,025 11,070,834 9,465,142 7,391,885 6,423,704

HARGA SUDAH TERMASUK: CARA KPR:

AJB,PPN,BBN Sertipikat HGB ,IMB,BPHTB,AIR PDAM,LISTRIK 1300 WATT. Hari ke 1:Booking fee 2,5 jt

SYARAT KPR: Hari ke 7:Menyerahkan persyaratan kpr

COPY KTP SUAMI ISTRI,KK,SURAT NIKAH (jika sudah menikah) Hari ke 30:Pelunasan uang muka

KETERANGAN KERJA & SLIP GAJI,NPWP PRIBADI Hari ke 60:Akad kredit

REKENING TABUNGAN 3 BULAN TERAKHIR

USIA MINIMAL 21 THN Survey tiap sabtu & minggu jam 9.00 & 12.00 dari Mall Citraland Grogol TIDAK ADA MASALAH DENGAN BANK (BI CHECKING)

TIMUR CIBUBUR SELATAN CIKARANG

CLUSTER REAL ESTATE BUKIT JASMINE (Dobel Wall Bata Merah)

TIPE HARGA TUNAI KPR KE 1 DP 5 % PLAPON KPR ASUMSI ANGSURAN KPR SUKU BUNGA 7.5 %

CITRA INDAH KOTA NUANSA ALAM

HENDRO

0815 1414 2401 0821 2424 5610 PIN BB: 54F5CC41 Whatsapp: 0821 2424 5610 Email:hendrotyo@yahoo.com www.citraindahcileungsi.com

HENDRO

Whatsapp: 0821 2424 5610 Email:hendrotyo@yahoo.com www.citraindahcileungsi.com

(3)

20-Nov-17 HARGA 1 THN HARGA 2 THN KE DEVELOPER KE DEVELOPER 5THN 8 THN 10 THN 15 THN 20 THN DAHLIA 1 38/90 334,410,000 369,838,050 396,830,850 363,089,850 18,154,493 344,935,358 6,911,797 4,789,038 4,094,445 3,197,592 2,778,775 DAHLIA 1A 38/90 339,585,000 375,556,425 402,962,225 368,704,725 18,435,236 350,269,489 7,018,683 4,863,096 4,157,762 3,247,040 2,821,746 DAHLIA 1B 38/108 366,495,000 405,291,975 434,851,575 397,902,075 19,895,104 378,006,971 7,574,485 5,248,200 4,487,011 3,504,170 3,045,198 DAHLIA 1C 33/90 311,122,500 344,105,363 369,235,163 337,822,913 16,891,146 320,931,767 6,430,815 4,455,775 3,809,518 2,975,076 2,585,404 DAHLIA 2 42/120 406,515,000 449,514,075 482,275,275 441,323,775 22,066,189 419,257,586 8,401,063 5,820,918 4,976,663 3,886,568 3,377,510 DAHLIA 2A 42/120 420,315,000 464,763,075 498,628,275 456,296,775 22,814,839 433,481,936 8,686,089 6,018,407 5,145,509 4,018,430 3,492,100 DAHLIA 2B 36/120 392,370,000 433,883,850 465,513,450 425,976,450 21,298,823 404,677,628 8,108,910 5,618,492 4,803,596 3,751,410 3,260,055 DAHLIA 3 48/150 521,745,000 576,843,225 618,822,825 566,348,325 28,317,416 538,030,909 10,781,036 7,469,951 6,386,524 4,987,611 4,334,339 DAHLIA 3A 40/150 481,725,000 532,621,125 571,399,125 522,926,625 26,146,331 496,780,294 9,954,459 6,897,233 5,896,872 4,605,213 4,002,027

HARGA SUDAH TERMASUK: CARA KPR:

CITRA INDAH KOTA NUANSA ALAM TIMUR CIBUBUR SELATAN CIKARANG

CLUSTER SEMI REAL ESTATE BUKIT DAHLIA (Dobel Wall Batako)

TIPE HARGA TUNAI KPR KE 1 DP 5% PLAPON KPR ASUMSI ANGSURAN KPR SUKU BUNGA 7.5 %

HENDRO Whatsapp: 0821 2424 5610 Email:hendrotyo@yahoo.com www.citraindahcileungsi.com

(4)

CLUSTER REAL ESTATE BUKIT ORCHID (Dobel Wall Bata Merah)

12-Nov-17 HARGA 1 THN HARGA 2 THN KE DEVELOPER KE DEVELOPER 5THN 8 THN 10 THN 15 THN 20 THN ORCHID 1, 39/90 432,648,750 478,391,869 513,243,769 469,678,894 23,483,945 446,194,949 8,940,832 6,194,913 5,296,414 4,136,281 3,594,515 ORCHID 1A, 39/120 493,023,750 545,106,244 584,788,144 535,185,769 26,759,288 508,426,481 10,187,824 7,058,927 6,035,114 4,713,174 4,095,848 ORCHID 1B, 39/128 509,123,750 562,896,744 603,866,644 552,654,269 27,632,713 525,021,556 10,520,356 7,289,331 6,232,100 4,867,013 4,229,537 ORCHID 2, 45/120 532,181,250 588,375,281 631,189,781 577,671,656 28,883,583 548,788,073 10,996,588 7,619,302 6,514,213 5,087,331 4,420,998 ORCHID 2A, 45/136 564,381,250 623,956,281 669,346,781 612,608,656 30,630,433 581,978,223 11,661,651 8,080,110 6,908,186 5,395,008 4,688,376 ORCHID 3, 45/160 612,681,250 677,327,781 726,582,281 665,014,156 33,250,708 631,763,448 12,659,244 8,771,322 7,499,146 5,856,523 5,089,442 ORCHID 3A, 45/170 632,806,250 699,565,906 750,430,406 686,849,781 34,342,489 652,507,292 13,074,908 9,059,326 7,745,379 6,048,821 5,256,553 ORCHID 4, 59/136 681,192,500 753,032,713 807,768,113 739,348,863 36,967,443 702,381,420 14,074,284 9,751,772 8,337,394 6,511,160 5,658,336 ORCHID 4A, 59/160 766,292,500 847,068,213 908,611,613 831,682,363 41,584,118 790,098,245 15,831,949 10,969,621 9,378,608 7,324,306 6,364,976 ORCHID 5, 70/160 842,825,000 931,636,625 999,302,625 914,720,125 45,736,006 868,984,119 17,412,660 12,064,863 10,314,998 8,055,587 7,000,475

HARGA SUDAH TERMASUK: CARA KPR:

AJB,PPN,BBN Sertipikat HGB ,IMB,BPHTB,AIR PDAM,LISTRIK 1300 WATT. Hari ke 1:Booking fee 2,5 jt

SYARAT KPR: Hari ke 7:Menyerahkan persyaratan kpr

COPY KTP SUAMI ISTRI,KK,SURAT NIKAH (jika sudah menikah) Hari ke 30:Pelunasan uang muka

KETERANGAN KERJA & SLIP GAJI,NPWP PRIBADI Hari ke 60:Akad kredit

REKENING TABUNGAN 3 BULAN TERAKHIR

USIA MINIMAL 21 THN Survey tiap sabtu & minggu jam 9.00 & 12.00 dari Mall Citraland Grogol TIDAK ADA MASALAH DENGAN BANK (BI CHECKING)

CITRA INDAH KOTA NUANSA ALAM TIMUR CIBUBUR SELATAN CIKARANG

TIPE HARGA TUNAI KPR KE 1 DP 5 % PLAPON KPR ASUMSI ANGSURAN KPR 7.5 %

HENDRO

Whatsapp: 0821 2424 5610 Email:hendrotyo@yahoo.com www.citraindahcileungsi.com

(5)

12-Nov-17 HARGA 1 THN HARGA 2 THN KE DEVELOPER KE DEVELOPER 5THN 8 THN 10 THN 15 THN 20 THN CORDIA 1. 22/60 154,780,000 171,346,900 183,969,300 168,191,300 8,409,565 159,781,735 3,201,698 2,218,389 1,896,638 1,481,196 1,287,190 CORDIA 1A. 22/72 177,780,000 196,761,900 211,224,300 193,146,300 9,657,315 183,488,985 3,676,743 2,547,537 2,178,047 1,700,965 1,478,174 CORDIA 1B. 22/90 212,912,500 235,583,313 252,856,313 231,265,063 11,563,253 219,701,810 4,402,374 3,050,311 2,607,900 2,036,662 1,769,902 CORDIA 1C. 22/102 233,267,500 258,075,588 276,976,988 253,350,238 12,667,512 240,682,726 4,822,788 3,341,608 2,856,947 2,231,158 1,938,923 CORDIA 2. 30/72 208,485,000 230,690,925 247,609,725 226,461,225 11,323,061 215,138,164 4,310,928 2,986,950 2,553,729 1,994,357 1,733,138 CORDIA 3. 36/90 259,372,500 286,912,613 307,911,413 281,674,163 14,083,708 267,590,455 5,361,964 3,715,191 3,176,347 2,480,596 2,155,690 CORDIA 3B. 36/90 279,555,000 309,223,275 331,827,675 303,572,175 15,178,609 288,393,566 5,778,816 4,004,019 3,423,284 2,673,443 2,323,278 CORDIA 4. 38/105 338,205,000 374,031,525 401,327,925 367,207,425 18,360,371 348,847,054 6,990,180 4,843,347 4,140,877 3,233,854 2,810,287

HARGA SUDAH TERMASUK: CARA KPR:

CITRA INDAH KOTA NUANSA ALAM TIMUR CIBUBUR SELATAN CIKARANG

CLUSTER SEDERHANA BUKIT CORDIA

TIPE HARGA TUNAI KPR KE 1 DP 5 % PLAPON KPR ASUMSI ANGSURAN KPR SUKU BUNGA 7.5 %

HENDRO

Whatsapp: 0821 2424 5610 Email:hendrotyo@yahoo.com www.citraindahcileungsi.com

(6)

7 Desember17 HARGA 1 THN HARGA 2 THN KE DEVELOPER KE DEVELOPER 5THN 8 THN 10 THN 15 THN 20 THN SALVIA 1 33/84 309,570,000 342,389,850 367,395,450 336,138,450 16,806,923 319,331,528 6,398,749 4,433,557 3,790,523 2,960,242 2,572,512 SALVIA 1A 36/90 334,927,500 370,409,888 397,444,088 363,651,338 18,182,567 345,468,771 6,922,486 4,796,444 4,100,776 3,202,537 2,783,072 SALVIA 2 36/105 362,958,750 401,384,419 430,661,119 394,065,244 19,703,262 374,361,982 7,501,447 5,197,593 4,443,744 3,470,380 3,015,834 SALVIA 3 38/120 423,880,400 468,702,400 502,852,800 460,164,800 23,008,240 437,156,560 8,759,721 6,069,425 5,189,127 4,052,494 3,521,703

HARGA SUDAH TERMASUK: CARA KPR:

AJB,PPN,BBN Sertipikat HGB ,IMB,BPHTB,AIR PDAM,LISTRIK 1300 WATT. Hari ke 1:Booking fee 2,5 jt

SYARAT KPR: Hari ke 7:Menyerahkan persyaratan kpr

COPY KTP SUAMI ISTRI,KK,SURAT NIKAH (jika sudah menikah) Hari ke 30:Pelunasan uang muka

KETERANGAN KERJA & SLIP GAJI,NPWP PRIBADI Hari ke 60:Akad kredit

REKENING TABUNGAN 3 BULAN TERAKHIR

USIA MINIMAL 21 THN Survey tiap sabtu & minggu jam 9.00 & 12.00 dari Mall Citraland Grogol

TIDAK ADA MASALAH DENGAN BANK (BI CHECKING)

CITRA INDAH KOTA NUANSA ALAM TIMUR CIBUBUR SELATAN CIKARANG

CLUSTER SEDERHANA BUKIT SALVIA

TIPE HARGA TUNAI KPR KE 1 DP 5 % PLAPON KPR ASUMSI ANGSURAN KPR SUKU BUNGA 7.5 %

HENDRO

Whatsapp: 0821 2424 5610 Email:hendrotyo@yahoo.com www.citraindahcileungsi.com

(7)

20-11-17 HARGA 1 THN HARGA 2 THN KE DEVELOPER KE DEVELOPER 5THN 8 THN 10 THN 15 THN 20 THN CERBERA 1 22/60 156,505,000 173,253,025 186,013,425 170,062,925 8,503,146 161,559,779 3,237,327 2,243,075 1,917,744 1,497,679 1,301,514 CERBERA 1A 22/72 181,747,500 201,145,988 215,925,788 197,451,038 9,872,552 187,578,486 3,758,688 2,604,315 2,226,590 1,738,875 1,511,119 CERBERA 1B 22/78 194,800,000 215,569,000 231,393,000 211,613,000 10,580,650 201,032,350 4,028,276 2,791,107 2,386,290 1,863,594 1,619,503 CERBERA 1C 22/90 215,500,000 238,442,500 255,922,500 234,072,500 11,703,625 222,368,875 4,455,816 3,087,341 2,639,559 2,061,386 1,791,388 CERBERA 1C BLV 22/90 224,470,000 248,354,350 266,551,950 243,804,950 12,190,248 231,614,703 4,641,084 3,215,708 2,749,308 2,147,096 1,865,872 CERBERA 2 30/72 212,280,000 234,884,400 252,106,800 230,578,800 11,528,940 219,049,860 4,389,310 3,041,260 2,600,161 2,030,618 1,764,650 CERBERA 2A 30/90 245,400,000 271,482,000 291,354,000 266,514,000 13,325,700 253,188,300 5,073,374 3,515,233 3,005,391 2,347,086 2,039,667 CERBERA 3 36/90 282,142,500 312,082,483 334,893,863 306,379,613 15,318,981 291,060,632 5,832,258 4,041,048 3,454,942 2,698,167 2,344,764

HARGA SUDAH TERMASUK: CARA KPR:

CITRA INDAH KOTA NUANSA ALAM TIMUR CIBUBUR SELATAN CIKARANG

CLUSTER SEDERHANA BUKIT CERBERA

TIPE HARGA TUNAI KPR KE 1 DP 5 % PLAPON KPR ASUMSI ANGSURAN KPR SUKU BUNGA 7.5 %

HENDRO

Whatsapp: 0821 2424 5610 Email:hendrotyo@yahoo.com www.citraindahcileungsi.com

(8)
(9)
(10)
(11)
(12)
(13)
(14)

Referensi

Dokumen terkait

 berikut ini, untuk menyusun laporan arus kas tahun 2000 dengan menggunakan Direct.

Pengujian konsistensi data curah hujan pada stasiun Gubeng dilakukan dengan cara membandingkan akumulasi data hujan stasiun Gubeng dengan akumulasi rata-rata data hujan

Faktor abiotik khususnya suhu dan curah hujan, faktor biotik seperti tumbuhan inang dan serangga predator, penggunaan herbisida dan insektisida sekitar lahan cabai

Dengan mengetahui status habitat pada lumpur aktif dan kandungan limbah yang memerlukan pengolahan, maka peran mikroba dalam proses biodegradasi dan bioflokulasi yang terjadi

Menurut Horney dalam Trismiati (2006), sumber-sumber ancaman yang dapat menimbulkan kecemasan tersebut bersifat lebih umum. Penyebab kecemasan menurut Horney, dapat berasal

mene&an&an %ahwa &eperawatan adalah di!iplin ilm #n$ dalam a&i-ita!n#a men$edepan&an mene&an&an %ahwa &eperawatan adalah di!iplin ilm #n$

Berdasarkan hasil observasi peneliti saat melakukan praktik pada Bulan Januari-April 2010 di ruang Dahlia Rumah Sakit Panti Citarum Semarang, anak yang merasa cemas

[r]