PE RUSAHAAN DAE RAH AIR MINUM KOT A MAL ANG

REKAPITULASI RENCANA ANGGARAN BIAYA

NOMOR : RAB/201905/0093

PEKERJAAN : REHAB JARINGAN PIPA DISTRIBUSI PE100-PN 12,5/ GP-MS SEPANJANG 2.510 METER L O K A S I : JL. YOS SUDARSO - JL. TANIMBAR DAN SEKITARNYA

KEC. KLOJEN KOTA MALANG

No. URAIAN PEKERJAAN JUMLAH

1 2 3

I. PEKERJAAN PERSIAPAN : Rp. 1,207,379.69

II. PEKERJAAN TANAH : Rp. 39,054,671.05

III. PEKERJAAN PASANGAN : Rp. 120,024.97

IV. PEKERJAAN PENGEMBALIAN JALAN : Rp. 116,160,531.70

V. PEKERJAAN PIPA 1. BAHAN a. PIPA Rp. 291,953,467.00 b. AKSESORIS JARINGAN Rp. 63,010,330.80 2. UPAH a. PEMASANGAN PIPA Rp. 15,562,784.64

b. BIAYA PEMASANGAN AKSESORIS Rp. 7,278,599.20

c. BIAYA PENGEBORAN Rp. 38,970,391.92

d. BIAYA TAPING Rp. 1,974,120.34

VI. PEMBERSIHAN LOKASI DAN PEMBUANGAN BEKAS GALIAN : Rp. 542,737.86

Jumlah Rp. 575,835,039.18

PPn 10% Rp. 57,583,503.92

Jumlah Total Rp. 633,418,543.09 Dibulatkan Rp. 633,419,000.00 Terbilang : Enam ratus tiga puluh tiga juta empat ratus sembilan belas ribu rupiah

Keterangan :

- Biaya tersebut diatas berdasarkan analisa SNI

Malang, 11 June 2019 dibuat oleh, Manajer Perencanaan Teknik

Hendrik Ribowo, ST NPP. 06090593

Mengetahui,

Direktur Administrasi dan Keuangan

Moch. Syaifudin Zuhri, SE,MM

Mengetahui, Direktur Teknik

Ir. Ari Mukti, MT

Disetujui, Untuk Dilaksanakan

Direktur Utama

(2)

PE RUSAHAAN DAE RAH AIR MINUM KOT A MAL ANG

RENCANA ANGGARAN BIAYA

PEKERJAAN : REHAB JARINGAN PIPA DISTRIBUSI PE100-PN 12,5/ GP-MS SEPANJANG 2.510 METER L O K A S I : JL. YOS SUDARSO - JL. TANIMBAR DAN SEKITARNYA

KEC. KLOJEN KOTA MALANG

No. URAIAN PEKERJAAN SATUAN VOLUME ANALISA

HARGA (Rp) SATUAN JUMLAH HARGA SATUAN JUMLAH HARGA SELURUH 1 2 3 4 5 6 7 8 I. PEKERJAAN PERSIAPAN

Pengukuran Pipa u/ MC 0 km 2.51 : A.19 481,027.76 1,207,379.69

1,207,379.69

II. PEKERJAAN TANAH

Galian Tanah Keras m3 44.66 : B.04 SP 64,072.00 2,861,263.30 Galian Tanah Biasa m3 267.94 : B.01 SP 48,150.00 12,901,407.30 Urugan Kembali + Pemadatan Tanah m3 299.70 : B.10 + B.11 77,716.60 23,292,000.45

39,054,671.05

III. PEKERJAAN PASANGAN

Pembuatan Thrustblock m3 0.10 : G.07 1,179,979.76 120,024.97

IV. PEKERJAAN PENGEMBALIAN JALAN

Aspal m2 606.19 : S.12-F + S.08.SP 182,833.78 110,832,923.09 Rabat m3 4.52 : G.07 1,179,979.76 5,327,608.61 116,160,531.70 V. PEKERJAAN PIPA 1. BAHAN a. PIPA HDPE 0.50 m 268.00 762 7,107.00 1,904,676.00 HDPE 2 m 676.00 772 64,446.00 43,565,496.00 HDPE 3 m 914.00 776 131,249.50 119,962,043.00 HDPE 4 m 652.00 778 194,051.00 126,521,252.00 291,953,467.00 b. AKSESORIS JARINGAN 1. DETAIL 2

MUR BAUT 5/8'' X 4" buah 16.00 375 7,187.40 114,998.40

2. DETAIL 3

EQUAL TEE 110 X 110 MM 4'' X 4'' buah 1.00 876 2,214,923.00 2,214,923.00

3. DETAIL 4

EQUAL TEE 90 X90 MM 3'' X 3'' buah 1.00 875 973,567.00 973,567.00

4. DETAIL 5

END CUP 110 4' buah 1.00 951 1,497,185.00 1,497,185.00

5. DETAIL 6

UNIVERSAL COUPLING CI 2" buah 1.00 665 673,970.00 673,970.00 REDUCING TEE 110X63 MM 4'' X 2'' buah 2.00 891 3,031,975.00 6,063,950.00

6. DETAIL 7

UNIVERSAL COUPLING CI 2" buah 1.00 665 673,970.00 673,970.00

7. DETAIL 8

REDUCING TEE 110X63 MM 4'' X 2'' buah 2.00 891 3,031,975.00 6,063,950.00

8. DETAIL 9

REDUCING TEE 110X90 MM 4'' X 3'' buah 1.00 892 3,031,975.00 3,031,975.00

9. DETAIL 10

END CUP 90 3 " buah 3.00 1331 317,457.00 952,371.00

10. DETAIL 11

EQUAL TEE 63 X63 MM 2'' X 2'' buah 4.00 873 318,538.50 1,274,154.00

11. DETAIL 12

END CUP 63 2'' buah 2.00 948 104,328.00 208,656.00

12. DETAIL 14

TOPI PELINDUNG (SAFETY HELMET) bh 1.00 SM. 014 115,500.00 115,500.00

13. PINDAH ZADDLE Ø 4"

DOUBLE NEPEL 1/2" buah 36.00 256 5,175.00 186,300.00 ZADEL KLEM DCI 4 X 1/2" stel 36.00 615 155,595.00 5,601,420.00 FEMALE THREAD ELBOW 20 X 1/2" 1/2'' X 1/2" buah 36.00 856 32,510.50 1,170,378.00 SHOCK GALVANIS DIA 1/2 " bh 36.00 M384 6,758.00 243,288.00

14. PINDAH ZADDLE Ø 3"

DOUBLE NEPEL 1/2" buah 128.00 256 5,175.00 662,400.00 ZADEL KLEM DCI 3 X 1/2" stel 128.00 614 124,380.55 15,920,710.40 FEMALE THREAD ELBOW 20 X 1/2" 1/2'' X 1/2" buah 128.00 856 32,510.50 4,161,344.00

(3)

SHOCK GALVANIS DIA 1/2 " bh 128.00 M384 6,758.00 865,024.00

15. PINDAH ZADDLE Ø 2"

DOUBLE NEPEL 1/2" buah 97.00 256 5,175.00 501,975.00 ZADEL KLEM DCI 2 X 1/2" stel 97.00 609 62,157.50 6,029,277.50 FEMALE THREAD ELBOW 20 X 1/2" 1/2'' X 1/2" buah 97.00 856 32,510.50 3,153,518.50 SHOCK GALVANIS DIA 1/2 " bh 97.00 M384 6,758.00 655,526.00

63,010,330.80 2. UPAH a. PEMASANGAN PIPA HDPE 0.50 m 268.00 R.21 2,935.20 786,633.60 HDPE 2 m 676.00 R.24 5,781.60 3,908,361.60 HDPE 3 m 914.00 R.25 6,939.84 6,343,013.76 HDPE 4 m 652.00 R.26 6,939.84 4,524,775.68 15,562,784.64 b. UPAH DETAIL 3

EQUAL TEE 110 X 110 MM 4'' X 4'' buah 1.00 : R.133 27,594.00 27,594.00

c. UPAH DETAIL 4

EQUAL TEE 90 X90 MM 3'' X 3'' buah 1.00 : R.132 27,594.00 27,594.00

d. UPAH DETAIL 5

END CUP 110 4' buah 1.00 : R.151 7,633.00 7,633.00

e. UPAH DETAIL 6

UNIVERSAL COUPLING CI 2" buah 1.00 : R.79 26,215.00 26,215.00 REDUCING TEE 110X63 MM 4'' X 2'' buah 2.00 : R.133 27,594.00 55,188.00

f. UPAH DETAIL 7

UNIVERSAL COUPLING CI 2" buah 1.00 : R.79 26,215.00 26,215.00

g. UPAH DETAIL 8

REDUCING TEE 110X63 MM 4'' X 2'' buah 2.00 : R.133 27,594.00 55,188.00

h. UPAH DETAIL 9

REDUCING TEE 110X90 MM 4'' X 3'' buah 1.00 : R.133 27,594.00 27,594.00

i. UPAH DETAIL 11

EQUAL TEE 63 X63 MM 2'' X 2'' buah 4.00 : R.131 23,303.00 93,212.00

j. UPAH DETAIL 12

END CUP 63 2'' buah 2.00 : R.149 7,633.00 15,266.00

k. UPAH PENYAMBUNGAN PIPA HDPE Ø 3"

PENYAMBUNGAN PIPA HDPE 3" (BUTTFUSION) 3'' buah 9.00 : R.47 44,726.05 402,534.45

l. UPAH PENYAMBUNGAN PIPA HDPE Ø 2"

PENYAMBUNGAN PIPA HDPE 2" (BUTTFUSION) 2'' buah 6.00 : R.46.SP 33,994.05 203,964.30

m. UPAH PENYAMBUNGAN PIPA HDPE Ø 4"

PENYAMBUNGAN PIPA HDPE 4" (BUTTFUSION) 4'' buah 13.00 : R.48 66,190.05 860,470.65

n. UPAH PINDAH ZADDLE Ø 4"

DOUBLE NEPEL 1/2" buah 36.00 : R.244 1,120.00 40,320.00 ZADEL KLEM DCI 4 X 1/2" stel 36.00 : R.114 25,220.10 907,923.60

o. UPAH PINDAH ZADDLE Ø 3"

DOUBLE NEPEL 1/2" buah 128.00 : R.244 1,120.00 143,360.00 ZADEL KLEM DCI 3 X 1/2" stel 128.00 : R.113 22,057.20 2,823,321.60

p. UPAH PINDAH ZADDLE Ø 2"

DOUBLE NEPEL 1/2" buah 97.00 : R.244 1,120.00 108,640.00 ZADEL KLEM DCI 2 X 1/2" stel 97.00 : R.112 14,704.80 1,426,365.60

7,278,599.20 q. BIAYA PENGEBORAN HDPE 0.50 m 8.00 : B.18.B 41,076.49 328,611.92 HDPE 2 m 22.00 : B.18 164,305.00 3,614,710.00 HDPE 3 m 12.00 : B.19 209,235.00 2,510,820.00 HDPE 4 m 115.00 : B.20 282,750.00 32,516,250.00 38,970,391.92 r. BIAYA TAPING PVC 3 titik 1.00 : R.36 269,076.69 269,076.69 PVC 2 titik 6.00 : R.35 224,943.09 1,349,658.52 PVC 4 titik 1.00 : R.37 355,385.14 355,385.14 1,974,120.34

VI. PEMBERSIHAN LOKASI DAN PEMBUANGAN BEKAS GALIAN m3 12.89 : B.09 SP 42,090.00 542,737.86

(4)

PE RUSAHAAN DAE RAH AIR MINUM KOT A MAL ANG

VOLUME PEKERJAAN

PEKERJAAN : REHAB JARINGAN PIPA DISTRIBUSI PE100-PN 12,5/ GP-MS SEPANJANG 2.510 METER L O K A S I : JL. YOS SUDARSO - JL. TANIMBAR DAN SEKITARNYA KEC. KLOJEN KOTA MALANG

No. JENIS PEKERJAAN PERHITUNGAN VOLUME

1 Galian Tanah Keras Galian PIPA

(ASPAL) HDPE 2 0.10000 x 0.20000 x 439.00000 m = 8.78000 m3 (RABAT) HDPE 2 0.10000 x 0.20000 x 215.00000 m = 4.30000 m3 (ASPAL) HDPE 3 0.10000 x 0.20000 x 902.00000 m = 18.04000 m3 (ASPAL) HDPE 4 0.10000 x 0.25000 x 537.00000 m = 13.42500 m3 44.54500 m3 Titik TAPING (ASPAL) PVC 3 0.10000 x 0.40000 x 0.40000 x 1 titik = 0.01600 m3 (ASPAL) PVC 2 0.10000 x 0.40000 x 0.40000 x 6 titik = 0.09600 m3 (ASPAL) PVC 4 0.00000 x 0.00000 x 0.00000 x 1 titik = 0.00000 m3 0.11200 m3

Total Galian Tanah Keras = 44.65700 m3

2 Galian Tanah Biasa Galian PIPA

(ASPAL) HDPE 2 0.60000 x 0.20000 x 439.00000 = 52.68000 m3 (RABAT) HDPE 2 0.60000 x 0.20000 x 215.00000 = 25.80000 m3 (ASPAL) HDPE 3 0.60000 x 0.20000 x 902.00000 = 108.24000 m3 (ASPAL) HDPE 4 0.60000 x 0.25000 x 537.00000 = 80.55000 m3 267.27000 m3 Titik TAPING (ASPAL) PVC 3 0.60000 x 0.40000 x 0.40000 x 1 titik = 0.09600 m3 (ASPAL) PVC 2 0.60000 x 0.40000 x 0.40000 x 6 titik = 0.57600 m3 (ASPAL) PVC 4 0.00000 x 0.00000 x 0.00000 x 1 titik = 0.00000 m3 0.67200 m3

Total Galian Tanah Biasa = 267.94200 m3

3 Urugan Tanah Kembali + Pemadatan Galian PIPA

(ASPAL) HDPE 2 ( ( 0.70000 x 0.20000 - ¼π x 0.063002 ) x 439.00000 ) = 60.09100 m3 (RABAT) HDPE 2 ( ( 0.70000 x 0.20000 - ¼π x 0.063002 ) x 215.00000 ) = 29.43000 m3 (ASPAL) HDPE 3 ( ( 0.70000 x 0.20000 - ¼π x 0.090002 ) x 902.00000 ) = 120.53900 m3 (ASPAL) HDPE 4 ( ( 0.70000 x 0.25000 - ¼π x 0.110002 ) x 537.00000 ) = 88.87000 m3 298.93000 m3 Titik TAPING (ASPAL) PVC 3 ( 0.70000 x 0.40000 - ¼π x 0.089002 ) x 0.40000 x 1 titik = 0.11000 m3 (ASPAL) PVC 2 ( 0.70000 x 0.40000 - ¼π x 0.060002 ) x 0.40000 x 6 titik = 0.66500 m3 (ASPAL) PVC 4 ( 0.00000 x 0.00000 - ¼π x 0.114002 ) x 0.00000 x 1 titik = 0.00000 m3 0.77500 m3

Total Urugan Kembali = 299.70400 m3

4 Buangan Tanah Galian Tanah Keras + Galian Tanah Biasa - Urugan Tanah Kembali =

44.65700 + 267.94200 - 299.70400 = 12.89500 m3

5 Pembuatan Thrust Block Tee / Valve / Dop

HDPE 4 ( ( (0.20000 x 0.36500) + (0.20000 x 0.32000) ) / 2 ) x 0.12500 x 1.00000 titik = 0.00900 m3 HDPE 3 ( ( (0.20000 x 0.24500) + (0.20000 x 0.28000) ) / 2 ) x 0.10000 x 1.00000 titik = 0.00500 m3 HDPE 4 ( ( (0.20000 x 0.36500) + (0.20000 x 0.32000) ) / 2 ) x 0.12500 x 1.00000 titik = 0.00900 m3 HDPE 4 ( ( (0.20000 x 0.36500) + (0.20000 x 0.32000) ) / 2 ) x 0.12500 x 2.00000 titik = 0.01700 m3 HDPE 4 ( ( (0.20000 x 0.36500) + (0.20000 x 0.32000) ) / 2 ) x 0.12500 x 2.00000 titik = 0.01700 m3 HDPE 4 ( ( (0.20000 x 0.36500) + (0.20000 x 0.32000) ) / 2 ) x 0.12500 x 1.00000 titik = 0.00900 m3 HDPE 3 ( ( (0.20000 x 0.24500) + (0.20000 x 0.28000) ) / 2 ) x 0.10000 x 3.00000 titik = 0.01600 m3 HDPE 2 ( ( (0.20000 x 0.12000) + (0.20000 x 0.22600) ) / 2 ) x 0.10000 x 4.00000 titik = 0.01400 m3 HDPE 2 ( ( (0.20000 x 0.12000) + (0.20000 x 0.22600) ) / 2 ) x 0.10000 x 2.00000 titik = 0.00700 m3 0.10200 m3

6 Rekondisi Jalan Aspal Galian PIPA

HDPE 2 0.30000 x 439.00000 m = 131.70000 m2 HDPE 3 0.30000 x 902.00000 m = 270.60000 m2 HDPE 4 0.37500 x 537.00000 m = 201.37500 m2

(5)

603.67500 m2 Titik TAPING PVC 3 0.60000 x 0.60000 x 1 titik = 0.36000 m2 PVC 2 0.60000 x 0.60000 x 6 titik = 2.16000 m2 PVC 4 0.00000 x 0.00000 x 1 titik = 0.00000 m2 2.52000 m2

Total Rekondisi Jalan Aspal = 606.19500 m2

7 Rekondisi Jalan Macadam Titik TAPING

0.00000 m2

-8 Rekondisi Jalan Rabat Galian PIPA

HDPE 2 0.30000 x 215.00000 m x 0.07000 = 4.51500 m3

4.51500 m3

Total Rekondisi Jalan Rabat = 4.51500 m3

9 Pengeboran HDPE 0.50 8.00000 m

HDPE 2 22.00000 m

HDPE 3 12.00000 m

(6)

PE RUSAHAAN DAE RAH AIR MINUM KOT A MAL ANG

L17 L08 M409 M061 L17 L07 L02 L01 L17 L07 L02 L01 L17 L07 L02 L01 ANALISA PEKERJAAN

PEKERJAAN : REHAB JARINGAN PIPA DISTRIBUSI PE100-PN 12,5/ GP-MS SEPANJANG 2.510 METER L O K A S I : JL. YOS SUDARSO - JL. TANIMBAR DAN SEKITARNYA

KEC. KLOJEN KOTA MALANG

KODE ANALISA : A.19

JENIS PEKERJAAN : PENGUKURAN JARINGAN PIPA UNTUK MC 0

SATUAN PEMBAYARAN : KM1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 1.00000 61,000.00 61,000.00

2 TUKANG KAYU ORG/HR 0.33333 76,000.00 25,333.33

JUMLAH HARGA TENAGA 86,333.33

B BAHAN

1 CAT MENI KAYU KG 0.24000 48,796.00 11,711.04

2 USUK : 5/7 (KAYU MERANTI) M3 0.05400 7,092,285.00 382,983.39

JUMLAH HARGA BAHAN 394,694.43

C JUMLAH HARGA TENAGA DAN BAHAN ( A + B ) 481,027.76

KODE ANALISA : B.04 SP

JENIS PEKERJAAN : GALIAN TANAH KERAS SEDALAM 1 M

SATUAN PEMBAYARAN : M3

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 1.00000 61,000.00 61,000.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.03200 96,000.00 3,072.00

JUMLAH HARGA TENAGA 64,072.00

B JUMLAH HARGA TENAGA ( A ) 64,072.00

KODE ANALISA : B.01 SP

JENIS PEKERJAAN : GALIAN TANAH BIASA SEDALAM 1 M

SATUAN PEMBAYARAN : M3

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.75000 61,000.00 45,750.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.02500 96,000.00 2,400.00

JUMLAH HARGA TENAGA 48,150.00

B JUMLAH HARGA TENAGA ( A ) 48,150.00

KODE ANALISA : B.10

JENIS PEKERJAAN : URUGAN KEMBALI

SATUAN PEMBAYARAN : M3

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.49250 61,000.00 30,042.50

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.02083 96,000.00 2,000.00

JUMLAH HARGA TENAGA 32,042.50

(7)

L17 L07 L02 L01 E64 L17 L07 L02 L01 E85 L17 L07 L02 L01 M037 M004 M019 M486 KODE ANALISA : B.11

JENIS PEKERJAAN : PEMADATAN TANAH DENGAN MESIN PEMADAT TUMBUK (PER 20 CM)

SATUAN PEMBAYARAN : M3

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.50000 61,000.00 30,500.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.05000 96,000.00 4,800.00

JUMLAH HARGA TENAGA 35,300.00

B PERLENGKAPAN

1 SEWA TAMPING RAMMER HARI 0.02282 454,620.00 10,374.10

JUMLAH HARGA PERLENGKAPAN 10,374.10

C JUMLAH HARGA TENAGA DAN BAHAN ( A + B ) 45,674.10

KODE ANALISA : B.09 SP

JENIS PEKERJAAN : PEMBUANGAN TANAH DENGAN MOBILISASI

SATUAN PEMBAYARAN : M3

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.33000 61,000.00 20,130.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.01000 96,000.00 960.00

JUMLAH HARGA TENAGA 21,090.00

B PERLENGKAPAN

1 MOBILISASI BUANGAN TANAH M3 1.00000 21,000.00 21,000.00

JUMLAH HARGA PERLENGKAPAN 21,000.00

C JUMLAH HARGA TENAGA DAN BAHAN ( A + B ) 42,090.00

KODE ANALISA : G.07

JENIS PEKERJAAN : BETON MUTU FC=19,3 MPA (K225) SLUMP (12 +- 2) CM, W/C = 0,58

SATUAN PEMBAYARAN : M3

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 1.65000 61,000.00 100,650.00

2 TUKANG BATU ORG/HR 0.27500 76,000.00 20,900.00

3 KEPALA TUKANG BATU ORG/HR 0.02800 90,000.00 2,520.00

4 MANDOR ORG/HR 0.08300 96,000.00 7,968.00

JUMLAH HARGA TENAGA 132,038.00

B BAHAN

1 PORTLAND CEMENT (PC) KG 371.00000 1,926.00 714,546.00

2 PASIR COR M3 0.49857 206,267.00 102,838.83

3 BATU PECAH MESIN 2/3 M3 0.77556 285,082.00 221,096.93

4 AIR BERSIH LTR 215.00000 44.00 9,460.00

JUMLAH HARGA BAHAN 1,047,941.76

(8)

L17 L01 M001 M016 M014 E64 E87 L17 L01 M021 M003 M498 M487. A M487 E64 E87 L17 L12 L06A L01 KODE ANALISA : S.12-F

JENIS PEKERJAAN : WATERBOUND MACADAM UTK. PEK. MINOR ( TEBAL 12 CM )

SATUAN PEMBAYARAN : M2

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.08889 61,000.00 5,422.22

2 MANDOR ORG/HR 0.02222 96,000.00 2,133.33

JUMLAH HARGA TENAGA 7,555.56

B BAHAN

1 PASIR URUG M3 0.05000 126,788.00 6,339.40

2 STENSLAH/BATU PECAH TANGAN 4/6 - 5/7 M3 0.05000 205,050.00 10,252.50

3 STENSLAH/BATU PECAH TANGAN 2/3 M3 0.02000 287,503.00 5,750.06

JUMLAH HARGA BAHAN 22,341.96

C PERLENGKAPAN

1 SEWA TAMPING RAMMER HARI 0.02860 454,620.00 13,000.00

2 ALAT BANTU (1 SET; 3 ALAT) M2 1.00000 6,000.00 6,000.00

JUMLAH HARGA PERLENGKAPAN 19,000.00

D JUMLAH HARGA TENAGA DAN BAHAN DAN PERLENGKAPAN ( A + B + C ) 48,897.52

KODE ANALISA : S. 08.SP

JENIS PEKERJAAN : ASPAL GORENG MANUAL (TEBAL 5 CM)

SATUAN PEMBAYARAN : M2

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.00310 61,000.00 189.10

2 MANDOR ORG/HR 0.00060 96,000.00 57.60

JUMLAH HARGA TENAGA 246.70

B BAHAN

1 BATU PECAH MESIN 4/6 - 5/7 M3 0.03030 238,167.00 7,216.46

2 PASIR HITAM M3 0.01980 199,103.00 3,942.24

3 KAYU BAKAR M3 0.10000 90,000.00 9,000.00

4 ASPAL PENGIKAT KG 0.20000 13,871.00 2,774.20

5 ASPAL KG 6.61500 13,871.00 91,756.67

JUMLAH HARGA BAHAN 114,689.56

C PERLENGKAPAN

1 SEWA TAMPING RAMMER HARI 0.02860 454,620.00 13,000.00

2 ALAT BANTU (1 SET; 3 ALAT) M2 1.00000 6,000.00 6,000.00

JUMLAH HARGA PERLENGKAPAN 19,000.00

D JUMLAH HARGA TENAGA DAN BAHAN DAN PERLENGKAPAN ( A + B + C ) 133,936.26

KODE ANALISA : R.21

JENIS PEKERJAAN : PEMASANGAN PIPA HDPE DIAMETER 1/2"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.01080 61,000.00 658.80

2 TUKANG PIPA ORG/HR 0.02400 80,000.00 1,920.00

3 KEPALA TUKANG PIPA ORG/HR 0.00300 90,000.00 270.00

4 MANDOR ORG/HR 0.00090 96,000.00 86.40

JUMLAH HARGA TENAGA 2,935.20

(9)

L17 L07 L02 L01 L17 L12 L06A L01 L17 L07 L02 L01 L17 L12 L06A L01 KODE ANALISA : B.18.B

JENIS PEKERJAAN : BOR CROSSING JALAN DIAMETER 1/2"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.53125 61,000.00 32,406.25

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.09032 96,000.00 8,670.24

JUMLAH HARGA TENAGA 41,076.49

B JUMLAH HARGA TENAGA ( A ) 41,076.49

KODE ANALISA : R.24

JENIS PEKERJAAN : PEMASANGAN PIPA HDPE DIAMETER 2"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.02700 61,000.00 1,647.00

2 TUKANG PIPA ORG/HR 0.04500 80,000.00 3,600.00

3 KEPALA TUKANG PIPA ORG/HR 0.00450 90,000.00 405.00

4 MANDOR ORG/HR 0.00135 96,000.00 129.60

JUMLAH HARGA TENAGA 5,781.60

B JUMLAH HARGA TENAGA ( A ) 5,781.60

KODE ANALISA : B.18

JENIS PEKERJAAN : BOR CROSSING JALAN DIAMETER 2"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 2.12500 61,000.00 129,625.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.36125 96,000.00 34,680.00

JUMLAH HARGA TENAGA 164,305.00

B JUMLAH HARGA TENAGA ( A ) 164,305.00

KODE ANALISA : R.25

JENIS PEKERJAAN : PEMASANGAN PIPA HDPE DIAMETER 3"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.03240 61,000.00 1,976.40

2 TUKANG PIPA ORG/HR 0.05400 80,000.00 4,320.00

3 KEPALA TUKANG PIPA ORG/HR 0.00540 90,000.00 486.00

4 MANDOR ORG/HR 0.00164 96,000.00 157.44

JUMLAH HARGA TENAGA 6,939.84

(10)

L17 L07 L02 L01 L17 L12 L06A L01 L17 L07 L02 L01 L17 L12 L06A L01 E03 E19 E24 KODE ANALISA : B.19

JENIS PEKERJAAN : BOR CROSSING JALAN DIAMETER 3"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 2.77500 61,000.00 169,275.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.41625 96,000.00 39,960.00

JUMLAH HARGA TENAGA 209,235.00

B JUMLAH HARGA TENAGA ( A ) 209,235.00

KODE ANALISA : R.26

JENIS PEKERJAAN : PEMASANGAN PIPA HDPE DIAMETER 4"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.03240 61,000.00 1,976.40

2 TUKANG PIPA ORG/HR 0.05400 80,000.00 4,320.00

3 KEPALA TUKANG PIPA ORG/HR 0.00540 90,000.00 486.00

4 MANDOR ORG/HR 0.00164 96,000.00 157.44

JUMLAH HARGA TENAGA 6,939.84

B JUMLAH HARGA TENAGA ( A ) 6,939.84

KODE ANALISA : B.20

JENIS PEKERJAAN : BOR CROSSING JALAN DIAMETER 4"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 3.75000 61,000.00 228,750.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.56250 96,000.00 54,000.00

JUMLAH HARGA TENAGA 282,750.00

B JUMLAH HARGA TENAGA ( A ) 282,750.00

KODE ANALISA : R.36

JENIS PEKERJAAN : TAPPING PIPA DIAMETER 3"

SATUAN PEMBAYARAN : UNIT

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.64800 61,000.00 39,528.00

2 TUKANG PIPA ORG/HR 1.08000 80,000.00 86,400.00

3 KEPALA TUKANG PIPA ORG/HR 0.05400 90,000.00 4,860.00

4 MANDOR ORG/HR 0.01640 96,000.00 1,574.40

JUMLAH HARGA TENAGA 132,362.40

B PERLENGKAPAN

1 SEWA MESIN GENSET HARI 0.28571 330,000.00 94,285.71

2 SEWA ALAT BERAT KHUSUS SEWA WATER PUMP HARI 0.14286 165,000.00 23,571.43

3 SEWA JACK HAMMER HARI 0.14286 132,000.00 18,857.14

JUMLAH HARGA PERLENGKAPAN 136,714.29

(11)

L17 L12 L06A L01 E03 E19 E24 L17 L12 L06A L01 E03 E19 E24 L12 L17 L12 L06A L01 KODE ANALISA : R.35

JENIS PEKERJAAN : TAPPING PIPA DIAMETER 2"

SATUAN PEMBAYARAN : UNIT

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.43200 61,000.00 26,352.00

2 TUKANG PIPA ORG/HR 0.72000 80,000.00 57,600.00

3 KEPALA TUKANG PIPA ORG/HR 0.03600 90,000.00 3,240.00

4 MANDOR ORG/HR 0.01080 96,000.00 1,036.80

JUMLAH HARGA TENAGA 88,228.80

B PERLENGKAPAN

1 SEWA MESIN GENSET HARI 0.28571 330,000.00 94,285.71

2 SEWA ALAT BERAT KHUSUS SEWA WATER PUMP HARI 0.14286 165,000.00 23,571.43

3 SEWA JACK HAMMER HARI 0.14286 132,000.00 18,857.14

JUMLAH HARGA PERLENGKAPAN 136,714.29

C JUMLAH HARGA TENAGA DAN BAHAN ( A + B ) 224,943.09

KODE ANALISA : R.37

JENIS PEKERJAAN : TAPPING PIPA DIAMETER 4"

SATUAN PEMBAYARAN : UNIT

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.81000 61,000.00 49,410.00

2 TUKANG PIPA ORG/HR 1.35000 80,000.00 108,000.00

3 KEPALA TUKANG PIPA ORG/HR 0.13500 90,000.00 12,150.00

4 MANDOR ORG/HR 0.02050 96,000.00 1,968.00

JUMLAH HARGA TENAGA 171,528.00

B PERLENGKAPAN

1 SEWA MESIN GENSET HARI 0.42857 330,000.00 141,428.57

2 SEWA ALAT BERAT KHUSUS SEWA WATER PUMP HARI 0.14286 165,000.00 23,571.43

3 SEWA JACK HAMMER HARI 0.14286 132,000.00 18,857.14

JUMLAH HARGA PERLENGKAPAN 183,857.14

C JUMLAH HARGA TENAGA DAN BAHAN ( A + B ) 355,385.14

KODE ANALISA : R.244

JENIS PEKERJAAN : PEMASANGAN DOUBLE NEPEL GP O.1/2''

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 TUKANG PIPA ORG/HR 0.01400 80,000.00 1,120.00

JUMLAH HARGA TENAGA 1,120.00

B JUMLAH HARGA TENAGA ( A ) 1,120.00

KODE ANALISA : R.112

JENIS PEKERJAAN : PEMASANGAN ZADEL KLEM BESI DIAMETER 2"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.07200 61,000.00 4,392.00

2 TUKANG PIPA ORG/HR 0.12000 80,000.00 9,600.00

3 KEPALA TUKANG PIPA ORG/HR 0.00600 90,000.00 540.00

4 MANDOR ORG/HR 0.00180 96,000.00 172.80

JUMLAH HARGA TENAGA 14,704.80

(12)

L17 L12 L06A L01 L17 L12 L06A L01 L17 L12 L06A L01 L17 L12 L06A L01 KODE ANALISA : R.113

JENIS PEKERJAAN : PEMASANGAN ZADEL KLEM BESI DIAMETER 3"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.10800 61,000.00 6,588.00

2 TUKANG PIPA ORG/HR 0.18000 80,000.00 14,400.00

3 KEPALA TUKANG PIPA ORG/HR 0.00900 90,000.00 810.00

4 MANDOR ORG/HR 0.00270 96,000.00 259.20

JUMLAH HARGA TENAGA 22,057.20

B JUMLAH HARGA TENAGA ( A ) 22,057.20

KODE ANALISA : R.114

JENIS PEKERJAAN : PEMASANGAN ZADEL KLEM BESI DIAMETER 4"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.12150 61,000.00 7,411.50

2 TUKANG PIPA ORG/HR 0.20250 80,000.00 16,200.00

3 KEPALA TUKANG PIPA ORG/HR 0.01350 90,000.00 1,215.00

4 MANDOR ORG/HR 0.00410 96,000.00 393.60

JUMLAH HARGA TENAGA 25,220.10

B JUMLAH HARGA TENAGA ( A ) 25,220.10

KODE ANALISA : R.79

JENIS PEKERJAAN : PEMASANGAN UNIVERSAL COUPLING DIAMETER 2"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.16500 61,000.00 10,065.00

2 TUKANG PIPA ORG/HR 0.11000 80,000.00 8,800.00

3 KEPALA TUKANG PIPA ORG/HR 0.05500 90,000.00 4,950.00

4 MANDOR ORG/HR 0.02500 96,000.00 2,400.00

JUMLAH HARGA TENAGA 26,215.00

B JUMLAH HARGA TENAGA ( A ) 26,215.00

KODE ANALISA : R.131

JENIS PEKERJAAN : PEMASANGAN COMPRESSION TEE PIPA HDPE 2"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.17300 61,000.00 10,553.00

2 TUKANG PIPA ORG/HR 0.08700 80,000.00 6,960.00

3 KEPALA TUKANG PIPA ORG/HR 0.04300 90,000.00 3,870.00

4 MANDOR ORG/HR 0.02000 96,000.00 1,920.00

JUMLAH HARGA TENAGA 23,303.00

(13)

L17 L12 L06A L01 L17 L12 L06A L01 M483 M484 E26 E03 L17 L12 L06A L01 KODE ANALISA : R.149

JENIS PEKERJAAN : PEMASANGAN COMPRESSION END CUP PIPA HDPE 2"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.05600 61,000.00 3,416.00

2 TUKANG PIPA ORG/HR 0.02800 80,000.00 2,240.00

3 KEPALA TUKANG PIPA ORG/HR 0.01450 90,000.00 1,305.00

4 MANDOR ORG/HR 0.00700 96,000.00 672.00

JUMLAH HARGA TENAGA 7,633.00

B JUMLAH HARGA TENAGA ( A ) 7,633.00

KODE ANALISA : R.46.SP

JENIS PEKERJAAN : PENYAMBUNGAN PIPA HDPE DIAMETER 2" (BUTT FUSSION)

SATUAN PEMBAYARAN : BH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.06000 61,000.00 3,660.00

2 TUKANG PIPA ORG/HR 0.03000 80,000.00 2,400.00

3 KEPALA TUKANG PIPA ORG/HR 0.03000 90,000.00 2,700.00

4 MANDOR ORG/HR 0.01000 96,000.00 960.00

JUMLAH HARGA TENAGA 9,720.00

B BAHAN

1 SOLAR INDUSTRI LTR 0.30000 10,120.00 3,036.00

2 MINYAK PELUMAS LTR 0.01250 67,044.00 838.05

JUMLAH HARGA BAHAN 3,874.05

C PERLENGKAPAN

1 SEWA BUTT WELDING MACHINE KL 250 (63 - 250 ) HARI 0.03000 350,000.00 10,500.00

2 SEWA MESIN GENSET HARI 0.03000 330,000.00 9,900.00

JUMLAH HARGA PERLENGKAPAN 20,400.00

D JUMLAH HARGA TENAGA DAN BAHAN DAN PERLENGKAPAN ( A + B + C ) 33,994.05

KODE ANALISA : R.132

JENIS PEKERJAAN : PEMASANGAN COMPRESSION TEE PIPA HDPE 3"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.20400 61,000.00 12,444.00

2 TUKANG PIPA ORG/HR 0.10200 80,000.00 8,160.00

3 KEPALA TUKANG PIPA ORG/HR 0.05100 90,000.00 4,590.00

4 MANDOR ORG/HR 0.02500 96,000.00 2,400.00

JUMLAH HARGA TENAGA 27,594.00

(14)

L17 L12 L06A L01 M483 M484 E26 E03 L17 L12 L06A L01 L17 L12 L06A L01 KODE ANALISA : R.47

JENIS PEKERJAAN : PENYAMBUNGAN PIPA HDPE DIAMETER 3" (BUTT FUSSION)

SATUAN PEMBAYARAN : BH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.08000 61,000.00 4,880.00

2 TUKANG PIPA ORG/HR 0.04000 80,000.00 3,200.00

3 KEPALA TUKANG PIPA ORG/HR 0.04000 90,000.00 3,600.00

4 MANDOR ORG/HR 0.01000 96,000.00 960.00

JUMLAH HARGA TENAGA 12,640.00

B BAHAN

1 SOLAR INDUSTRI LTR 0.40000 10,120.00 4,048.00

2 MINYAK PELUMAS LTR 0.01250 67,044.00 838.05

JUMLAH HARGA BAHAN 4,886.05

C PERLENGKAPAN

1 SEWA BUTT WELDING MACHINE KL 250 (63 - 250 ) HARI 0.04000 350,000.00 14,000.00

2 SEWA MESIN GENSET HARI 0.04000 330,000.00 13,200.00

JUMLAH HARGA PERLENGKAPAN 27,200.00

D JUMLAH HARGA TENAGA DAN BAHAN DAN PERLENGKAPAN ( A + B + C ) 44,726.05

KODE ANALISA : R.133

JENIS PEKERJAAN : PEMASANGAN COMPRESSION TEE PIPA HDPE 4"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.20400 61,000.00 12,444.00

2 TUKANG PIPA ORG/HR 0.10200 80,000.00 8,160.00

3 KEPALA TUKANG PIPA ORG/HR 0.05100 90,000.00 4,590.00

4 MANDOR ORG/HR 0.02500 96,000.00 2,400.00

JUMLAH HARGA TENAGA 27,594.00

B JUMLAH HARGA TENAGA ( A ) 27,594.00

KODE ANALISA : R.151

JENIS PEKERJAAN : PEMASANGAN COMPRESSION END CUP PIPA HDPE 4"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.05600 61,000.00 3,416.00

2 TUKANG PIPA ORG/HR 0.02800 80,000.00 2,240.00

3 KEPALA TUKANG PIPA ORG/HR 0.01450 90,000.00 1,305.00

4 MANDOR ORG/HR 0.00700 96,000.00 672.00

JUMLAH HARGA TENAGA 7,633.00

(15)

L17 L12 L06A L01 M483 M484 E26 E03 KODE ANALISA : R.48

JENIS PEKERJAAN : PENYAMBUNGAN PIPA HDPE DIAMETER 4" (BUTT FUSSION)

SATUAN PEMBAYARAN : BH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.12000 61,000.00 7,320.00

2 TUKANG PIPA ORG/HR 0.06000 80,000.00 4,800.00

3 KEPALA TUKANG PIPA ORG/HR 0.06000 90,000.00 5,400.00

4 MANDOR ORG/HR 0.01000 96,000.00 960.00

JUMLAH HARGA TENAGA 18,480.00

B BAHAN

1 SOLAR INDUSTRI LTR 0.60000 10,120.00 6,072.00

2 MINYAK PELUMAS LTR 0.01250 67,044.00 838.05

JUMLAH HARGA BAHAN 6,910.05

C PERLENGKAPAN

1 SEWA BUTT WELDING MACHINE KL 250 (63 - 250 ) HARI 0.06000 350,000.00 21,000.00

2 SEWA MESIN GENSET HARI 0.06000 330,000.00 19,800.00

JUMLAH HARGA PERLENGKAPAN 40,800.00

(16)

PE RUSAHAAN DAE RAH AIR MINUM KOT A MAL ANG

L17 L08 M409 M061 L17 L07 L02 L01 L17 L07 L02 L01 L17 L07 L02 L01 ANALISA PEKERJAAN

PEKERJAAN : REHAB JARINGAN PIPA DISTRIBUSI PE100-PN 12,5/ GP-MS SEPANJANG 2.510 METER L O K A S I : JL. YOS SUDARSO - JL. TANIMBAR DAN SEKITARNYA

KEC. KLOJEN KOTA MALANG

KODE ANALISA : A.19

JENIS PEKERJAAN : PENGUKURAN JARINGAN PIPA UNTUK MC 0

SATUAN PEMBAYARAN : KM1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 1.00000 61,000.00 61,000.00

2 TUKANG KAYU ORG/HR 0.33333 76,000.00 25,333.33

JUMLAH HARGA TENAGA 86,333.33

B BAHAN

1 CAT MENI KAYU KG 0.24000 48,796.00 11,711.04

2 USUK : 5/7 (KAYU MERANTI) M3 0.05400 7,092,285.00 382,983.39

JUMLAH HARGA BAHAN 394,694.43

C JUMLAH HARGA TENAGA DAN BAHAN ( A + B ) 481,027.76

KODE ANALISA : B.04 SP

JENIS PEKERJAAN : GALIAN TANAH KERAS SEDALAM 1 M

SATUAN PEMBAYARAN : M3

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 1.00000 61,000.00 61,000.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.03200 96,000.00 3,072.00

JUMLAH HARGA TENAGA 64,072.00

B JUMLAH HARGA TENAGA ( A ) 64,072.00

KODE ANALISA : B.01 SP

JENIS PEKERJAAN : GALIAN TANAH BIASA SEDALAM 1 M

SATUAN PEMBAYARAN : M3

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.75000 61,000.00 45,750.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.02500 96,000.00 2,400.00

JUMLAH HARGA TENAGA 48,150.00

B JUMLAH HARGA TENAGA ( A ) 48,150.00

KODE ANALISA : B.10

JENIS PEKERJAAN : URUGAN KEMBALI

SATUAN PEMBAYARAN : M3

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.49250 61,000.00 30,042.50

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.02083 96,000.00 2,000.00

JUMLAH HARGA TENAGA 32,042.50

(17)

L17 L07 L02 L01 E64 L17 L07 L02 L01 E85 L17 L07 L02 L01 M037 M004 M019 M486 KODE ANALISA : B.11

JENIS PEKERJAAN : PEMADATAN TANAH DENGAN MESIN PEMADAT TUMBUK (PER 20 CM)

SATUAN PEMBAYARAN : M3

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.50000 61,000.00 30,500.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.05000 96,000.00 4,800.00

JUMLAH HARGA TENAGA 35,300.00

B PERLENGKAPAN

1 SEWA TAMPING RAMMER HARI 0.02282 454,620.00 10,374.10

JUMLAH HARGA PERLENGKAPAN 10,374.10

C JUMLAH HARGA TENAGA DAN BAHAN ( A + B ) 45,674.10

KODE ANALISA : B.09 SP

JENIS PEKERJAAN : PEMBUANGAN TANAH DENGAN MOBILISASI

SATUAN PEMBAYARAN : M3

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.33000 61,000.00 20,130.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.01000 96,000.00 960.00

JUMLAH HARGA TENAGA 21,090.00

B PERLENGKAPAN

1 MOBILISASI BUANGAN TANAH M3 1.00000 21,000.00 21,000.00

JUMLAH HARGA PERLENGKAPAN 21,000.00

C JUMLAH HARGA TENAGA DAN BAHAN ( A + B ) 42,090.00

KODE ANALISA : G.07

JENIS PEKERJAAN : BETON MUTU FC=19,3 MPA (K225) SLUMP (12 +- 2) CM, W/C = 0,58

SATUAN PEMBAYARAN : M3

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 1.65000 61,000.00 100,650.00

2 TUKANG BATU ORG/HR 0.27500 76,000.00 20,900.00

3 KEPALA TUKANG BATU ORG/HR 0.02800 90,000.00 2,520.00

4 MANDOR ORG/HR 0.08300 96,000.00 7,968.00

JUMLAH HARGA TENAGA 132,038.00

B BAHAN

1 PORTLAND CEMENT (PC) KG 371.00000 1,926.00 714,546.00

2 PASIR COR M3 0.49857 206,267.00 102,838.83

3 BATU PECAH MESIN 2/3 M3 0.77556 285,082.00 221,096.93

4 AIR BERSIH LTR 215.00000 44.00 9,460.00

JUMLAH HARGA BAHAN 1,047,941.76

(18)

L17 L01 M001 M016 M014 E64 E87 L17 L01 M021 M003 M498 M487. A M487 E64 E87 L17 L12 L06A L01 KODE ANALISA : S.12-F

JENIS PEKERJAAN : WATERBOUND MACADAM UTK. PEK. MINOR ( TEBAL 12 CM )

SATUAN PEMBAYARAN : M2

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.08889 61,000.00 5,422.22

2 MANDOR ORG/HR 0.02222 96,000.00 2,133.33

JUMLAH HARGA TENAGA 7,555.56

B BAHAN

1 PASIR URUG M3 0.05000 126,788.00 6,339.40

2 STENSLAH/BATU PECAH TANGAN 4/6 - 5/7 M3 0.05000 205,050.00 10,252.50

3 STENSLAH/BATU PECAH TANGAN 2/3 M3 0.02000 287,503.00 5,750.06

JUMLAH HARGA BAHAN 22,341.96

C PERLENGKAPAN

1 SEWA TAMPING RAMMER HARI 0.02860 454,620.00 13,000.00

2 ALAT BANTU (1 SET; 3 ALAT) M2 1.00000 6,000.00 6,000.00

JUMLAH HARGA PERLENGKAPAN 19,000.00

D JUMLAH HARGA TENAGA DAN BAHAN DAN PERLENGKAPAN ( A + B + C ) 48,897.52

KODE ANALISA : S. 08.SP

JENIS PEKERJAAN : ASPAL GORENG MANUAL (TEBAL 5 CM)

SATUAN PEMBAYARAN : M2

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.00310 61,000.00 189.10

2 MANDOR ORG/HR 0.00060 96,000.00 57.60

JUMLAH HARGA TENAGA 246.70

B BAHAN

1 BATU PECAH MESIN 4/6 - 5/7 M3 0.03030 238,167.00 7,216.46

2 PASIR HITAM M3 0.01980 199,103.00 3,942.24

3 KAYU BAKAR M3 0.10000 90,000.00 9,000.00

4 ASPAL PENGIKAT KG 0.20000 13,871.00 2,774.20

5 ASPAL KG 6.61500 13,871.00 91,756.67

JUMLAH HARGA BAHAN 114,689.56

C PERLENGKAPAN

1 SEWA TAMPING RAMMER HARI 0.02860 454,620.00 13,000.00

2 ALAT BANTU (1 SET; 3 ALAT) M2 1.00000 6,000.00 6,000.00

JUMLAH HARGA PERLENGKAPAN 19,000.00

D JUMLAH HARGA TENAGA DAN BAHAN DAN PERLENGKAPAN ( A + B + C ) 133,936.26

KODE ANALISA : R.21

JENIS PEKERJAAN : PEMASANGAN PIPA HDPE DIAMETER 1/2"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.01080 61,000.00 658.80

2 TUKANG PIPA ORG/HR 0.02400 80,000.00 1,920.00

3 KEPALA TUKANG PIPA ORG/HR 0.00300 90,000.00 270.00

4 MANDOR ORG/HR 0.00090 96,000.00 86.40

JUMLAH HARGA TENAGA 2,935.20

(19)

L17 L07 L02 L01 L17 L12 L06A L01 L17 L07 L02 L01 L17 L12 L06A L01 KODE ANALISA : B.18.B

JENIS PEKERJAAN : BOR CROSSING JALAN DIAMETER 1/2"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.53125 61,000.00 32,406.25

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.09032 96,000.00 8,670.24

JUMLAH HARGA TENAGA 41,076.49

B JUMLAH HARGA TENAGA ( A ) 41,076.49

KODE ANALISA : R.24

JENIS PEKERJAAN : PEMASANGAN PIPA HDPE DIAMETER 2"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.02700 61,000.00 1,647.00

2 TUKANG PIPA ORG/HR 0.04500 80,000.00 3,600.00

3 KEPALA TUKANG PIPA ORG/HR 0.00450 90,000.00 405.00

4 MANDOR ORG/HR 0.00135 96,000.00 129.60

JUMLAH HARGA TENAGA 5,781.60

B JUMLAH HARGA TENAGA ( A ) 5,781.60

KODE ANALISA : B.18

JENIS PEKERJAAN : BOR CROSSING JALAN DIAMETER 2"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 2.12500 61,000.00 129,625.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.36125 96,000.00 34,680.00

JUMLAH HARGA TENAGA 164,305.00

B JUMLAH HARGA TENAGA ( A ) 164,305.00

KODE ANALISA : R.25

JENIS PEKERJAAN : PEMASANGAN PIPA HDPE DIAMETER 3"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.03240 61,000.00 1,976.40

2 TUKANG PIPA ORG/HR 0.05400 80,000.00 4,320.00

3 KEPALA TUKANG PIPA ORG/HR 0.00540 90,000.00 486.00

4 MANDOR ORG/HR 0.00164 96,000.00 157.44

JUMLAH HARGA TENAGA 6,939.84

(20)

L17 L07 L02 L01 L17 L12 L06A L01 L17 L07 L02 L01 L17 L12 L06A L01 E03 E19 E24 KODE ANALISA : B.19

JENIS PEKERJAAN : BOR CROSSING JALAN DIAMETER 3"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 2.77500 61,000.00 169,275.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.41625 96,000.00 39,960.00

JUMLAH HARGA TENAGA 209,235.00

B JUMLAH HARGA TENAGA ( A ) 209,235.00

KODE ANALISA : R.26

JENIS PEKERJAAN : PEMASANGAN PIPA HDPE DIAMETER 4"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.03240 61,000.00 1,976.40

2 TUKANG PIPA ORG/HR 0.05400 80,000.00 4,320.00

3 KEPALA TUKANG PIPA ORG/HR 0.00540 90,000.00 486.00

4 MANDOR ORG/HR 0.00164 96,000.00 157.44

JUMLAH HARGA TENAGA 6,939.84

B JUMLAH HARGA TENAGA ( A ) 6,939.84

KODE ANALISA : B.20

JENIS PEKERJAAN : BOR CROSSING JALAN DIAMETER 4"

SATUAN PEMBAYARAN : M1

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 3.75000 61,000.00 228,750.00

2 TUKANG BATU ORG/HR 0.00000 76,000.00 0.00

3 KEPALA TUKANG BATU ORG/HR 0.00000 90,000.00 0.00

4 MANDOR ORG/HR 0.56250 96,000.00 54,000.00

JUMLAH HARGA TENAGA 282,750.00

B JUMLAH HARGA TENAGA ( A ) 282,750.00

KODE ANALISA : R.36

JENIS PEKERJAAN : TAPPING PIPA DIAMETER 3"

SATUAN PEMBAYARAN : UNIT

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.64800 61,000.00 39,528.00

2 TUKANG PIPA ORG/HR 1.08000 80,000.00 86,400.00

3 KEPALA TUKANG PIPA ORG/HR 0.05400 90,000.00 4,860.00

4 MANDOR ORG/HR 0.01640 96,000.00 1,574.40

JUMLAH HARGA TENAGA 132,362.40

B PERLENGKAPAN

1 SEWA MESIN GENSET HARI 0.28571 330,000.00 94,285.71

2 SEWA ALAT BERAT KHUSUS SEWA WATER PUMP HARI 0.14286 165,000.00 23,571.43

3 SEWA JACK HAMMER HARI 0.14286 132,000.00 18,857.14

JUMLAH HARGA PERLENGKAPAN 136,714.29

(21)

L17 L12 L06A L01 E03 E19 E24 L17 L12 L06A L01 E03 E19 E24 L12 L17 L12 L06A L01 KODE ANALISA : R.35

JENIS PEKERJAAN : TAPPING PIPA DIAMETER 2"

SATUAN PEMBAYARAN : UNIT

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.43200 61,000.00 26,352.00

2 TUKANG PIPA ORG/HR 0.72000 80,000.00 57,600.00

3 KEPALA TUKANG PIPA ORG/HR 0.03600 90,000.00 3,240.00

4 MANDOR ORG/HR 0.01080 96,000.00 1,036.80

JUMLAH HARGA TENAGA 88,228.80

B PERLENGKAPAN

1 SEWA MESIN GENSET HARI 0.28571 330,000.00 94,285.71

2 SEWA ALAT BERAT KHUSUS SEWA WATER PUMP HARI 0.14286 165,000.00 23,571.43

3 SEWA JACK HAMMER HARI 0.14286 132,000.00 18,857.14

JUMLAH HARGA PERLENGKAPAN 136,714.29

C JUMLAH HARGA TENAGA DAN BAHAN ( A + B ) 224,943.09

KODE ANALISA : R.37

JENIS PEKERJAAN : TAPPING PIPA DIAMETER 4"

SATUAN PEMBAYARAN : UNIT

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.81000 61,000.00 49,410.00

2 TUKANG PIPA ORG/HR 1.35000 80,000.00 108,000.00

3 KEPALA TUKANG PIPA ORG/HR 0.13500 90,000.00 12,150.00

4 MANDOR ORG/HR 0.02050 96,000.00 1,968.00

JUMLAH HARGA TENAGA 171,528.00

B PERLENGKAPAN

1 SEWA MESIN GENSET HARI 0.42857 330,000.00 141,428.57

2 SEWA ALAT BERAT KHUSUS SEWA WATER PUMP HARI 0.14286 165,000.00 23,571.43

3 SEWA JACK HAMMER HARI 0.14286 132,000.00 18,857.14

JUMLAH HARGA PERLENGKAPAN 183,857.14

C JUMLAH HARGA TENAGA DAN BAHAN ( A + B ) 355,385.14

KODE ANALISA : R.244

JENIS PEKERJAAN : PEMASANGAN DOUBLE NEPEL GP O.1/2''

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 TUKANG PIPA ORG/HR 0.01400 80,000.00 1,120.00

JUMLAH HARGA TENAGA 1,120.00

B JUMLAH HARGA TENAGA ( A ) 1,120.00

KODE ANALISA : R.112

JENIS PEKERJAAN : PEMASANGAN ZADEL KLEM BESI DIAMETER 2"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.07200 61,000.00 4,392.00

2 TUKANG PIPA ORG/HR 0.12000 80,000.00 9,600.00

3 KEPALA TUKANG PIPA ORG/HR 0.00600 90,000.00 540.00

4 MANDOR ORG/HR 0.00180 96,000.00 172.80

JUMLAH HARGA TENAGA 14,704.80

(22)

L17 L12 L06A L01 L17 L12 L06A L01 L17 L12 L06A L01 L17 L12 L06A L01 KODE ANALISA : R.113

JENIS PEKERJAAN : PEMASANGAN ZADEL KLEM BESI DIAMETER 3"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.10800 61,000.00 6,588.00

2 TUKANG PIPA ORG/HR 0.18000 80,000.00 14,400.00

3 KEPALA TUKANG PIPA ORG/HR 0.00900 90,000.00 810.00

4 MANDOR ORG/HR 0.00270 96,000.00 259.20

JUMLAH HARGA TENAGA 22,057.20

B JUMLAH HARGA TENAGA ( A ) 22,057.20

KODE ANALISA : R.114

JENIS PEKERJAAN : PEMASANGAN ZADEL KLEM BESI DIAMETER 4"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.12150 61,000.00 7,411.50

2 TUKANG PIPA ORG/HR 0.20250 80,000.00 16,200.00

3 KEPALA TUKANG PIPA ORG/HR 0.01350 90,000.00 1,215.00

4 MANDOR ORG/HR 0.00410 96,000.00 393.60

JUMLAH HARGA TENAGA 25,220.10

B JUMLAH HARGA TENAGA ( A ) 25,220.10

KODE ANALISA : R.79

JENIS PEKERJAAN : PEMASANGAN UNIVERSAL COUPLING DIAMETER 2"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.16500 61,000.00 10,065.00

2 TUKANG PIPA ORG/HR 0.11000 80,000.00 8,800.00

3 KEPALA TUKANG PIPA ORG/HR 0.05500 90,000.00 4,950.00

4 MANDOR ORG/HR 0.02500 96,000.00 2,400.00

JUMLAH HARGA TENAGA 26,215.00

B JUMLAH HARGA TENAGA ( A ) 26,215.00

KODE ANALISA : R.131

JENIS PEKERJAAN : PEMASANGAN COMPRESSION TEE PIPA HDPE 2"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.17300 61,000.00 10,553.00

2 TUKANG PIPA ORG/HR 0.08700 80,000.00 6,960.00

3 KEPALA TUKANG PIPA ORG/HR 0.04300 90,000.00 3,870.00

4 MANDOR ORG/HR 0.02000 96,000.00 1,920.00

JUMLAH HARGA TENAGA 23,303.00

(23)

L17 L12 L06A L01 L17 L12 L06A L01 M483 M484 E26 E03 L17 L12 L06A L01 KODE ANALISA : R.149

JENIS PEKERJAAN : PEMASANGAN COMPRESSION END CUP PIPA HDPE 2"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.05600 61,000.00 3,416.00

2 TUKANG PIPA ORG/HR 0.02800 80,000.00 2,240.00

3 KEPALA TUKANG PIPA ORG/HR 0.01450 90,000.00 1,305.00

4 MANDOR ORG/HR 0.00700 96,000.00 672.00

JUMLAH HARGA TENAGA 7,633.00

B JUMLAH HARGA TENAGA ( A ) 7,633.00

KODE ANALISA : R.46.SP

JENIS PEKERJAAN : PENYAMBUNGAN PIPA HDPE DIAMETER 2" (BUTT FUSSION)

SATUAN PEMBAYARAN : BH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.06000 61,000.00 3,660.00

2 TUKANG PIPA ORG/HR 0.03000 80,000.00 2,400.00

3 KEPALA TUKANG PIPA ORG/HR 0.03000 90,000.00 2,700.00

4 MANDOR ORG/HR 0.01000 96,000.00 960.00

JUMLAH HARGA TENAGA 9,720.00

B BAHAN

1 SOLAR INDUSTRI LTR 0.30000 10,120.00 3,036.00

2 MINYAK PELUMAS LTR 0.01250 67,044.00 838.05

JUMLAH HARGA BAHAN 3,874.05

C PERLENGKAPAN

1 SEWA BUTT WELDING MACHINE KL 250 (63 - 250 ) HARI 0.03000 350,000.00 10,500.00

2 SEWA MESIN GENSET HARI 0.03000 330,000.00 9,900.00

JUMLAH HARGA PERLENGKAPAN 20,400.00

D JUMLAH HARGA TENAGA DAN BAHAN DAN PERLENGKAPAN ( A + B + C ) 33,994.05

KODE ANALISA : R.132

JENIS PEKERJAAN : PEMASANGAN COMPRESSION TEE PIPA HDPE 3"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.20400 61,000.00 12,444.00

2 TUKANG PIPA ORG/HR 0.10200 80,000.00 8,160.00

3 KEPALA TUKANG PIPA ORG/HR 0.05100 90,000.00 4,590.00

4 MANDOR ORG/HR 0.02500 96,000.00 2,400.00

JUMLAH HARGA TENAGA 27,594.00

(24)

L17 L12 L06A L01 M483 M484 E26 E03 L17 L12 L06A L01 L17 L12 L06A L01 KODE ANALISA : R.47

JENIS PEKERJAAN : PENYAMBUNGAN PIPA HDPE DIAMETER 3" (BUTT FUSSION)

SATUAN PEMBAYARAN : BH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.08000 61,000.00 4,880.00

2 TUKANG PIPA ORG/HR 0.04000 80,000.00 3,200.00

3 KEPALA TUKANG PIPA ORG/HR 0.04000 90,000.00 3,600.00

4 MANDOR ORG/HR 0.01000 96,000.00 960.00

JUMLAH HARGA TENAGA 12,640.00

B BAHAN

1 SOLAR INDUSTRI LTR 0.40000 10,120.00 4,048.00

2 MINYAK PELUMAS LTR 0.01250 67,044.00 838.05

JUMLAH HARGA BAHAN 4,886.05

C PERLENGKAPAN

1 SEWA BUTT WELDING MACHINE KL 250 (63 - 250 ) HARI 0.04000 350,000.00 14,000.00

2 SEWA MESIN GENSET HARI 0.04000 330,000.00 13,200.00

JUMLAH HARGA PERLENGKAPAN 27,200.00

D JUMLAH HARGA TENAGA DAN BAHAN DAN PERLENGKAPAN ( A + B + C ) 44,726.05

KODE ANALISA : R.133

JENIS PEKERJAAN : PEMASANGAN COMPRESSION TEE PIPA HDPE 4"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.20400 61,000.00 12,444.00

2 TUKANG PIPA ORG/HR 0.10200 80,000.00 8,160.00

3 KEPALA TUKANG PIPA ORG/HR 0.05100 90,000.00 4,590.00

4 MANDOR ORG/HR 0.02500 96,000.00 2,400.00

JUMLAH HARGA TENAGA 27,594.00

B JUMLAH HARGA TENAGA ( A ) 27,594.00

KODE ANALISA : R.151

JENIS PEKERJAAN : PEMASANGAN COMPRESSION END CUP PIPA HDPE 4"

SATUAN PEMBAYARAN : BUAH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.05600 61,000.00 3,416.00

2 TUKANG PIPA ORG/HR 0.02800 80,000.00 2,240.00

3 KEPALA TUKANG PIPA ORG/HR 0.01450 90,000.00 1,305.00

4 MANDOR ORG/HR 0.00700 96,000.00 672.00

JUMLAH HARGA TENAGA 7,633.00

(25)

L17 L12 L06A L01 M483 M484 E26 E03 KODE ANALISA : R.48

JENIS PEKERJAAN : PENYAMBUNGAN PIPA HDPE DIAMETER 4" (BUTT FUSSION)

SATUAN PEMBAYARAN : BH

No. KOMPONEN SATUAN PERKIRAAN

KUANTITAS HARGA SATUAN (Rp) JUMLAH HARGA (Rp) A TENAGA

1 PEKERJA BIASA ORG/HR 0.12000 61,000.00 7,320.00

2 TUKANG PIPA ORG/HR 0.06000 80,000.00 4,800.00

3 KEPALA TUKANG PIPA ORG/HR 0.06000 90,000.00 5,400.00

4 MANDOR ORG/HR 0.01000 96,000.00 960.00

JUMLAH HARGA TENAGA 18,480.00

B BAHAN

1 SOLAR INDUSTRI LTR 0.60000 10,120.00 6,072.00

2 MINYAK PELUMAS LTR 0.01250 67,044.00 838.05

JUMLAH HARGA BAHAN 6,910.05

C PERLENGKAPAN

1 SEWA BUTT WELDING MACHINE KL 250 (63 - 250 ) HARI 0.06000 350,000.00 21,000.00

2 SEWA MESIN GENSET HARI 0.06000 330,000.00 19,800.00

JUMLAH HARGA PERLENGKAPAN 40,800.00

(26)
(27)

JL. NIAGA JL. TERSUSAN HALMAHERA JL. SINGKEP JL. BENGKALIS JL. RUPAT JL. RUPAT JL. MALAKA JL. MALAKA JL. BENGKALIS JL. PULAU SERIBU JL. KARIMATA JL. MENARI JL. TAMAN BUNGA JL. MENTAWAI JL. TAMAN RIAU JL. TANIMBAR JL. TANIMBAR JL. RAAS JL. PUTERAN JL. GENTENG JL. MADURA JL. SAPU LIDI JL. BAWEAN JL. KALIMANTAN JL. SEMPU JL. YOS SUDARSO JL. BELITUNG JL. PULAU BURU JL. NIAS JL.SAPARUA JL. NATUNA JL. MENARI JL. KALIMANTAN JL. SANGIR JL. OBI JL. BANDA JL. AMBON JL. BALI JL. KALIMANTAN JL. SERAM JL. TIMOR 407 m 407 m 271 m 271 m 140 m 140 m 50 m 232 m 232 m 144 m 144 m 71 m 71 m 207 m 207 m 245 m 245 m 265 m 265 m 210 m 210 m TGL/BLN/THN :

Lay Out Jaringan

JL. YOS SUDARSO - JL. TANIMBAR

DAN SEKITARNYA

KEC. KLOJEN

KOTA MALANG

MEI 2019

REHAB JARINGAN PIPA DISTRIBUSI PE100-PN12.5 / GP-MS

: 652 Meter : 914 Meter : 676 Meter : 268 Meter

TOTAL PANJANG PIPA : 2.510 Meter

PERUSAHAAN DAERAH AIR MINUM

KOTA MALANG

JUDUL GAMBAR :

GAMBAR RENCANA : KETERANGAN :

MANAJER PERENCANAAN TEKNIK

DIREKTUR TEKNIK DIREKTUR UTAMA LOKASI UTARA

TNI AL

NEGERI 4

SMU NEGERI 5

SMK

JL. YOS SUDARSO REKONDISI JALAN :

SEMUA REKONDISI ASPAL DIKURANGI PANJANG BORING SETIAP DIAMETER PIPA.

BORING = 30 meter = 22 meter

1

2

3

4

5

6

7a

7b

8

9a

9b

14

9c

10a

10b

10c

10d

10e

11a

11b

13

12a

12b

12c

(28)

1

2

3

4

5

6

7

8

a-b

9 a-c

10 a-d

11 a-b

TGL/BLN/THN :

Detail Jaringan

JL. YOS SUDARSO - JL. TANIMBAR

DAN SEKITARNYA

KEC. KLOJEN

KOTA MALANG

MEI 2019

REHAB JARINGAN PIPA DISTRIBUSI PE100-PN12.5 / GP-MS

: 652 Meter : 914 Meter : 676 Meter : 268 Meter

TOTAL PANJANG PIPA : 2.510 Meter

PERUSAHAAN DAERAH AIR MINUM

KOTA MALANG

JUDUL GAMBAR :

GAMBAR RENCANA : KETERANGAN :

MANAJER PERENCANAAN TEKNIK

DIREKTUR TEKNIK

DIREKTUR UTAMA

LOKASI UTARA

REKONDISI JALAN :

SEMUA REKONDISI ASPAL DIKURANGI PANJANG BORING SETIAP DIAMETER PIPA.

BORING = 30 meter = 22 meter

LAMA

PE

36x

LAMA

PE

128x

LAMA

PE

(u/ SL.

005619

)

14

SR

PINDAH ZADLE

SR

PINDAH ZADLE

SR

PINDAH ZADLE

97x

12 a-c

13

(29)
(30)
(31)
(32)

PERUSAHAAN DAERAH AIR MINUM

KOTA MALANG

PEKERJAAN : REHAB JARINGAN PIPA DISTRIBUSI PE100-PN 12,5/ GP-MS SEPANJANG

2.510 METER

L O K A S I

: JL. YOS SUDARSO - JL. TANIMBAR DAN SEKITARNYA (KEC. KLOJEN)

A. RUANG LINGKUP PEKERJAAN

Ruang lingkup spesifikasi teknik pekerjaan ini antara lain :

I.

Pekerjaan Persiapan

II.

Pekerjaan Tanah

III.

Pekerjaan Pasangan

IV.

Pekerjaan Rekondisi Jalan

V.

Pekerjaan Pipa

VI.

Pekerjaan Penyelesaian

I.

Pekerjaan Persiapan

1. Pekerjaan pengukuran / UitSet dilakukan untuk rencana tempat pemasangan pipa dengan

pemasangan patok-patok kayu dengan jarak

±

50 meter.

2. Untuk keamanan para pekerja dan pengendara jalan saat pelaksanaan pekerjaan perlu

dibuat rambu-rambu dengan Standar K3 demi kepentingan umum.

3. Pelaksana harus menyediakan semua alat-alat pengaman yang diperlukan untuk

menjamin perlindungan yang cukup bagi orang dan barang.

Kontraktor harus mematuhi semua persyaratan yang telah ditentukan dalam

Undang-Undang Ketenagakerjaan yang berlaku di Indonesia selama masa kontrak yang

mempengaruhi kondisi kerja, keselamatan, kesehatan atau kesejahteraan karyawan baik

karyawan Kontraktor, Direksi maupun pemilik proyek.

Syarat-syarat berikut ini harus diperhatikan :

1.

Semua galian harus dijaga dari kemungkinan runtuh/longsor dan dilengkapi dengan

pagar pengaman maupun papan-papan tanda peringatan-peringatan lain.

2.

Setiap orang yang bekerja, mengunjungi atau melakukan inspeksi dibagian manapun

dari proyek harus dilengkapi dan diharuskan memakai pakaian pelindung atau

perlengkapan lainnya. Perlengkapan ini termasuk helm pengaman, rompi safety,

sarung tangan, alas kaki, safety shoes ,pelindung mata, dan perlengkapan pelindung

lainnya atau peralatan lain yang dipandang perlu oleh Direksi.

(33)

3.

Semua instruksi dan rekomendasi dari pabrik dalam penggunaan produk-produknya,

pemakaian, prosedur pelaksanaan setiap material atau bagian dari perlengkapan atau

peralatan, harus diikuti dengan tepat.

Berikut detail dan spesifikasi Alat Pelindung Diri :

Jenis Alat

Pelindung Diri

Item Detail

Spesifikasi & Merk

Alternatif

Contoh

Jumlah

Pakaian

Pelindung

Safety

Wear/Rompi

Warna hijau /

oranye

Sejumlah

Pekerja

HARD HATS

(Pelindung

Kepala)

Safety Helm

Merk : AO Safety

Standard : Ansi Z

89.1.1986

Atau Merk : MSA

Atau Merk Wilson,

atau setara

Sejumlah

Pekerja

Pelindung Tangan

Short Safety

Hand Gloves

Bahan Katun

Sejumlah

Pekerja

SAFETY SHOES

(Sepatu

Keselamatan)

Safety Shoes

With Steel Toe

Cap untuk

pekerjaan Baja &

Operator jack

hammer

Merk Krisbow atau

setara

Sesuai

kebutuhan

(34)

Rubber Safety

Shoes With Steel

Toe Cap

(Sepatu Karet

Keselamatan

Kerja)

Merk Krisbow, King,

AP boot atau setara

Sesuai

kebutuhan

Berikut detail Spesifikasi Standar Rambu-rambu Peringatan :

Jenis Alat

Pengaman

Spesifikasi

Contoh

Safety line

Bahan : plastik, lebar

min. 5 cm

Cone/ kerucut

lalu lintas

Bahan karet

Barikade

Bahan : Seng/ Papan

Kayu/ Plastik

II.

Pekerjaan Tanah

1.

Mengadakan penelitian dari fasilitas umum yang terdapat dalam tanah seperti halnya

fasilitas listrik, telpon dan saluran pembuangan atau pipa-pipa air minum dan mengadakan

hubungan atau koordinasi dengan pihak-pihak yang ada hubungannya dengan pekerjaan

ini, khususnya dalam rangka penggalian untuk pemasangan pipa.

(35)

2.

Dimensi galian untuk pipa; Ø 2” HDPE : kedalaman = 0.70 m, lebar = 0.20 m

Ø 3” HDPE : kedalaman = 0.70 m, lebar = 0.20 m

Ø 4” HDPE : kedalaman = 0.70 m, lebar = 0.25 m

Ø 6” HDPE : kedalaman = 0.90 m, lebar = 0.30 m

Ø 8” HDPE : kedalaman = 0.90 m, lebar = 0.35 m

3.

Untuk Crossing (Pengeboran) jalan; pada titik-titik pengeboran pipa, wajib dipasang

rambu-rambu peringatan Standar K3 guna menjaga keselamatan pekerja dan pengendara

jalan.

4.

Menyediakan pengangkutan pipa-pipa, sambungan dan valve dari gudang ke tempat

pekerjaan termasuk bongkar muatan, serta mengamankan dan melindungi dari kerusakan

5.

Pada pekerjaan urugan tanah kembali, tanah bekas galian harus dipadatkan dengan

menggunakan alat pemadat tumbuk

Tamping Rammer.

6.

Pemasangan pipa dan sambungan-sambungan termasuk menurunkan kedalam galian,

pembersihan, penyambungan ataupun pemotongan pipa, pengeringan air dalam galian.

7.

Untuk jalan lingkungan / perkampungan dengan lebar ≤ 2 meter dapat dilihat pada tabel di

bawah ini :

(mm)

(inch)

Tinggi (d)

Lebar (w)

50

2"

HDPE

0,5

0,2

75

3"

HDPE

0,5

0,2

Standar ini dapat berubah pada titik tertentu yang berbenturan seperti :

- Pipa lama ( existing)

- Saluran / Gorong - gorong

- Jembatan

- Akar Pohon

- Kabel Telepon/ PLN

- dll

Ø

Pipa

Dimensi Galian (m)

Jenis Pipa

III.

Pekerjaan Pasangan

1.

Thrust Block.

Pada semua perubahan arah aliran, perubahan diameter pipa harus dilengkapi dengan

Thrust Block dari beton.

Mutu beton K-225 campuran 1 Pc : 2 Ps : 3 Kr.

IV.

Pekerjaan Pengembalian Jalan

A.

Jalan Paving

1. Bahan

Paving yang dipakai adalah paving press dengan kekuatan tekan K - 300

2. Persyaratan dan Tata Cara Pemasangan Paving Block

Referensi

Dokumen terkait

Data yang diperlukan oleh perangkat lunak sistem informasi ini antara lain adalah data mengenai harga bahan-bahan di pasaran, daftar satuan pekerjaan dan lain-lain

Daftar Upah Tenaga Kerja t Daftar Analisa Daftar Harga Bahan r 1 Daftar Harga Satuan Pekerjaan Anggaran Total Proyek Anggaran Tiap Pekerjaan —• RKS j, Daftar Peke volume rjaan

PEKERJAAN : PEMELIHARAAN DAERAH IRIGASI MENU LOKASI : DESA MENU, KECAMATAN NUNKOLO TAHUN ANGGARAN : 2013. Jarak Angkut Biaya Lain Harga Satuan ( Km ) Lain ( Rp ) (

Untuk melakukan analisis ini diperlukan harga satuan dasar tenaga, bahan, dan peralatan yang sesuai dengan kondisi di lokasi proyek.. 8.1 HARGA SATUAN DASAR TENAGA

Hutama Karya (Persero) Wilayah III dalam melakukan pembelian bahan baku/material selalu berupaya untuk melakukan pengendalian persediaan kuantitas bahan

letter plat galvalum finnishing chrome/glossy t=0.8 mm tinggi 65 cm "TERMINAL GUNUNG PATI" PEKERJAAN PLAFOND Pemasangan 1 m2 langit-langit gypsum board ukuran 120x240x9 mm tebal 9 mm

DaftarSatuanUpah 26 DINAS PARIIASATA KABUPATEN ROTE NDAO TAHUN 2007 NO JENIS UPAH  MATERIAL SAT HARGA 9 R&$... DaftarSatuanUpah 27 NO JENIS UPAH  MATERIAL SAT HARGA 9

Jenis Pekerjaan Satuan Volume Harga Satuan Rp... Jumlah Harga TOTAL Biaya