KEGIATAN : : Rehabilitasi/Pemeliharaan Terminal/Pelabuhan
PEKERJAAN : : Pekerjaan Pengaspalan Halaman parkir AKDP dan Jalur bus AKAP, AKDP dan DK LOKASI : : Terminal Bandar Raya Payung Sekaki (BRPS)
KOTA : PEKANBARU
HPS / OE :
Rp
259,608,000.00
TOTAL HARGA TOTAL HARGA PERSENTASE URUTAN KETERANGAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS/ OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 CV. PUTRA INDONESIA 250,355,000.00 250,355,000.00 96.44 1
2 CV. KARYA WARDANA 255,984,000.00 255,984,000.00 98.60 2
3 CV. L O T U S 258,071,000.00 258,071,000.00 99.41 3
4 CV. KENADE 204,900,000.00 - - 4 RAB TIDAK TERLAMPIR
5 CV. SYARIF BROTHER 228,750,000.00 - - 5 RAB TIDAK TERLAMPIR
PANI TI A PENGADAAN BARANG / JASA KOTA PEKANBARU
dto
Pekanbaru, 10 Agustus 2011
REVISI HASIL KOREKSI ARITMATIK
2 NAMA PERUSAHAAN NO