• Tidak ada hasil yang ditemukan

Ditjen. Bina Marga, 2013, Pedoman Dokumen Pemilihan Kontrak Berbasis Kinerja (Performance Based Contract), Jakarta. Ditjen.

N/A
N/A
Protected

Academic year: 2021

Membagikan "Ditjen. Bina Marga, 2013, Pedoman Dokumen Pemilihan Kontrak Berbasis Kinerja (Performance Based Contract), Jakarta. Ditjen."

Copied!
5
0
0

Teks penuh

(1)

158 DAFTAR PUSTAKA

_______________, 2012, Importance-Performance Analysis, http://digilib.ittelkom.ac.id/index.php?option=com_content&view=article&id=88

4:importance-performance-analysis-ipa&catid=25:industri&Itemid=14

______________, Performance-Based Contracts for Management and Maintenance of Roads (PMMR) : Case Study Denmark, www-esd.worldbank.org.

Alyami, Z., 2012, A Two Phase Maintenance and Rehabilitaion Framework for Pavement Assets Under Performance Based Contracts, University of Waterloo, Ontario, Canada.

Armistead, A., 2003, Development of Performance and Specifications, Opus International Consultants, New Zealand.

Azwar, S., 2001, Metode Penelitian, Pustaka Pelajar, Yogyakarta.

Balai Besar Pelaksanaan Jalan Nasional I, 2013, Rapat Kerja Terbatas Kementerian Pekerjaan Umum, Jakarta

Balitbang Departemen Pekerjaan Umum, 2004, Pengembangan Model Implementasi Performance Based Contract (PBC) untuk Pembangunan dan Pemeliharaan Jalan di Indonesia, Bandung.

Balitbang Departemen Pekerjaan Umum, 2006, Kajian Penerapan Kontrak Berbasis Kinerja untuk Konstruksi Jalan di Atas Tanah Lunak, Bandung. Berkland, T., Bell, C.L., 2007, Performance-Based Contracting and Improving the

Current Contracting Process, Clemson University, South Carolina, USA. Baquero, P.I., 2005, Performance-Based Procurement : The Key to Effective

Basic Services Provision in Developing Countries, PrAcademics Press, USA.

Carpenter, C., Fekpe, E., Gopalakrishna, D., 2003, Performance-Based Contracting for the Highway Construction Industry, Koch Industries Inc, Washington DC, USA.

CIPS, NIGP, 2012, Public Procurement Practice : Performance Based Contracting Cooper, D.E., 2002, Contract Management, Guidance Needed for Using

Performance-Based Service Contracting, United States General Accounting Office, USA.

Dardak, H., 2007, Arah dan Kinerja Investasi Bidang Jalan, Konferensi Nasional Teknik Jalan (KNTJ) 8, Jakarta.

Dipohusodo I., 1996, Manajemen Proyek dan Konstruksi : Jilid I, Kanisius, Yogyakarta.

Ditjen Bina Marga, 2012,Akselerasi Industrialisasi Dalam Rangka Mendukung Percepatan dan Pembangunan Ekonomi,Paparan Direktur Jenderal Bina Marga, Jakarta.

(2)

159 Ditjen. Bina Marga, 2013, Pedoman Dokumen Pemilihan Kontrak Berbasis

Kinerja (Performance Based Contract), Jakarta.

Ditjen.Bina Marga, 2014, e-Monitoring Laporan Penyerapan Anggaran, www.emonitoring.pu.go.id.

Ernanda, R., 2012, Identifikasi Karakteristik Jalan Nasional Untuk Pengelolaan Jalan Dengan Penerapan Performance Based Contract di Indonesia, Institut Teknologi Bandung, Bandung.

Ervianto, I.W., 2005, Manajemen Proyek Konstruksi, Penerbit ANDI, Yogyakarta Frost, M., Lithgow, C.M., 1998, Future Trends in Performance-Based

Contracting- Legal and Technical Perspectives, IIR conference, Sydney, Australia.

Greenwood, I., Henning, T., 2006, Introducing Performance Based Maintenance Contracts to Indonesia, World Bank, USA.

Gupta, D., 2011, Optimal Contract Mechanism Design for Performance Based Contracts, University of Minnesota, USA.

Hamdi, M., 2012, Manajemen Kinerja Pada Proyek Konstruksi, Universitas Brawijaya, Malang,hamdimuhammad.blogspot.com

Hardy, P., 2001, Austroads Review of Performance Contracts : The Potential Benefits of Performance Contracts, New Zealand Institute of Highway Technology Symposium, New Zealand.

Hasanuddin, Astuti, T., 2008, Optimalisasi Kegiatan di Bidang Pemeliharaan Jalan Tol Dalam Rangka Mewujudkan PT. Jasa Marga (Persero) Tbk Modern dan Kompetitif, Surabaya.

Hendrawan, H., 2012, Prospek Implementasi Performance Based Contract Pada Pengelolaan Infrastruktur Jalan, Bandung.

Jurnal Prakarsa, 2011, Membangun Jalan, Edisi 5, Jakarta. Jurnal Prakarsa, 2013, Jalan Daerah, Edisi 14, Jakarta.

Kashiwagi, D.T., Bari, J., Bevan, S., 2003, Application of Performance Based System in the Pavement Contracting, Arizona State University, Arizona, USA.

Koriawan, N., 2009, Karakteristik dan Kinerja Perusahaan Jasa Konstruksi Kualifikasi Kecil di Kabupaten Jembrana, Universitas Udayana, Denpasar, Bali.

Laksono, A.D., 2013, Model Penerapan Standar Mutu Pada Pekerjaan Pemeliharaan Jalan Ditinjau dari Segi SDM Pengelola, Universitas Sebelas Maret, Surakarta.

Liautaud, G., 2001, Maintaining Roads. Experience With Output-Based Contracts in Argentina, Argentina.

Martilla, J.A., James, J.C., 1977, Importance-Performance Analysis, Pacific Lutheran University, Tacoma, USA.

(3)

160 Martin, L.L., 2008, Approaches to Performance-Based Contracting (PBC) for

Social Services, University of Central Florida, Florida, USA.

Mitsubishi Research Institute, 2006, Framework Performance Based Expressway Maintenance in China, World Bank, USA.

Mudjisantosa, 2013, Kontrak Berbasis Kinerja atau Performance Based Contract, http://www.mudjisantosa.net/2013/03/.

Mulyono, A.T., 2007, Model Monitoring dan Evaluasi Pemberlakuan Standar Mutu Perkerasan Jalan Berbasis Pendekatan Sistemik, Universitas Diponegoro, Semarang.

Mulyono, A.T., 2013,Monitoring dan Evaluasi Akar Masalah & Kendala Penyelenggaraan Jalan,Yogyakarta.

Narbuko, C., Achmadi. A., 1997, Metodologi Penelitian, Bumi Aksara, Jakarta. NCHRP (National Cooperative Highway Research Program) Synthesis 389, 2009,

Performance_Based Contracting for Maintenance : A Synthesis of Highway Practice, Maryland, USA.

Nugraha R., Harsono, A., Adianto, H., 2014, Usulan Peningkatan Kualitas Pelayanan Jasa pada Bengkel “X” Berdasarkan Hasil Matrix Importance-Performance Analysis : Studi Kasus : Bengkel AHASS PD. Sumber Motor Karawang, Institut Teknologi Nasional, Bandung.

Ozbek, M.E., 2004, Development of Performance Warranties for Performance Based Road Maintenance Contracts, Virginia, USA.

Pakkala, P., 2002, Innovative Project Delivery Methods for Infrstructure, Finnish Road Enterprise, Hensinki.

Pakkala, P., 2005, Performance-Based Contracts-International Experiences, Finnish Road Administration.

Pinero, C.J., 2003, A Fproblem dasarework for Monitoring Performance-Based Road Maintenance, Virginia, USA.

Plummer, J., 2010, Efficiency Ratings in Performance Based Road Maintenance Contracts, Virginia, USA

Peraturan Menteri Pekerjaan Umum Nomor 04, 2009, Sistem Manajemen Mutu, Jakarta

Prasetyo, B. dan Jannah, L.M., 2005, Metode Penelitian Kuantitatif, RajaGrafindo Persada, Jakarta.

Pusat Komunikasi Publik Kementerian Pekerjaan Umum, 2013,2014: Bina Marga Terapkan Kontrak Berbasis Kinerja di 4 Kota, Jakarta.

Queiroz, C., 1999, Contractual Procedures to Involve the Private Sector in Road Maintenance and Rehabilitation, World Bank, Washington DC.

Rahadian, H., 2008, Langkah Awal Menuju Performance Based Contract Melalui Extended Warranty Period, Direktorat Bina Teknik Ditjen. Bina Marga Kementerian Pekerjaan Umum, Jakarta.

(4)

161 Rajagopal, B., Presentation on Long Term Performance Based Road Contracts,

Hyderabad, India,http://finmin.nic.in

Rosadi, A., Nurdiansyah, E. F., Bagia, H., Iksanudin, Triwidawaty, N., Joewono, T. B., 2009, Kajian Penerapan Performance Based Contract (PBC) di Jalur Pantura Jawa Barat, Universitas Parahyangan, Bandung.

Robinson, M.D., 2000, Lesson Learned in Performance Based Maintenance Contracting, SAIC.

Satitidjati, T., 2012, Pengukuran kinerja, http://blog.trisakti.ac.id/triwulandarisd/-2012/01/04/pengukuran-kinerja/

Sekretariat Negara, 1999, Undang-Undang Nomor 18, Jasa Konstruksi, Jakarta. Sekretariat Negara, 2004,Undang-Undang Nomor 38, Jalan, Jakarta.

Sekretariat Negara, 2010, Peraturan Presiden Nomor 54, Pengadaan Barang/Jasa, Jakarta.

Setjend.Departemen Pekerjaan Umum, 2007, Kajian Pengembangan Kontrak Berdasarkan Kinerja Pada Industri Jasa Konstruksi, Jakarta.

Stankevich, N., Qureshi, N., Queiroz, N., 2009, Performance-Based Contracting for Preservation and Improvement of Roads Assets, World Bank, Washington, USA.

Stolovitch, H.D., Keeps, E.J., 2006, Handbook of Human Performance Technology, Pfeiffer, USA.

Sultana, M., Rahman, A., Chowdhury, S., 2012, An Overview of Issues to Consider Before Introducing Performance-Based Road Maintenance Contracting, World Academy of Science.

Sugiyono, 2010, Metode Penelitian Kuantitatif Kualitatif dan R&D, Alfabeta, Bandung.

Sukandarrumidi, 2004, Metodologi Penelitian : Petunjuk Praktis Untuk Peneliti Pemula, Gadjah Mada University Press, Yogyakarta.

Suratno, Strategi Manajemen Sumber Daya Manusia, www.sulut.kemenag.go.id Susantono, B., Mulyono, A.T., 2008, Jalan Rusak dan Good Governance, Bisnis

Indonesia, www.baderi.wordpress.com.

Tamin, R.Z, Tamin, A.Z, Marzuki P.F., 2011, Performance Based Contract Application Opportunity and Challenges in Indonesia National Roads Management, Bandung.

TPEKTN (Tim Pemantauan dan Evaluasi Kebijakan Transportasi Nasional) Kantor Kementerian Koordinator Bidang Perekonomian Republik Indonesia, 2009,Kebijakan dan Strategi Untuk Meningkatkan Efisiensi Pengelolaan Infrastruktur Jalan Secara Berkelanjutan,Jakarta.

Uthus, L., 2008, The Perfect Performnce Based Contract – How Should It Be, Norwegia.

(5)

162 Analysis (IPA), http://dataolah.blogspot.com/2012/08/langkah-langkah-analisis-importance.html.

Wahyudi, S., 2009, Penerapan Kontrak Berbasis Kinerja (Performance Based Contract) Untuk Meningkatkan Efektifitas Penanganan Pemeliharaan Jalan, Universitas Indonesia, Jakarta.

Warta Anggaran, 2012, Performance Based Contract : Solusi Pekerjaan Perawatan Jalan, Edisi 24, Jakarta

Weijnen, M., 2010, Innovative Contracting Practices in the Road Sector : Opportunistic Behaviour and its use in Road Markets.

Wibowo, A., 2009, Perancangan Sistem Pengukuran Kinerja Proyek dengan Metode Performance Prism, Institut Teknologi Sepuluh Nopember, Surabaya.

Widiasanti, I., Lenggogeni, 2013, Manajemen Konstruksi, Remaja Rosdakarya, Bandung.

Wirahadikusumah, R., Abduh M., 2007, Metoda Kontrak Inovatif Untuk Peningkatan Kualitas Jalan : Peluang dan Tantangan, Lokakarya KNTJ-7, Jakarta.

World Bank, 2006, Procurement of Works and Services Under Output and Performance Based Road Contract, Washington D.C.

Zietlow, G., 2004, Implementing Performance-Based Road Management and Maintenance Contracts in Developing Countries, Echborn, Jerman.

Zietlow, G., 2005, Cutting Costs and Improving Quality Through Performance-Based Road Management and Maintenance Contracts, German Development Cooperation, Birmingham, UK.

Zietsman, J., 2004, Performance Measures for Performance Based Maintenance Contracts, Texas Transportation Institute, www.trb-performance measurement.org

Referensi

Dokumen terkait

Sehingga jenis aliran tanah ini sering disebut dengan aliran lumpur ( mudflow ). 4) Rayapan ( creep ): Rayapan adalah aliran material berupa batuan dan tanah pada lereng,

Pemantapan Pelaksanaan Skim Takaful Pelajar Sekolah Malaysia (TPSM) Bagi Semua Murid Pra Sekolah, Sekolah Rendah dan Sekolah Menengah di Sekolah-sekolah Kerajaan

Pada penelitian ini dilakukan isolasi dan uji aktivitas sitotoksik spons Penares sp dari perairan Taman Nasional Bali Barat.. Isolasi dilakukan dengan metode isolasi dipandu

Penelitian dilakukan dengan tujuan untuk: (1) mengkaji kemungkinan pemanfaatan tepung sukun dalam pembuatan kue kering sukun sebagai bahan alternatif substitusi tepung beras

Permasalahan dan penjelasan yang telah di uraikan sebelumnya, maka data yang diolah dalam penelitian ini adalah tentang hubungan daya ledak otot tungkai terhadap

Mengunjungi banyak negara-negara di dunia telah membuka mata saya, akan keberagaman sistem nilai, sosial, maupun budaya yang turut berpengaruh dalam sistem pelayanan

[r]

Tabel CXLVII Testing Form Tambah Data Pembelian