• Tidak ada hasil yang ditemukan

LOKASI PT. THREE-SIX WORLD

N/A
N/A
Protected

Academic year: 2021

Membagikan "LOKASI PT. THREE-SIX WORLD"

Copied!
8
0
0

Teks penuh

(1)

X = 748810.00 Y = 9247520.00 X = 749310.00 X = 749810.00 X = 750310.00 X = 750810.00 X = 751310.00 X = 751560.00 Y = 9247020.00 Y = 9246520.00 Y = 9246020.00 X = 751504.441 Y = 9246918.445

T.1

X = 749959.000 Y = 9246437.000

T.3

X = 748697.250 Y = 9246275.612

T.4

LOKASI

PT. THREE-SIX WORLD

X = 749060.00 X = 749560.00 X = 750060.00 X = 750560.00 X = 751060.00 Y = 9245770.00 Y = 9246770.00 Y = 9247270.00 0 000 0 100 0 200 0 300 0 400 0 500 0 600 0 700 0 800 0 900 1 000 1 100 1 200 1 300 1 400 1 500 1 600 1 700 1 800 1 900 2 000 2 100 2 200 2 300 2 400 2 500 2 600 2 700 2 800 2 900 2 925 Sawah Sawah Sawah Pemukiman Warga Pemukiman Warga Sawah Sawah Sawah Sawah Pemukiman Warga Pemukiman Warga Pemukiman Warga Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong X = 750005.000 Y = 9246444.000

T.2

KE BANDUNG KE CIANJUR

LAND USE

SCALE 1 : 10000 0 0 2 200 4 cm 400 m

B

T

S

U

JALAN

SAWAH / TANAH KOSONG RUMAH WARGA

UKURAN DALAM SATUAN METER (m) R

R R

PEMBANGUN :

JUDUL PROYEK :

JUDUL GAMBAR :

ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD

KAB. CIANJUR PT. THREE-SIX WORLD

(2)

X = 750005.000 Y = 9246444.000

T.2

X = 749959.000 Y = 9246437.000

T.3

LOKASI

PT. THREE-SIX WORLD

R Tanah Kosong Sawah Sawah R R R R R R R R R R R R R Tanah Kosong R R Y = 9246400.00 Y = 9246300.00 Y = 9246200.00 Y = 9246450.00 Y = 9246350.00 Y = 9246250.00 Y = 9246150.00 Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong 12.81 R Batas Pabrik Sawah Sawah Sawah Sawah Sawah KE BANDUNG KE CIANJUR 8.00 8.00

LAYOUT EKSITING

002 1 : 1500 JALAN

SAWAH / TANAH KOSONG RUMAH WARGA

UKURAN DALAM SATUAN METER (m)

SCALE 1 : 1500 0 0 2 30 4 cm 60 m

B

T

S

U

R R R KETERANGAN PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR : NO GAMBAR : TANGGAL :

A3

KONSULTAN :

ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD

KAB. CIANJUR

SKALA

UKURAN

PT. THREE-SIX WORLD

(3)

X = 750005.000 Y = 9246444.000

T.2

X = 749959.000 Y = 9246437.000

T.3

R Sawah Sawah R R R R R R R R R R R R R Tanah Kosong R R Y = 9246400.00 Y = 9246300.00 Y = 9246200.00 Y = 9246450.00 Y = 9246350.00 Y = 9246250.00 Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong R Sawah Sawah Sawah Sawah Sawah KE BANDUNG KE CIANJUR 8.00 8.00 9.14 20.62 49.12 55.60 12.81 45.05 16.81 AREA PARKIR 123.58 34.43 188.45 63.52 TANGKI R.GENSET AREA PARKIR SEC 51.00 CUTTING GUDANG PRODUKSI LOCKER LOBBY TOILET KANTIN MEKANIK BOILER 30.00 T.SAMPAH SEC 6.10 DRIVER LOADING CONTAINER

SITE PLAN

SCALE 1 : 1500 0 0 2 30 4 cm 60 m

B

T

S

U

PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR :

ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD KAB. CIANJUR PT. THREE-SIX WORLD LUAS : 19,605 M2 PANJANG TEMBOK : 875 M' LUAS PAVING = 5,558.9 M2 LUAS PERKERASAN = 3,085.6 M2 LUAS TAMAN = 4,043.8 M2 LUAS BANGUNAN = 5,853.2 M2 LUAS TANAH KOSONG = 1,063.5 M2

(4)

Tanah Kosong Sawah Sawah Tanah Kosong Y = 9246400.00 Y = 9246300.00 Y = 9246200.00 Y = 9246450.00 Y = 9246350.00 Y = 9246250.00 Y = 9246150.00 Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong Sawah Sawah Sawah Sawah Sawah R7.20 KE BANDUNG KE CIANJUR 8.00 8.00 12.75 27.30 LOADING CONTAINER 9.14 20.62 49.12 55.60 45.05 16.81 43.43 33.02 AREA PARKIR 57.95 123.58 188.45 60.21 TANGKI R.GENSET AREA PARKIR 108.10 14.00 51.00 CUTTING FINISHING GUDANG PRODUKSI PACKING LOCKER LOBBY R. SERBAGUNA TOILET KANTIN MEKANIK BOILER 30.00 T.SAMPAH SEC 6.10 WORKSHOP T. AIR DRIVER LOADING CONTAINER LOADING TRUK R7.20

REKOMENDASI

SITE PLAN

004 1 : 1500 SCALE 1 : 1500 0 0 2 30 4 cm 60 m

B

T

S

U

KETERANGAN PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR : NO GAMBAR : TANGGAL :

A3

KONSULTAN :

ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD

KAB. CIANJUR

SKALA

UKURAN

PT. THREE-SIX WORLD

(5)

Sawah Sawah Tanah Kosong Y = 9246400.00 Y = 9246300.00 Y = 9246200.00 Y = 9246450.00 Y = 9246350.00 Y = 9246250.00 Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong Sawah Sawah Sawah Sawah Sawah KE BANDUNG KE CIANJUR 8.00 8.00 LOADING CONTAINER AREA PARKIR TANGKI R.GENSET AREA PARKIR CUTTING GUDANG PRODUKSI LOCKER LOBBY TOILET KANTIN MEKANIK BOILER T.SAMPAH SEC DRIVER

REKOMENDASI

RAMBU SAAT KONSTRUKSI

SCALE 1 : 1500 0 0 2 30 4 cm 60 m

B

T

S

U

PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR :

ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD KAB. CIANJUR PT. THREE-SIX WORLD

Rotary Lamp

HATI-HATI !!! ADA PEMBANGUNAN PABRIK

Rotary Lamp

HATI-HATI !!! ADA PEMBANGUNAN PABRIK

(6)

Tanah Kosong Sawah Sawah Tanah Kosong Y = 9246400.00 Y = 9246300.00 Y = 9246200.00 Y = 9246450.00 Y = 9246350.00 Y = 9246250.00 Y = 9246150.00 Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong Sawah Sawah Sawah Sawah Sawah KE BANDUNG KE CIANJUR 8.00 8.00 LOADING CONTAINER AREA PARKIR TANGKI R.GENSET AREA PARKIR CUTTING FINISHING GUDANG PRODUKSI PACKING LOCKER LOBBY R. SERBAGUNA TOILET KANTIN MEKANIK BOILER T.SAMPAH SEC WORKSHOP T. AIR DRIVER LOADING CONTAINER LOADING TRUK

ALUR SIRKULASI KENDARAAN DAN

SIRKULASI PEJALAN KAKI

006 1 : 1500 SCALE 1 : 1500 0 0 2 30 4 cm 60 m

B

T

S

U

KETERANGAN PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR : NO GAMBAR : TANGGAL :

A3

KONSULTAN :

ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD

KAB. CIANJUR

SKALA

UKURAN

PT. THREE-SIX WORLD

PT. BINA INSAN MANDIRI ALUR SIRKULASI PEJALAN KAKI ALUR SIRKULASI KENDARAAN

(7)

Sawah Sawah Tanah Kosong Y = 9246400.00 Y = 9246300.00 Y = 9246200.00 Y = 9246450.00 Y = 9246350.00 Y = 9246250.00 Tanah Kosong Tanah Kosong Tanah Kosong Tanah Kosong Sawah Sawah Sawah Sawah Sawah KE BANDUNG KE CIANJUR 8.00 8.00 LOADING CONTAINER AREA PARKIR TANGKI R.GENSET AREA PARKIR CUTTING GUDANG PRODUKSI LOCKER LOBBY TOILET KANTIN MEKANIK BOILER T.SAMPAH SEC DRIVER

REKOMENDASI

RAMBU INTERNAL

SCALE 1 : 1500 0 0 2 30 4 cm 60 m

B

T

S

U

PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR :

ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD

KAB. CIANJUR PT. THREE-SIX WORLD

(8)

KE BANDUNG KE CIANJUR 8.00 5.00 4.20 27.30 12.75 8.50 8.35 R7.20 R7.20 12.85 8.00 3.85 5.78

REKOMENDASI

DETAIL BUKAAN ENTRANCE

008 1 : 400 SCALE 1 : 400 0 0 2 8 4 cm 16 m PEMBANGUN : JUDUL PROYEK : JUDUL GAMBAR : NO GAMBAR : TANGGAL :

A3

KONSULTAN :

ANALISA DAMPAK LALU LINTAS PT. THREE-SIX WORLD

KAB. CIANJUR

SKALA

UKURAN

PT. THREE-SIX WORLD

Referensi

Dokumen terkait