X = 748810.00 Y = 9247520.00 X = 749310.00 X = 749810.00 X = 750310.00 X = 750810.00 X = 751310.00 X = 751560.00 Y = 9247020.00 Y = 9246520.00 Y = 9246020.00 X = 751504.441 Y = 9246918.445
T.1
X = 749959.000 Y = 9246437.000T.3
X = 748697.250 Y = 9246275.612T.4
LOKASI
PT. THREE-SIX WORLD
X = 749060.00 X = 749560.00 X = 750060.00 X = 750560.00 X = 751060.00 Y = 9245770.00 Y = 9246770.00 Y = 9247270.00 0 000 0 100 0 200 0 300 0 400 0 500 0 600 0 700 0 800 0 900 1 000 1 100 1 200 1 300 1 400 1 500 1 600 1 700 1 800 1 900 2 000 2 100 2 200 2 300 2 400 2 500 2 600 2 700 2 800 2 900 2 925 Sawah Sawah Sawah Pemukiman Warga Pemukiman Warga Sawah Sawah Sawah Sawah Pemukiman Warga Pemukiman Warga Pemukiman Warga Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong X = 750005.000 Y = 9246444.000T.2
KE BANDUNG KE CIANJURLAND USE
SCALE 1 : 10000 0 0 2 200 4 cm 400 mB
T
S
U
JALANSAWAH / TANAH KOSONG RUMAH WARGA
UKURAN DALAM SATUAN METER (m) R
R R
PEMBANGUN :
JUDUL PROYEK :
JUDUL GAMBAR :
ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD
KAB. CIANJUR PT. THREE-SIX WORLD
X = 750005.000 Y = 9246444.000
T.2
X = 749959.000 Y = 9246437.000T.3
LOKASI
PT. THREE-SIX WORLD
R Tanah Kosong Sawah Sawah R R R R R R R R R R R R R Tanah Kosong R R Y = 9246400.00 Y = 9246300.00 Y = 9246200.00 Y = 9246450.00 Y = 9246350.00 Y = 9246250.00 Y = 9246150.00 Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong 12.81 R Batas Pabrik Sawah Sawah Sawah Sawah Sawah KE BANDUNG KE CIANJUR 8.00 8.00LAYOUT EKSITING
002 1 : 1500 JALANSAWAH / TANAH KOSONG RUMAH WARGA
UKURAN DALAM SATUAN METER (m)
SCALE 1 : 1500 0 0 2 30 4 cm 60 m
B
T
S
U
R R R KETERANGAN PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR : NO GAMBAR : TANGGAL :A3
KONSULTAN :ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD
KAB. CIANJUR
SKALA
UKURAN
PT. THREE-SIX WORLD
X = 750005.000 Y = 9246444.000
T.2
X = 749959.000 Y = 9246437.000T.3
R Sawah Sawah R R R R R R R R R R R R R Tanah Kosong R R Y = 9246400.00 Y = 9246300.00 Y = 9246200.00 Y = 9246450.00 Y = 9246350.00 Y = 9246250.00 Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong R Sawah Sawah Sawah Sawah Sawah KE BANDUNG KE CIANJUR 8.00 8.00 9.14 20.62 49.12 55.60 12.81 45.05 16.81 AREA PARKIR 123.58 34.43 188.45 63.52 TANGKI R.GENSET AREA PARKIR SEC 51.00 CUTTING GUDANG PRODUKSI LOCKER LOBBY TOILET KANTIN MEKANIK BOILER 30.00 T.SAMPAH SEC 6.10 DRIVER LOADING CONTAINERSITE PLAN
SCALE 1 : 1500 0 0 2 30 4 cm 60 mB
T
S
U
PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR :ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD KAB. CIANJUR PT. THREE-SIX WORLD LUAS : 19,605 M2 PANJANG TEMBOK : 875 M' LUAS PAVING = 5,558.9 M2 LUAS PERKERASAN = 3,085.6 M2 LUAS TAMAN = 4,043.8 M2 LUAS BANGUNAN = 5,853.2 M2 LUAS TANAH KOSONG = 1,063.5 M2
Tanah Kosong Sawah Sawah Tanah Kosong Y = 9246400.00 Y = 9246300.00 Y = 9246200.00 Y = 9246450.00 Y = 9246350.00 Y = 9246250.00 Y = 9246150.00 Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong Sawah Sawah Sawah Sawah Sawah R7.20 KE BANDUNG KE CIANJUR 8.00 8.00 12.75 27.30 LOADING CONTAINER 9.14 20.62 49.12 55.60 45.05 16.81 43.43 33.02 AREA PARKIR 57.95 123.58 188.45 60.21 TANGKI R.GENSET AREA PARKIR 108.10 14.00 51.00 CUTTING FINISHING GUDANG PRODUKSI PACKING LOCKER LOBBY R. SERBAGUNA TOILET KANTIN MEKANIK BOILER 30.00 T.SAMPAH SEC 6.10 WORKSHOP T. AIR DRIVER LOADING CONTAINER LOADING TRUK R7.20
REKOMENDASI
SITE PLAN
004 1 : 1500 SCALE 1 : 1500 0 0 2 30 4 cm 60 mB
T
S
U
KETERANGAN PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR : NO GAMBAR : TANGGAL :A3
KONSULTAN :ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD
KAB. CIANJUR
SKALA
UKURAN
PT. THREE-SIX WORLD
Sawah Sawah Tanah Kosong Y = 9246400.00 Y = 9246300.00 Y = 9246200.00 Y = 9246450.00 Y = 9246350.00 Y = 9246250.00 Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong Sawah Sawah Sawah Sawah Sawah KE BANDUNG KE CIANJUR 8.00 8.00 LOADING CONTAINER AREA PARKIR TANGKI R.GENSET AREA PARKIR CUTTING GUDANG PRODUKSI LOCKER LOBBY TOILET KANTIN MEKANIK BOILER T.SAMPAH SEC DRIVER
REKOMENDASI
RAMBU SAAT KONSTRUKSI
SCALE 1 : 1500 0 0 2 30 4 cm 60 m
B
T
S
U
PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR :ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD KAB. CIANJUR PT. THREE-SIX WORLD
Rotary Lamp
HATI-HATI !!! ADA PEMBANGUNAN PABRIKRotary Lamp
HATI-HATI !!! ADA PEMBANGUNAN PABRIKTanah Kosong Sawah Sawah Tanah Kosong Y = 9246400.00 Y = 9246300.00 Y = 9246200.00 Y = 9246450.00 Y = 9246350.00 Y = 9246250.00 Y = 9246150.00 Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong Sawah Sawah Sawah Sawah Sawah KE BANDUNG KE CIANJUR 8.00 8.00 LOADING CONTAINER AREA PARKIR TANGKI R.GENSET AREA PARKIR CUTTING FINISHING GUDANG PRODUKSI PACKING LOCKER LOBBY R. SERBAGUNA TOILET KANTIN MEKANIK BOILER T.SAMPAH SEC WORKSHOP T. AIR DRIVER LOADING CONTAINER LOADING TRUK
ALUR SIRKULASI KENDARAAN DAN
SIRKULASI PEJALAN KAKI
006 1 : 1500 SCALE 1 : 1500 0 0 2 30 4 cm 60 m
B
T
S
U
KETERANGAN PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR : NO GAMBAR : TANGGAL :A3
KONSULTAN :ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD
KAB. CIANJUR
SKALA
UKURAN
PT. THREE-SIX WORLD
PT. BINA INSAN MANDIRI ALUR SIRKULASI PEJALAN KAKI ALUR SIRKULASI KENDARAAN
Sawah Sawah Tanah Kosong Y = 9246400.00 Y = 9246300.00 Y = 9246200.00 Y = 9246450.00 Y = 9246350.00 Y = 9246250.00 Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong Sawah Sawah Sawah Sawah Sawah KE BANDUNG KE CIANJUR 8.00 8.00 LOADING CONTAINER AREA PARKIR TANGKI R.GENSET AREA PARKIR CUTTING GUDANG PRODUKSI LOCKER LOBBY TOILET KANTIN MEKANIK BOILER T.SAMPAH SEC DRIVER
REKOMENDASI
RAMBU INTERNAL
SCALE 1 : 1500 0 0 2 30 4 cm 60 mB
T
S
U
PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR :ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD
KAB. CIANJUR PT. THREE-SIX WORLD
KE BANDUNG KE CIANJUR 8.00 5.00 4.20 27.30 12.75 8.50 8.35 R7.20 R7.20 12.85 8.00 3.85 5.78
REKOMENDASI
DETAIL BUKAAN ENTRANCE
008 1 : 400 SCALE 1 : 400 0 0 2 8 4 cm 16 m PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR : NO GAMBAR : TANGGAL :
A3
KONSULTAN :ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD
KAB. CIANJUR
SKALA
UKURAN
PT. THREE-SIX WORLD