• Tidak ada hasil yang ditemukan

Investor Newsletter DSNG 12M15

N/A
N/A
Protected

Academic year: 2017

Membagikan "Investor Newsletter DSNG 12M15"

Copied!
2
0
0

Teks penuh

(1)

PT DHARMA SATYA NUSANTARA TBK (DSNG)

INVESTOR NEWSLETTER

Number 13 | Januari 2016

FY-2015 FY-2014 YoY% Q1-2015 Q2-2015 Q3-2015 Q4-2015 QoQ%

Plantation Performance

FFB Production (ton) 1,489,022 1,376,498 8.2 298,953 375,347 384,272 430,450 12.0 - FFB Nucleus (ton) 1,351,424 1,257,635 7.5 273,556 342,248 348,997 386,623 10.8

- FFB Plasma (ton) 137,598 118,864 15.8 25,397 33,099 35,276 43,827 24.2

Mill Performance

FFB Processed (ton) 1,725,560 1,635,341 5.5 351,237 437,384 437,315 499,623 14.2

CPO Production(ton) 407,155 390,857 4.2 78,258 101,816 105,811 121,269 14.6

PK Production (ton) 60,598 53,324 13.6 10,923 14,925 15,620 19,130 22.5

PKO Production (ton) 20,489 18,197 12.6 3,455 4,582 5,580 6,871 23.1

CPO OER (%) 23.60 23.90 (1.3) 22.28 23.28 24.20 24.27 0.3

FFA (%) 2.57 2.93 (12.0) 2.80 2.46 2.65 2.45 (7.5)

Sales Performance*

CPO (ton) 409,815 394,344 3.9 82,550 102,350 98,850 126,065 27.5

PK (ton) 9,523 10,127 (6.0) 2,364 2,161 1,735 3,264 88.1

PKO (ton) 19,501 19,704 (1.0) 3,000 6,000 3,500 7000 100

DSNGroup s CPO production in 2015 reached 407 thousand tons , for an increase 4.2% compared to production in 2014. Total FFB production also rose to new high of 1.49 million tons for the full year, or 8.2% higher compared to the 2014.

Total FFB Processed increased by 5.5% to 1.73 million tons , while the CPO Oil Extraction Rate declined slightly to 23.60% from 23.90% in 2014. FFA levels showed a marked improvement in the 12

months of 2015, from an aggregate 2.93% in 2014 to 2.57% in the current year.

Theco pa y s CPO sales volume increased to 409.8 thousand tons in the year, or 3.9% higher than the same period last year.

Our realized ASP for CPO from January to December 2015 was Rp. 6.86 million per ton, a decline of 17.1 % from Rp.8.27 million per ton in 2014.

1

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

FFB PRODUCTION ('000 TONS)

2014 2015

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

CPO PRODUCTION ('000 TONS)

2014 2015

DSNG Price is based on FOB Labanan Port Pricing

8.73 8.73 8.89 9.07 8.82

8.39 8.34 8.36

7.66

7.45 7.58 7.65

7.58 7.58 7.78 7.79

7.16 7.33 7.51

7.00

6.13

5.89 6.17 5.76

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

AVERAGE SELLING PRICE (Rp 'million/ton)

KPB Medan 2014Labanan 2014 KPB Medan 2015Labanan 2015

(2)

PT DHARMA SATYA NUSANTARA TBK (DSNG)

INVESTOR NEWSLETTER

FY-2015 FY-2014 % YoY Q1-2015 Q2-2015 Q3-2015 Q4-2015 QoQ%

Sales Volume *

Panel (m3) 179,567 201,696 (11.0) 48,235 58,164 38,905 34,263 (11.9) Engineered doors

(Pcs) 61,948 51,469 20.4 14,576 12,293 16,754 18,325 9.4 Engineered flooring

(M2) 1,098,252 1,145,956 (4.2) 256,965 260,115 298,925 282,247 (5.6)

Average Selling Price (ASP)*

Panel (Rp million /m3) 4.68 4.37 7.1 4.60 4.54 4.78 4.95 3.6 Engineered doors

(Rp million /pcs) 1.25 1.24 1.1 1.49 1.43 1.11 1.06 (3.9) Engineered flooring

(Rp million /m2) 0.41 0.37 11.4 0.39 0.42 0.44 0,39 (11.4)

WOOD PRODUCTS BUSINESS

The ASPfor the Co pa y s wood products in this year continued to improve with panel and engineered doors .higher by 7.1% and 1.1% respectively. Engineered flooring prices were up by 11.4%. At the same time, the volume outlook has declined. Wood panel sales volume dropped by 11.0% to 180 thousand m3, and sales of Engineered flooring also declined by 4.2 % in the period. The volume of Engineered doors, however, increased by 20.4% compared to 2014.

DSNG Investor Newsletter —For further information, contact Investor Relations (investor.relations@dsngroup.co.id) PT Dharma Satya Nusantara Tbk. Jl. Rawa Gelam V Kav OR/3B Kawasan Industri Pulogadung, Jakarta 13930 Indonesia DISCLAIMER: The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. Any forward looking information in this presentation has been prepared on the basis of a number of assumptions which may prove to be incorrect. This presentation should not be relied upon as a recommendation or forecast by PT. Dharma Satya Nusantara Tbk. Nothing in this release should be construed as either an offer to buy or sell or a solicitation of an offer to buy or sell shares in any jurisdiction.

PLANTED AREA

Planted

(as of December 2015) (ha)

Average Age (yr)

Planted Hectarage

Matured (ha) Immatured (ha) Total Planted

(ha)

Nucleus 7.5 51,783 17,508 69,291

Plasma 3.3 6,261 14,532 20,792

Total 6.6 58,044 32,039 90,083

As of December 2015, the co pa y s total planted area, including nucleus and plasma, reached 90,083 hectares, with average age of 6.6 years.

Referensi

Dokumen terkait

Unit Layanan Pengadaan Barang / Jasa Kabupaten Muara Enim Pokja Pengadaan Barang Kelompok II yang dibentuk berdasarkan Keputusan Kepala Unit Layanan Pengadaan. Barang/Jasa

The professor gave you a two months period to write this research paper because that is the average time it takes for someone to write a well thought-out, well written paper.. If

Pada hari ini, rabu tanggal empat belas bulan Mei tahun dua ribu empat belas, Kelompok Kerja II Unit Layanan Pengadaan Kabupaten Mandailing Natal, Sesuai dengan

Press releases aren’t for customers or consumers they are for reporters, journalists who will use them as a starting point for a larger story or feature.. Write your story as you

Tool # 10 If your paper wasn´t approved by the professor, don´t panic, stay positive, and appeal to some good writing tools that will help you make your writing better. Analyze

[r]

[r]

Pada hari ini Jumat tanggal Dua bulan September Tahun Dua Ribu Enam Belas, kami yang bertanda tangan di bawah ini Pokja Pokja Dinas Dinas Kelautan, Perikanan dan Peternakan