• Tidak ada hasil yang ditemukan

Universitas Gadjah Mada, 2021 Diunduh dari REFERENSI

N/A
N/A
Protected

Academic year: 2021

Membagikan "Universitas Gadjah Mada, 2021 Diunduh dari REFERENSI"

Copied!
5
0
0

Teks penuh

(1)

104

REFERENSI

[1] B. P. D. P. T. Pusat Pengkajian Industri Proses Dan Energi, Outlook Energi Indonesia 2018

Energi Berkelanjutan untuk Transportasi Darat, vol. 91, no. 5. Indonesia: Pusat

Pengkajian Industri Proses dan Energi (PPIPE) Badan Pengkajian dan Penerapan Teknologi (BPPT), 2018.

[2] C. I. Tirta Citradi, “Porsi Batu Bara Naik, Target Energi Baru RI Makin Berat,” CNBC

Indonesia, 2019. [Online]. Available:

https://www.cnbcindonesia.com/news/20200109164206-4-128910/porsi-batu-bara-naik-target-energi-baru-ri-makin-berat.

[3] RUEN, “Perpres 22/2017_RUEN,” p. 6, 2017.

[4] H. Berchmans, S. Suaib, I. Agustina, R. Panjaitan, and Winne, “Panduan Penghematan Energi di Gedung Pemerintah,” no. 13, p. 100, 2014.

[5] IESR, “Indonesia Clean Energy Outlook: Tracking Progress and Review of Clean Energy Development in Indonesia,” Jakarta Inst. Essent. Serv. Reform (IESR), December 2019, pp. 1–72, 2019.

[6] K. ESDM, “Matahari Untuk PLTS di Indonesia,” http://www.litbang.esdm.go.id. [Online]. Available: https://www.esdm.go.id/id/media-center/arsip-berita/matahari-untuk-plts-di-indonesia.

[7] P. M. Dauenhauer, D. Frame, A. Eales, S. Strachan, S. Galloway, and H. Buckland, “Sustainability evaluation of community-based, solar photovoltaic projects in Malawi,”

Energy. Sustain. Soc., vol. 10, no. 1, 2020.

[8] R. Budiarto and A. Prasetya, Energi Surya untuk Komunitas-Meningkatkan Produktivitas

Masyarakat Pedesaan Melalui Energi Terbarukan, no. March 2018. Yogyakarta:

Kemala, 2017.

[9] S. S. Mohammad Hafidz ;, “Perancangan Dan Analisis Pembangkit Listrik Tenaga Surya Kapasitas 10 Mw on Grid Di Yogyakarta,” Jur. Tek. Elektro, Sekol. Tinggi Tek. PLN, vol. 7, no. JURNAL ENERGI & KELISTRIKAN VOL. 7 NO. 1, JANUARI-MEI 2015, p. 49, 2015.

[10] R. S. G. C. Rangkuti, “Perencanaan Pembangkit Listrik Tenaga Surya di Atap Gedung Harry Hartanto Universitas Trisakti,” Semin. Nas. Cendikiawan 2016, pp. 1–11, 2016. [11] T. Salameh, M. E. H. Assad, M. Tawalbeh, C. Ghenai, A. Merabet, and H. F. Öztop,

“Analysis of cooling load on commercial building in UAE climate using building integrated photovoltaic façade system,” Sol. Energy, vol. 199, no. February, pp. 617– 629, 2020.

[12] E. A. Karuniawan, “SIMULASI DAN ANALISIS PLTS SISTEM ON-GRID PADA GEDUNG PUSAT STUDI LINGKUNGAN HIDUP DENGAN SKEMA KEBIJAKAN PLTS ATAP,” Yogyakarta, 2019.

[13] J. F. Armendariz-Lopez, A. Luna-Leon, M. E. Gonzalez-Trevizo, A. P. Arena-Granados, and G. Bojorquez-Morales, “Life cycle cost of photovoltaic technologies in commercial buildings in Baja California, Mexico,” Renew. Energy, vol. 87, pp. 564–571, 2016. [14] R. Avesta, A. D. Putri, R. A. Hanifah, N. A. Hidayat, and M. D. Dunggio, “Strategi Desain

Bukaan terhadap Pencahayaan Alami untuk Menunjang Konsep Bangunan Hemat Energi pada Rusunawa Jatinegara Barat,” J. Rekayasa Hijau, vol. 1, no. 2, pp. 124–135, 2017. Universitas Gadjah Mada, 2021 | Diunduh dari http://etd.repository.ugm.ac.id/

(2)

105

[15] R. Bhandari, L. G. Saptalena, and W. Kusch, “Sustainability assessment of a micro

hydropower plant in Nepal,” Energy. Sustain. Soc., vol. 8, no. 1, p. 3, 2018. [16] I. A. Safitri, “STUDI KELAYAKAN RETROFIT DAN POTENSI,” 2018.

[17] A. Sayed, M. El-Shimy, M. El-Metwally, and M. Elshahed, “Reliability, availability and maintainability analysis for grid-connected solar photovoltaic systems,” Energies, vol. 12, no. 7, 2019.

[18] M. A. Prastia, J. T. Elektro, F. T. Industri, and U. I. Indonesia, “Sistem Monitoring Solar Panel Fakultas Teknologi Industri Universitas Islam Indonesia Menggunakan Ni-Myrio Dan Labview,” 2018.

[19] A. Kadir, Energi Sumberdaya, Inovasi, Tenaga Listrik dan Potensi Ekonomi. Salemba 4, Jakarta: Universitas Indonesia Press, 2010.

[20] U. . D. O. Energy, “Solar Radiation Basics.” [Online]. Available: https://www.energy.gov/eere/solar/articles/solar-radiation-basics. [21] Ipb, “Energi dan Listrik Pertanian.” [Online]. Available:

http://web.ipb.ac.id/~tepfteta/elearning/media/Energi dan Listrik Pertanian/MATERI WEB ELP/Bab II ENERGI SURYA/index.htm.

[22] Dosenpendidikan, “Akibat Revolusi Bumi.” [Online]. Available: https://www.dosenpendidikan.co.id/akibat-revolusi-bumi/.

[23] Y. Siregar and H. Helmi, “Daya Output Optimal Pada Jenis Solar cell Monocrystalline dan Polycrystalline,” no. 9, 2015.

[24] U. Udayana, “PEMBANGKIT LISTRIK TENAGA SURYA,” no. April, pp. 1–46, 2009. [25] D. S.-K. Ting, Lecture Notes On Engineering Human Thermal Comfort. Singapore ;

Hackensack, NJ : World Scientific Publishing Co. Pte. Ltd., [2020] ©2020, 2020. [26] Homer, “Direct Normal Irradiance (DNI).” [Online]. Available:

https://www.homerenergy.com/products/pro/docs/latest/direct_normal_irradiance_dni.ht ml.

[27] “Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) - PT PLN (Persero).” [Online]. Available: https://web.pln.co.id/stakeholder/ruptl. [Accessed: 26-Jul-2020].

[28] K. E. dan S. D. Mineral, “Kebijakan pemanfaatan pembangkit listrik tenaga surya (plts) atap,” 2020.

[29] I. N. S. Kumara et al., “Peta Jalan Pengembangan PLTS Atap: Menuju Bali Mandiri Energi,” Bali, 2019.

[30] J. Ascencio-Vásquez, K. Brecl, and M. Topič, “Methodology of

Köppen-Geiger-Photovoltaic climate classification and implications to worldwide mapping of PV system performance,” Sol. Energy, vol. 191, pp. 672–685, Oct. 2019.

[31] A. I. Ramadhan, “Analisis Desain Sistem Pembangkit Listrik Tenaga Surya Kapasitas 50 WP,” Tek. 37 (2), 2016, 59-63, vol. 11, no. 2, pp. 61–78, 2016.

[32] E. Roza and M. Mujirudin, “Perancangan Pembangkit Tenaga Surya Fakultas Teknik UHAMKA,” Ejournal Kaji. Tek. Elektro, vol. 4, no. 1, pp. 16–30, 2019.

[33] Www.photovoltaic-software.com, “Calculation of the solar PV energy ouput of a photovoltaic system,” www.photovoltaic-software.com. [Online]. Available: www.photovoltaic-software.com.

[34] T. Wibowo, “Webinar Nasional Series ‘ Perancangan, Pemilihan Komponen, Universitas Gadjah Mada, 2021 | Diunduh dari http://etd.repository.ugm.ac.id/

(3)

106

Pemasangan,’” 2020, p. 2020.

[35] S. Baschel, E. Koubli, J. Roy, and R. Gottschalg, “Impact of component reliability on large scale photovoltaic systems’ Performance,” Energies, vol. 11, no. 6, 2018.

[36] USAID; LPEM FEB UI, Pembiayaan Pembangkit Listrik Tenaga Surya. 2016. [37] M. Ajar, “Pengantar Teknologi Energi Terbarukan,” Yogyakarta.

[38] N. S. Gunawan, I. N. Satya Kumara, R. Irawati, “Unjuk Kerja Pembangkit Listrik Tenaga Microgrid Unud,” vol. 6, no. 3, pp. 1–9, 2019.

[39] ABB solutions for photovoltaic applications Group, “Technical Application Papers No.10. Photovoltaic plants,” Tech. Appl. Pap., vol. 10, no. 10, p. 107, 2010.

[40] M. E. LLC, “Technical and Economic Feasibility Assessment of a Brightfield Photovoltaic Power Plant at Miramar Landfill: Final Report,” vol. 80401, no. 303.

[41] M. El-Metwally, M. EL-Shimy, M. Elshahed, and A. Sayed, “Detailed Analyses of the Failure and Repair Rates of Wind and Solar- PV Systems for RAM Assessment,” Int.

Conf. Electr. Eng., vol. 11, no. 11, pp. 1–16, 2018.

[42] USAID, “Panduan Studi Kelayakan Pembangkit Listrik Tenaga,” no. 021, 2018. [43] L. Porter, “The Renewable Energy Home Handbook,” p. 82.

[44] K. Vidhia Kumara, I. N. Satya Kumara, and W. G. Ariastina, “Tinjauan Terhadap Plts 24 Kw Atap Gedung Pt Indonesia Power Pesanggaran Bali,” J. SPEKTRUM, vol. 5, no. 2, p. 26, 2018.

[45] D. Maslanka “Solar Geometry Slides.” [Online]. Available: http://www.powerfromthesun.net/book.html.

[46] U. S. E. P. Agency, “Green Power Equivalency Calculator - Calculations and References,”

An official website of the United States government., 2020. [Online]. Available:

https://www.epa.gov/greenpower/green-power-equivalency-calculator-calculations-and-references.

[47] I. B. K. Sugirianta, I. A. . Giriantari, and I. N. S. Kumara, “ANALISA KEEKONOMIAN TARIF LISTRIK PEMBANGKIT LISTRIK TENAGA SURYA 1 MWP BANGLI DENGAN METODE LIFE CYCLE COST,” vol. 15, no. 2, 2016.

[48] N. F. R. ; A. R. Wijaya, “Analisis Kelayakan Perpanjangan masa operasi PLTU dengan alternatif pembangunan unit pembangkit baru atau melanjutkan unit pembangkit yang telah ada,” Yogyakarta, 2018.

[49] S. Kanata, “Kajian Ekonomis Pembangkit Hybrid Renewable Energi Menuju Desa Mandiri Energi di Kabupaten Bone-Bolango,” J. Rekayasa Elektr., vol. 11, no. 3, 2015.

[50] D. O. O. I. ENERGY, “Levelized Cost of Energy (LCOE).”

[51] EIA, “Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2020,” Us Eia Lcoe, no. February, pp. 1–20, 2020.

[52] D. A. M. Pujantoro, “Levelized Cost of Electricity di Indonesia Saat ini,” Jakarta Selatan, 2019.

[53] R. Fu, D. Feldman, and R. Margolis, “U.S. Solar Photovoltaic System Cost Benchmark: Q1 2018, NREL/TP-6A20-72399.,” Tech. Rep. NREL/TP-6A20-72399, no. November, 2018.

[54] D. Bioenergi and P. Riau, “ESDM untuk Kesejahteraan Rakyat,” p. 15, 2013. Universitas Gadjah Mada, 2021 | Diunduh dari http://etd.repository.ugm.ac.id/

(4)

107

[55] M. E. D. S. D. M. R. Indonesia, “Permen ESDM No. 19 Tahun 2016 tentang Pembelian

Tenaga Listrik dari PLTS Fotovoltaik oleh PT. PLN (Persero).pdf.” KESDM, Indonesia. [56] E. Hamdi, “Indonesia ’ s Solar Policies,” no. February, pp. 1–30, 2019.

[57] Z. Kusumawanto, Arif;B. Astuti, Arsitektur Hijau Dalam Inovasi Kota. Yogyakarta: UGM press, 2014.

[58] IAEA, “Energy Indicators for Sustainable Development: Country Studies,” p. 474, 2007. [59] E. Terrado, A. Cabraal, and I. Mukherjee, “Operational Guidance for World Bank Group

Staff - Designing Sustainable Off-Grid Rural Electrification Projects: Principles and Practices,” Res. Work. Pap., no. November, p. 32, 2008.

[60] E. S. H, B. Untung, P. Studi, T. Perkapalan, F. Teknik, and U. Diponegoro, “Analisa Keandalan Sistem Bahan Bakar Motor Induk Pada Km. Leuser,” Kapal, vol. 5, no. 2, pp. 123–135, 2012.

[61] Priyanta, “KEANDALAN DAN PERAWATAN,” Surabaya.

[62] G. B. C. INDONESIA, “Rating Tools,” GREEN BUILDING COUNCIL INDONESIA, 2020. [Online]. Available: http://www.gbcindonesia.org/greenship.

[63] GBCI, “Green Building Council Indonesia 1,” pp. 1–40, 2018. [64] I. R. E. Agency, Renewable Power Generation Costs in 2018. 2018.

[65] M. Chandel, G. D. Agrawal, S. Mathur, and A. Mathur, “Techno-economic analysis of solar photovoltaic power plant for garment zone of Jaipur city,” Case Stud. Therm. Eng., vol. 2, pp. 1–7, 2014.

[66] S. M. A. Solar and T. Ag, “Planning Guidelines The System Solution for Greater Independence Table of Contents.”

[67] R. Budiarto, Kebijakan Energi, vol. 64. 2014.

[68] C. Trimble, “Sketchup,” Trimble. [Online]. Available: https://www.sketchup.com/products/sketchup-pro.

[69] JRC, “Data sources and calculation methods,” An official website of the European Union, 2020. [Online]. Available: https://ec.europa.eu/jrc/en/PVGIS/docs/methods.

[70] SolarGIS, “Solar Radiation Modeling.” 2019.

[71] B. Ramadhani, “Instalasi Pembangkit Listrik Tenaga Surya Dos&Don’ts,” Jakarta, 2018. [72] G. Riva, E. ; Foppapedretti, and ; Carla de Carolis, “Energy Efficiency and

Renewables-Supporting Policies in Local Level for Energy,” Compr. Energy Syst., vol. 1–5, pp. 770– 794, 2018.

[73] C. Kim, “Micro-Power System Modeling Using Homer,” 2013.

[74] P. Lillo, L. Ferrer-Martí, Á. Fernández-Baldor, and B. Ramírez, “A new integral management model and evaluation method to enhance sustainability of renewable energy projects for energy and sanitation services,” Energy Sustain. Dev., vol. 29, pp. 1– 12, Dec. 2015.

[75] IEA, “Average annual capacity factors by technology, 2018,” 2020. [Online]. Available: https://www.iea.org/data-and-statistics/charts/average-annual-capacity-factors-by-technology-2018.

[76] A. Arimbawa, S. Kumara, and R. S. Hartati, “Studi Pemanfaatan Catu Daya Hibrida PLTS 3,7 kWp Dan PLN Pada Instalasi Pengolahan Air Limbah Desa Pemecutan Kaja

(5)

108

Denpasar Bali,” Maj. Ilm. Teknol. Elektro, vol. 15, no. 2, pp. 33–38, 2016.

[77] L. Industry, “Monocrystalline, Katalog Len 260 Wp.” . [78] C. S. INC., “CS6K-260/265/270/275P,” 2009.

[79] C. S. Inc, “High Efficiency Poly Module CS3K-290/295/300P,” no. 1, 2015.

[80] S. Ekici and M. A. Kopru, “Investigation of PV system cable losses,” Int. J. Renew. Energy

Res., vol. 7, no. 2, pp. 807–815, 2017.

[81] A. G. Sinica, “PSYCHOLOGICAL READINESS & JOB READINESS TRAINING: MEMBANGUN KESIAPAN SARJANA BARU UNTUK BEKERJA,” vol. 2, no. 01, pp. 229–235, 2017.

[82] P.-O. H. Wikström and K. Treiber, “Situational Theory,” Handb. Criminol. Theory, pp. 415–444, 2015.

[83] B. P. S. K. Wonogiri, “Statistik Ketenagakerjaan Kabupaten Wonogiri Tahun 2018,” 2018. [84] B. P. S. K. Wonogiri, “Indikator Kesejahteraan Rakyat Kabupaten Wonogiri 2018,” 2018. [85] B. P. S. K. Wonogiri, “Kabupaten Wonogiri dalam Angka 2020,” p. 290, 2020.

[86] Köntges M. et al., IEA-PVPS T13-01 2014 Review of Failures of Photovoltaic Modules

Final, no. July. 2014.

[87] G. Zini, C. Mangeant, and J. Merten, “Reliability of large-scale grid-connected photovoltaic systems,” Renew. Energy, vol. 36, no. 9, pp. 2334–2340, 2011. [88] W. E. Vesely, F. F. Goldberg, N. H. Roberts, and D. F. Haasl, “Fault Tree Handbook

(NUREG-0492),” U.S. Nucl. Regul. Com., p. 209, 1981.

[89] A. Colli, “Failure mode and effect analysis for photovoltaic systems,” Renew. Sustain.

Energy Rev., vol. 50, pp. 804–809, 2015.

[90] A. Adrianti and U. Andalas, “Evaluasi keandalan pembangkit listrik tenaga surya yang terhubung ke grid,” no. December, 2019.

[91] R. B. Waghmode, L. Y.; Patil, “an Overview of Fault Tree Analysis ( Fta ) for Reliability Analysis,” J. Eng. Res. Stud., vol. IV, no. March 2013, pp. 06–08, 2016.

[92] C. Nemes, F. Munteanu, M. Rotariu, and D. Astanei, “Availability assessment for grid-connected photovoltaic systems with energy storage,” Proc. 2016 Int. Conf. Expo.

Electr. Power Eng. EPE 2016, no. Epe, pp. 908–911, 2016.

Referensi

Dokumen terkait

Development of the Indonesian and Malaysian Fire Danger Systems (FDRS) Mitigation Adaptation Strategi Global Change.. Springer Science+

Characterization and Management of Karst Drainage System Based on Hydrograph Analysis in Gunung Sewu Karst Area.. Yogyakarta: Fakultas

Identifikasi dan Uji Sensitivitas Bakteri Klebsiella Pneumoniae Terhadap Ciprofloxacin Pada Sputum Penderita Infeksi Saluran Pernafasan Akut di RSUD Wangaya..

Ketentuan lebih lanjut mengenai kewajiban SLO untuk sistem pelanggan PLTS atap, berdasarkan pada kapasitas PLTS atap yang terpasang, dimana PLTS atap dengan kapasitas diatas

Tabel IV.15 Hasil Regresi Linear Berganda menurut Klasifikasi Kemampuan Fiskal .... viii

Tujuan penelitian ini adalah untuk mengetahui prevalensi bakteri ESBL, evaluasi kesesuaian antibiotik definitif beserta prediksi nilai parameter farmakokinetiknya

Ketak merupakan produk hasil hutan bukan kayu (HHBK), dan memiliki nilai ekonomi karena menghasilkan sulur yang digunakan sebagai bahan baku kerajinan anyaman. Ketak

Kajian Metode Object Based Image Analysisi (OBIA) untuk Klasifikasi Penggunaan Lahan pada Citra Multispektral dan Citra Fusi WorldView-2 (Kasus: Sebagian Kota Magelang, Jawa