KEGIATAN :

PENINGKATAN JALAN DAN JEMBATAN (DAK)

PEKERJAAN :

JEMBATAN SUNGAI JERUANG

NO. PAKET :

01

LOKASI :

Kec. Sungai Penuh

KOTA :

Sungai Penuh

HPS/OE Rp 151,515,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. KESA-KESI 120,000,000.00 120,000,000.00 79.20 1 2 CV. ANDIKA 131,480,000.00 131,480,000.00 86.78 2 3 CV. BINTANG PERDANA 132,039,000.00 132,039,000.00 87.15 3 4 CV. MIRA TB 133,333,000.00 133,333,000.00 88.00 4 5 CV. IKHWAN PUTRA 133,639,000.00 133,639,000.00 88.20 5 6 CV. BAGINDO SAID 134,847,000.00 134,847,000.00 89.00 6 7 CV. SHINTA ARISTA 134,848,000.00 134,848,000.00 89.00 7 8 CV. SENI BUDAYA PEMB KERINCI 136,333,600.00 136,333,600.00 89.98 8 9 CV. RIKO LAKSANA 158,350,350.00 158,350,350.00 104.51 9

KEGIATAN :

REHABILITASI/PEMELIHARAAN JALAN

PEKERJAAN :

- Jalan Koto Baru - Kubang - Batas Kota (Lapen)

NO. PAKET :

02

LOKASI :

KEC. PESISIR BUKIT

KOTA :

Sungai Penuh

HPS/OE Rp 181,880,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. MULYA PUTRA 156,200,000.00 156,200,000.00 85.88 1 2 CV. HIKMAH 156,910,000.00 156,910,000.00 86.27 2 3 CV. PRIMA MANDIRI 161,324,000.00 161,324,000.00 88.70 3 4 CV. GUNUNG BUJANG 161,956,000.00 161,956,000.00 89.05 4 5 CV. PANCURAN TUJUH 162,336,000.00 162,336,000.00 89.25 5 6 CV. ANALISA TEKHNIK 162,665,000.00 162,665,000.00 89.44 6 7 CV. RESTI 163,330,000.00 163,330,000.00 89.80 7 8 CV. SERUMPUN 163,656,000.00 163,656,000.00 89.98 8 9 CV. AGIL KONTRAKTOR 163,986,000.00 163,986,000.00 90.16 9 10 CV. VALLAN PUTRA 166,011,000.00 166,011,000.00 91.28 10 11 CV. SULTAN HAMPARAN 167,099,000.00 167,099,000.00 91.87 11 12 CV. PINANG SEBATANG 167,536,000.00 167,536,000.00 92.11 12 13 CV. MUTIARA SEMENANJUNG 169,035,000.00 169,035,000.00 92.94 13 14 CV. TRIO KERINCI 170,718,000.00 170,718,000.00 93.86 14

KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN PERINGKAT

HASIL KOREKSI ARITMATIK

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(2)

KEGIATAN :

REHABILITASI/PEMELIHARAAN JALAN

PEKERJAAN :

- Jalan Koto Bento - Koto Baru (Buka Baru)

NO. PAKET :

03

LOKASI :

KEC. PESISIR BUKIT

KOTA :

Sungai Penuh

HPS/OE Rp 175,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. DUA DARA PERKASA 136,446,000.00 136,446,000.00 77.97 1 2 CV. ADAM MULIA 145,268,000.00 145,268,000.00 83.01 2 3 CV. PINANG INDAH 148,705,000.00 148,705,000.00 84.97 3 4 CV. NANDES NANDOS PUTRA 151,678,000.00 151,678,000.00 86.67 4 5 CV. GIANTARA 152,239,000.00 152,239,000.00 86.99 5 6 CV. ANALISA TEKNIK 156,467,000.00 156,467,000.00 89.41 6 7 CV. KIBAR KERINCI KONSTRUKSI 157,053,000.00 157,053,000.00 89.74 7 8 CV. MUTIARA SEMENANJUNG 162,653,000.00 162,653,000.00 92.94 8

KEGIATAN :

REHABILITASI/PEMELIHARAAN JALAN

PEKERJAAN :

- Tembok Penahan Jalan Desa Sungai Jernih - Sungai Jeruang

NO. PAKET :

04

LOKASI :

KEC. SUNGAI PENUH

KOTA :

Sungai Penuh

HPS/OE Rp 180,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. RIKO LAKSANA 143,845,700.00 143,845,700.00 79.91 1 2 CV. MULYA PUTRA 154,791,000.00 154,791,000.00 86.00 2 3 CV. ADE PUTRI 154,800,000.00 154,800,000.00 86.00 3 4 CV. TIGA SAUDARA ABADI 156,266,000.00 156,266,000.00 86.81 4 5 CV. WIRASTA 157,066,000.00 157,066,000.00 87.26 5 6 CV. BINTANG PERDANA 157,177,000.00 157,177,000.00 87.32 6 7 CV. SURYA WISESAPRATAMA 157,263,000.00 157,263,000.00 87.37 7 8 CV. MERANGIN PUTRA 157,875,000.00 157,875,000.00 87.71 8 9 CV. MONICA 158,398,000.00 158,398,000.00 88.00 9 10 CV. PANDAN MANGURAI 159,480,100.00 159,480,100.00 88.60 10 11 CV. TITIAN SAKTI 160,091,000.00 160,091,000.00 88.94 11 12 CV. BINTANG SAKTI 160,503,000.00 160,503,000.00 89.17 12 13 CV. EMAS PERMATA BERLIAN 161,626,000.00 161,626,000.00 89.79 13 14 CV. KARYA GUNA 162,261,100.00 162,261,100.00 90.15 14 15 CV. SENI BUDAYA PEMBANGUNAN KERINCI 165,650,650.00 165,650,650.00 92.03 15

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(3)

KEGIATAN :

REHABILITASI/PEMELIHARAAN JALAN

PEKERJAAN :

- Jembatan Sungai Jernih

NO. PAKET :

05

LOKASI :

Kec. Sungai Penuh

KOTA :

Sungai Penuh

HPS/OE Rp 120,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. TIGA SAUDARA ABADI 99,872,000.00 99,872,000.00 83.23 1 2 CV. KESA KESI 100,000,000.00 100,000,000.00 83.33 2 3 CV. WIRASTA 100,817,000.00 100,817,000.00 84.01 3 4 CV. IKHWAN PUTRA 105,053,000.00 105,053,000.00 87.54 4 5 CV. KARYA PUTRA PERDANA 105,064,000.00 105,064,000.00 87.55 5 6 CV. TAMAN KERINCI SEBLAT 105,603,000.00 105,603,000.00 88.00 6 7 CV. BAGINDO SAID 106,723,000.00 106,723,000.00 88.94 7 8 CV. MIRA TB 108,000,000.00 108,000,000.00 90.00 8 9 CV. SHINTA ARISTA 109,200,000.00 109,200,000.00 91.00 9

KEGIATAN :

Kegiatan Rehabilitasi Sedang/Berat Rumah Gedung Kantor

PEKERJAAN :

- Pembangunan Kantor Camat Kumun Debai (Lanjutan)

NO. PAKET :

06

LOKASI :

KEC. KUMUN DEBAI

KOTA :

Sungai Penuh

HPS/OE Rp 150,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. MITRA UTAMA 130,335,000.00 130,335,000.00 86.89 1 2 CV. DIAN INSANI MAKMUR 131,252,000.00 131,252,000.00 87.50 2 3 CV. MELLINEA SUKSES 131,907,000.00 131,907,000.00 87.94 3 4 CV. PUTRI SUMUR TUJUH 139,137,000.00 139,137,000.00 92.76 4

KEGIATAN :

Kegiatan Rehabilitasi Sedang/Berat Rumah Gedung Kantor

PEKERJAAN :

- Pembangunan Pos Lantas

NO. PAKET :

07

LOKASI :

Kec. Sungai Penuh

KOTA :

Sungai Penuh

HPS/OE Rp 191,200,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. REHAN & ARIQ 144,799,000.00 144,799,000.00 75.73 1 2 CV. MILLENIA SUKSES 168,143,000.00 168,143,000.00 87.94 2 3 CV. KARYA GUNA 170,373,000.00 170,373,000.00 89.11 3 4 CV. ANDRE PUTRA 175,000,000.00 175,000,000.00 91.53 4 5 CV. ADRIAN PRATAMA 175,050,000.00 175,050,000.00 91.55 5 6 CV. TRI PUTRA 175,100,000.00 175,100,000.00 91.58 6 7 CV. SULITA 175,862,000.00 175,862,000.00 91.98 7 8 CV. KARYA NAN TONGGA 176,999,000.00 176,999,000.00 92.57 8 9 CV. TERUSAN JAYA 190,052,000.00 190,052,000.00 99.40 9 10 CV. PAJAYE MANDIRI 190,327,000.00 190,327,000.00 99.54 10

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(4)

KEGIATAN :

Kegiatan Rehabilitasi Sedang/Berat Rumah Gedung Kantor

PEKERJAAN :

- Pembangunan Kantor Camat Tanah Kampung (Lanjutan)

NO. PAKET :

08

LOKASI :

KEC. TANAH KAMPUNG

KOTA :

Sungai Penuh

HPS/OE Rp 150,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. ROMENJA 131,244,000.00 131,244,000.00 87.50 1 2 CV. DIAN INSANI MAKMUR 131,250,000.00 131,250,000.00 87.50 2 3 CV. PENDANG SAKTI 131,915,000.00 131,915,000.00 87.94 3 4 CV. LAPAN LAPAN 132,000,000.00 132,000,000.00 88.00 4 5 CV. BUMI INDAH 133,400,000.00 133,400,000.00 88.93 5 6 CV. KIBAR MENTARI KERINCI 134,120,000.00 134,120,000.00 89.41 6 7 CV. TAMULI JAYA 134,508,000.00 134,508,000.00 89.67 7 8 CV. SULTAN HAMPARAN 135,278,000.00 135,278,000.00 90.19 8 9 CV. DAYA MITRA PERKASA 136,350,000.00 136,350,000.00 90.90 9

KEGIATAN :

Kegiatan Rehabilitasi Sedang/Berat Rumah Gedung Kantor

PEKERJAAN :

- Pembangunan Kantor Camat Pesisir Bukit (Lanjutan)

NO. PAKET :

09

LOKASI :

KEC. PESISIR BUKIT

KOTA :

Sungai Penuh

HPS/OE Rp 150,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. LESTARI AGRO PERMAI 130,395,000.00 130,395,000.00 86.93 1 2 CV. INDRA KARLI 132,676,000.00 132,676,000.00 88.45 2 3 CV. DEMARERA 134,975,000.00 134,975,000.00 89.98 3 4 CV. DEA PEMBANGUNAN 135,000,000.00 135,000,000.00 90.00 4 5 CV. BHAKTI BERSAMA 136,500,000.00 136,500,000.00 91.00 5 6 CV. WAFINDO PRATAMA 136,549,000.00 136,549,000.00 91.03 6 7 CV. KIBAR MENTARI KERINCI 137,370,000.00 137,370,000.00 91.58 7 8 CV. ADRIAN PRATAMA 137,380,000.00 137,380,000.00 91.59 8 9 CV. TRI PUTRA 137,390,000.00 137,390,000.00 91.59 9 10 CV. IKHWAN PUTRA 137,670,000.00 137,670,000.00 91.78 10 11 CV. INDRA JAYA 138,074,000.00 138,074,000.00 92.05 11

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(5)

KEGIATAN :

Kegiatan Rehabilitasi/Pembangunan Jaringan Irigasi (DAK)

PEKERJAAN : - D.I Sungai Koto Dua

NO. PAKET :

10

LOKASI :

KEC. PESISIR BUKIT

KOTA :

Sungai Penuh

HPS/OE Rp 110,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. ALGI PUTRA 94,585,900.00 94,585,900.00 85.99 1 2 CV. BATU SERBAN 94,600,000.00 94,600,000.00 86.00 2 3 CV. DEMARERA 96,250,000.00 96,250,000.00 87.50 3 4 CV. PUTRA UTAMA 96,654,000.00 96,654,000.00 87.87 4 5 CV. DIAN INSANI MAKMUR 97,797,000.00 97,797,000.00 88.91 5 6 CV. INDAH RAHMAN 98,420,000.00 98,420,000.00 89.47 6 7 CV. IRVAN MAULANA 99,500,000.00 99,500,000.00 90.45 7 8 CV. WAHYU TRI UTAMA 100,416,000.00 100,416,000.00 91.29 8

KEGIATAN :

Kegiatan Rehabilitasi/Pembangunan Jaringan Irigasi (DAK)

PEKERJAAN : - D.I Sungai Liuk

NO. PAKET :

11

LOKASI :

KEC. PESISIR BUKIT

KOTA :

Sungai Penuh

HPS/OE Rp 200,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. BHAKTI BERSAMA 166,000,000.00 166,000,000.00 83.00 1 2 CV. HIKMAH 171,504,000.00 171,504,000.00 85.75 2 3 CV. ZS KONTRAKTOR 172,060,000.00 172,060,000.00 86.03 3 4 CV. YOGA INDAH 173,840,000.00 173,840,000.00 86.92 4 5 CV. SULTAN HAMPARAN 174,037,000.00 174,037,000.00 87.02 5 6 CV. PINANG SEBATANG 174,189,000.00 174,189,000.00 87.09 6 7 CV. TRI PUTRA 174,294,000.00 174,294,000.00 87.15 7 8 CV. GELORA BANGUN UTAMA 175,175,000.00 175,175,000.00 87.59 8 9 CV. PUTRA MAULANA 175,899,000.00 175,899,000.00 87.95 9 10 CV. PUTRI KEMBAR 175,950,000.00 175,950,000.00 87.98 10 11 CV. INDAH RAHMAN 175,992,000.00 175,992,000.00 88.00 11 12 CV. VADILLA 176,044,000.00 176,044,000.00 88.02 12 13 CV. DEWI SARTIKA 176,091,000.00 176,091,000.00 88.05 13 14 CV. RENA ARTA MULYA 177,019,000.00 177,019,000.00 88.51 14 15 CV. TEKNIK PERSADA 177,777,000.00 177,777,000.00 88.89 15 16 CV. RESTI 179,949,000.00 179,949,000.00 89.97 16 17 CV. PUSAKA 185,988,000.00 185,988,000.00 92.99 17 18 CV. INDIRA 518,988,000.00 518,988,000.00 259.49 18

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(6)

KEGIATAN :

Kegiatan Rehabilitasi/Pembangunan Jaringan Irigasi (DAK)

PEKERJAAN : - D.I Simpang Tiga Rawang

NO. PAKET :

12

LOKASI :

KEC. HAMPARAN RAWANG

KOTA :

Sungai Penuh

HPS/OE Rp 110,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. VILA DUTA 95,000,000.00 95,000,000.00 86.36 1 2 CV. TANAH SABINGKEH 96,796,000.00 96,796,000.00 88.00 2 3 CV. GEMA PUTRA HAMPARAN 96,905,000.00 96,905,000.00 88.10 3 4 CV. PGT 97,706,000.00 97,706,000.00 88.82 4 5 CV. IRVAN MAULANA 98,350,000.00 98,350,000.00 89.41 5 6 CV. GUNUNG BUJANG 98,356,000.00 98,356,000.00 89.41 6 7 CV. YOGA INDAH 98,899,000.00 98,899,000.00 89.91 7 8 CV. PRIMA MANDIRI 98,923,000.00 98,923,000.00 89.93 8 9 CV. UDO NANGGALO 102,846,000.00 102,846,000.00 93.50 9

KEGIATAN :

Kegiatan Rehabilitasi/Pembangunan Jaringan Irigasi (DAK)

PEKERJAAN : - D.I Koto Baru

NO. PAKET :

13

LOKASI :

KEC. PESISIR BUKIT

KOTA :

Sungai Penuh

HPS/OE Rp 110,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. PUTRI AYU 92,428,000.00 92,428,000.00 84.03 1 2 CV. LESTARI ARGO PERMAI 95,691,000.00 95,691,000.00 86.99 2 3 CV. TRIO KERINCI 96,608,000.00 96,608,000.00 87.83 3 4 CV. PGT 97,514,000.00 97,514,000.00 88.65 4 5 CV. PANCURAN TUJUH 97,609,000.00 97,609,000.00 88.74 5 6 CV. RESTI 98,866,000.00 98,866,000.00 89.88 6 7 CV. UDO NANGGALO 103,337,000.00 103,337,000.00 93.94 7

KEGIATAN :

Kegiatan Rehabilitasi/Pembangunan Jaringan Irigasi (DAK)

PEKERJAAN : - D.I Batang Bungkal

NO. PAKET :

14

LOKASI :

KEC. SUNGAI PENUH

KOTA :

Sungai Penuh

HPS/OE Rp 138,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. VADHILA 118,567,000.00 118,567,000.00 85.92 1 2 CV. TITIAN SAKTI 121,363,000.00 121,363,000.00 87.94 2 3 CV. KARYA GUNA 121,367,000.00 121,367,000.00 87.95 3 4 CV. EKA KARSA NUGRAHA 123,513,000.00 123,513,000.00 89.50 4 5 CV. MITRA RAYA 123,600,000.00 123,600,000.00 89.57 5

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

KET

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

(7)

KEGIATAN :

Kegiatan Rehabilitasi/Pembangunan Jaringan Irigasi (DAK)

PEKERJAAN : - D.I Dusun Baru

NO. PAKET :

15

LOKASI :

KEC. SUNGAI PENUH

KOTA :

Sungai Penuh

HPS/OE Rp 128,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. VILLA DUTA 105,000,000.00 105,000,000.00 82.03 1 2 CV. OPCYA JAYA 108,003,000.00 108,003,000.00 84.38 2 3 CV. BIRO TEKHNIK 110,037,000.00 110,037,000.00 85.97 3 4 CV. SITO PRATAMA 110,268,000.00 110,268,000.00 86.15 4 5 CV. TITIAN SAKTI 113,038,000.00 113,038,000.00 88.31 5 6 CV. PUTRI INDRA JAYA 113,406,000.00 113,406,000.00 88.60 6 7 CV. KALIMAS JAYA 113,408,000.00 113,408,000.00 88.60 7 8 CV. KRESHNA DWIPA 113,664,000.00 113,664,000.00 88.80 8 9 CV. SERUMPUN 113,798,000.00 113,798,000.00 88.90 9 10 CV. TRYOWIKA PUTRA 113,920,000.00 113,920,000.00 89.00 10 11 CV. SURYA WISESAPRATAMA 115,000,000.00 115,000,000.00 89.84 11 12 CV. UDO NANGGALO 119,092,000.00 119,092,000.00 93.04 12

KEGIATAN :

Kegiatan Rehabilitasi/Pembangunan Jaringan Irigasi (DAK)

PEKERJAAN : - D.I Sungai Kumun Hilir

NO. PAKET :

16

LOKASI :

KEC. KUMUN DEBAI

KOTA :

Sungai Penuh

HPS/OE Rp 110,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. IKRAM 93,097,000.00 93,097,000.00 84.63 1 2 CV. LEOSA ADI UTAMA 93,102,000.00 93,102,000.00 84.64 2 3 CV. MITRA UTAMA 95,129,000.00 95,129,000.00 86.48 3 4 CV. MULTI MULYA 96,590,000.00 96,590,000.00 87.81 4 5 CV. NAIFA TIRTA PERSADA 96,862,000.00 96,862,000.00 88.06 5 6 CV. PUTRI INDRA JAYA 97,557,000.00 97,557,000.00 88.69 6 7 CV. PUTRI AIR TERJUN 100,100,000.00 100,100,000.00 91.00 7 8 CV. SINAR PEMBANGUNAN KERINCI 100,430,000.00 100,430,000.00 91.30 8 9 CV. HANDAL DAYA LAKSANA 100,542,000.00 100,542,000.00 91.40 9 10 CV. PUTRI BERKAT ILAHI 100,650,000.00 100,650,000.00 91.50 10 11 CV. GUSTI SAPTA 102,044,000.00 102,044,000.00 92.77 11

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(8)

KEGIATAN :

Kegiatan Rehabilitasi/Pembangunan Jaringan Irigasi (DAK)

PEKERJAAN : - D.I Koto Tengah

NO. PAKET :

17

LOKASI :

KEC. TANAH KAMPUNG

KOTA :

Sungai Penuh

HPS/OE Rp 165,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. ANDRE PUTRA 140,170,000.00 140,170,000.00 84.95 1 2 CV. BIRO TEKHNIK 141,813,000.00 141,813,000.00 85.95 2 3 CV. VADHILA 142,014,000.00 142,014,000.00 86.07 3 4 CV. NEDIAL ABADI 142,423,000.00 142,423,000.00 86.32 4 5 CV. PENDANG SAKTI 143,121,000.00 143,121,000.00 86.74 5 6 CV. ROMENJA 143,959,000.00 143,959,000.00 87.25 6 7 CV. TANAH SABINGKEH 145,190,000.00 145,190,000.00 87.99 7 8 CV. DAYA MITRA PERKASA 145,916,000.00 145,916,000.00 88.43 8 9 CV. LAPAN LAPAN 146,011,000.00 146,011,000.00 88.49 9 10 CV. KALI MAS JAYA 146,190,000.00 146,190,000.00 88.60 10 11 CV. KRESHNA DWIPA 146,520,000.00 146,520,000.00 88.80 11 12 CV. TAMULI JAYA 146,900,000.00 146,900,000.00 89.03 12 13 CV. TRYOWIKA PUTRA 147,015,000.00 147,015,000.00 89.10 13 14 CV. SULTAN HAMPARAN 147,136,000.00 147,136,000.00 89.17 14 15 CV. WAHYU TRI UTAMA 149,545,000.00 149,545,000.00 90.63 15 16 CV. REHAN & ARYQ 180,048,000.00 180,048,000.00 109.12 16

KEGIATAN :

Kegiatan Pelaksanaan Normalisasi Saluran Sungai

PEKERJAAN : - Sungai Air Jernih (Tembok Penahan Tebing)

NO. PAKET :

18

LOKASI :

KEC. SUNGAI PENUH

KOTA :

Sungai Penuh

HPS/OE Rp 200,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. ALAM BATUAH 169,485,000.00 169,485,000.00 84.74 1 2 CV. PUTRI NANA 169,752,000.00 169,752,000.00 84.88 2 3 CV. ADE PUTRI 171,000,000.00 171,000,000.00 85.50 3 4 CV. TITIAN SAKTI 172,016,000.00 172,016,000.00 86.01 4 5 CV. TIGA SAUDARA ABADI 174,790,000.00 174,790,000.00 87.40 5 6 CV. SURYA WISESAPRATAMA 175,000,000.00 175,000,000.00 87.50 6 7 CV. MERANGIN PUTRA 175,525,000.00 175,525,000.00 87.76 7 8 CV. KESA KESI 175,958,000.00 175,958,000.00 87.98 8 9 CV. CIPTA PESONA KERINCI 176,810,000.00 176,810,000.00 88.41 9 10 CV. EMAS PERMATA BERLIAN 179,721,000.00 179,721,000.00 89.86 10 11 CV. KIBAR KERINCI KONSTRUKSI 179,846,000.00 179,846,000.00 89.92 11

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(9)

KEGIATAN :

Kegiatan Pelaksanaan Normalisasi Saluran Sungai

PEKERJAAN : - Sungai Batang Merao Ds. Pinggir Air (Tembok Penahan Banjir)

NO. PAKET :

19

LOKASI :

KEC. KUMUN DEBAI

KOTA :

Sungai Penuh

HPS/OE Rp 200,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. PGT 171,686,000.00 171,686,000.00 85.84 1 2 CV. PINANG INDAH 171,777,000.00 171,777,000.00 85.89 2 3 CV. BUKIT SIRIH 179,529,000.00 179,529,000.00 89.76 3 4 CV. KIBAR KERINCI KONSTRUKSI 179,846,000.00 179,846,000.00 89.92 4 5 CV. LENTERA TANJUNG 185,936,000.00 185,936,000.00 92.97 5

KEGIATAN :

Kegiatan Pelaksanaan Normalisasi Saluran Sungai

PEKERJAAN : - Sungai Pengasah (Tembok Penahan Tebing)

NO. PAKET :

20

LOKASI :

KEC. PESISIR BUKIT

KOTA :

Sungai Penuh

HPS/OE Rp 200,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. PINANG INDAH 170,021,000.00 170,021,000.00 85.01 1 2 CV. ADE PUTRI 171,496,000.00 171,496,000.00 85.75 2 3 CV. INDAH RAHMAN 175,817,000.00 175,817,000.00 87.91 3 4 CV. TAMARA JAYA 175,895,000.00 175,895,000.00 87.95 4 5 CV. PUTRI KEMBAR 175,950,000.00 175,950,000.00 87.98 5 6 CV. VADHILA 175,984,000.00 175,984,000.00 87.99 6 7 CV. DEWI SARTIKA 176,056,000.00 176,056,000.00 88.03 7 8 CV. PUTRA UTAMA 176,358,000.00 176,358,000.00 88.18 8 9 CV. RESTI 179,703,000.00 179,703,000.00 89.85 9

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(10)

KEGIATAN :

Kegiatan Optimalisasi Fungsi Jaringan Irigasi yang Telah Dibangun

PEKERJAAN : - D.I Taruko

NO. PAKET :

21

LOKASI :

KEC. SUNGAI PENUH

KOTA :

Sungai Penuh

HPS/OE Rp 200,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. SINAR PEMBANGUNAN KERINCI 171,795,000.00 171,795,000.00 85.90 1 2 CV. PUTRI AIR TERJUN 172,858,000.00 172,858,000.00 86.43 2 3 CV. DATA 173,186,000.00 173,186,000.00 86.59 3 4 CV. TIGA SAUDARA ABADI 173,920,000.00 173,920,000.00 86.96 4 5 CV. ADRIAN PRATAMA 174,500,000.00 174,500,000.00 87.25 5 6 CV. SURYA WISESAPRATAMA 175,000,000.00 175,000,000.00 87.50 6 7 CV. INDRA KARLI 175,282,000.00 175,282,000.00 87.64 7 8 CV. NAILA 175,443,000.00 175,443,000.00 87.72 8 9 CV. TITIAN SAKTI 175,659,000.00 175,659,000.00 87.83 9 10 CV. FADHIL PUTRA 175,768,000.00 175,768,000.00 87.88 10 11 CV. SINTA DERIMA 175,951,000.00 175,951,000.00 87.98 11 12 CV. MILLENIA SUKSES 176,178,000.00 176,178,000.00 88.09 12 13 CV. RENA ARTHA MULYA 177,000,000.00 177,000,000.00 88.50 13 14 CV. EKA KARSA NUGRAHA 177,007,000.00 177,007,000.00 88.50 14 15 CV. SERUMPUN 177,780,000.00 177,780,000.00 88.89 15 16 CV. MITRA RAYA 180,000,000.00 180,000,000.00 90.00 16

KEGIATAN :

Kegiatan Optimalisasi Fungsi Jaringan Irigasi yang Telah Dibangun

PEKERJAAN : - D.I Lawang Agung

NO. PAKET :

22

LOKASI :

KEC. SUNGAI PENUH

KOTA :

Sungai Penuh

HPS/OE Rp 200,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. HIKMAH 170,818,000.00 170,818,000.00 85.41 1 2 CV. MULYA PUTRA 171,383,000.00 171,383,000.00 85.69 2 3 CV. LEOSA ADI UTAMA 171,741,000.00 171,741,000.00 85.87 3 4 CV. IKRAM 171,742,000.00 171,742,000.00 85.87 4 5 CV. Z.S KONTRAKTOR 172,195,000.00 172,195,000.00 86.10 5 6 CV. DATA 173,182,000.00 173,182,000.00 86.59 6 7 CV. PAJAYE MANDIRI 173,226,000.00 173,226,000.00 86.61 7 8 CV. TERUSAN JAYA 174,075,000.00 174,075,000.00 87.04 8 9 CV. SITO PRATAMA 174,845,000.00 174,845,000.00 87.42 9 10 CV. BINTANG UTAMA 175,874,000.00 175,874,000.00 87.94 10 11 CV. SURYA WISESAPRATAMA 175,999,000.00 175,999,000.00 88.00 11 12 CV. CIPTA PESONA KERINCI 176,919,000.00 176,919,000.00 88.46 12 13 CV. KESA KESI 176,974,000.00 176,974,000.00 88.49 13 14 CV. RENA ARTHA MULYA 176,979,000.00 176,979,000.00 88.49 14 15 CV. EKA KARSA NUGRAHA 177,008,000.00 177,008,000.00 88.50 15 16 CV. INDIRA 177,139,000.00 177,139,000.00 88.57 16 17 CV. INDRA JAYA 177,217,000.00 177,217,000.00 88.61 17 18 CV. NAILA 177,660,000.00 177,660,000.00 88.83 18 19 CV. TOHA PUTRA 178,019,000.00 178,019,000.00 89.01 19 20 CV. BINTAN LESTARI 179,166,000.00 179,166,000.00 89.58 20 21 CV. EMAS PERMATA BERLIAN 179,234,000.00 179,234,000.00 89.62 21 22 CV. DWI MITRA PRIMA 179,500,000.00 179,500,000.00 89.75 22 23 CV. MULYA SARI 179,940,000.00 179,940,000.00 89.97 23 24 CV. SUTRA KERINCI 181,960,000.00 181,960,000.00 90.98 24 25 CV. TECHNICS 182,116,000.00 182,116,000.00 91.06 25 26 CV. EXPO 66 182,281,000.00 182,281,000.00 91.14 26

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(11)

KEGIATAN :

Kegiatan Optimalisasi Fungsi Jaringan Irigasi yang Telah Dibangun

PEKERJAAN : - D.I Koto Teluk

NO. PAKET :

23

LOKASI :

KEC. KUMUN DEBAI

KOTA :

Sungai Penuh

HPS/OE Rp 200,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. PGT 171,793,000.00 171,793,000.00 85.90 1 2 CV. VADHILA 172,040,000.00 172,040,000.00 86.02 2 3 CV. MITRA UTAMA 172,893,000.00 172,893,000.00 86.45 3 4 CV. MULTI MULYA 173,113,000.00 173,113,000.00 86.56 4 5 CV. Z.S. KONTRAKTOR 173,182,000.00 173,182,000.00 86.59 5 6 CV. DATA 173,360,000.00 173,360,000.00 86.68 6 7 CV. YOGA INDAH 173,410,000.00 173,410,000.00 86.71 7 8 CV. AMANDA 174,008,000.00 174,008,000.00 87.00 8 9 CV. HANDAL DAYA LAKSANA 174,997,000.00 174,997,000.00 87.50 9 10 CV. TERUSAN JAYA 175,019,000.00 175,019,000.00 87.51 10 11 CV. ADRIAN PRATAMA 175,100,000.00 175,100,000.00 87.55 11 12 CV. LESTARI PAKU BUMI 175,384,000.00 175,384,000.00 87.69 12 13 CV. ELANG GUNUNG 175,557,000.00 175,557,000.00 87.78 13 14 CV. PINANG SEBATANG 178,015,000.00 178,015,000.00 89.01 14 15 CV. TAMULI JAYA 178,695,000.00 178,695,000.00 89.35 15 16 CV. SULTAN HAMPARAN 178,735,000.00 178,735,000.00 89.37 16 17 CV. BINTAN LESTARI 179,500,000.00 179,500,000.00 89.75 17 18 CV. TOHA PUTRA 190,008,000.00 190,008,000.00 95.00 18 19 CV. CIPTA PESONA KERINCI 190,368,000.00 190,368,000.00 95.18 19 20 CV. INDIRA 190,804,000.00 190,804,000.00 95.40 20

KEGIATAN :

Kegiatan Optimalisasi Fungsi Jaringan Irigasi yang Telah Dibangun

PEKERJAAN : - D.I Muara Jaya

NO. PAKET :

24

LOKASI :

KEC. KUMUN DEBAI

KOTA :

Sungai Penuh

HPS/OE Rp 200,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. MULYA PUTRA 170,000,000.00 170,000,000.00 85.00 1 2 CV. LEOSA ADI UTAMA 171,741,000.00 171,741,000.00 85.87 2 3 CV. IKRAM 171,742,000.00 171,742,000.00 85.87 3 4 CV. DATA 172,491,000.00 172,491,000.00 86.25 4 5 CV. MITRA UTAMA 173,724,000.00 173,724,000.00 86.86 5 6 CV. HANDAL DAYA LAKSANA 174,892,000.00 174,892,000.00 87.45 6 7 CV. NAIFA TIRTA PERSADA 175,946,000.00 175,946,000.00 87.97 7 8 CV. LIMA PUTRA 176,057,000.00 176,057,000.00 88.03 8 9 CV. PUTRI BERKAT ILAHI 176,894,000.00 176,894,000.00 88.45 9 10 CV. ELANG GUNUNG 177,000,000.00 177,000,000.00 88.50 10 11 CV. MUARA INTAN 177,400,000.00 177,400,000.00 88.70 11 12 CV. MULTI MULYA 179,042,000.00 179,042,000.00 89.52 12 13 CV. TOHA PUTRA 179,996,000.00 179,996,000.00 90.00 13 14 CV. INDIRA 180,237,000.00 180,237,000.00 90.12 14 15 CV. EXPO 66 183,174,000.00 183,174,000.00 91.59 15 16 CV. TECHNICS 183,482,000.00 183,482,000.00 91.74 16 17 CV. VINGZI 185,708,000.00 185,708,000.00 92.85 17

SUNGAI PENUH, MEI 2011

TTD

PANITIA PENGADAAN BARANG/JASA DINAS PEKERJAAN UMUM KOTA SUNGAI PENUH

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

Referensi

Dokumen terkait

Imagine a world where you could format data on an ad hoc basis or new data for the same fields on a repetitive basis in a way that would create formatted worksheets, a PivotTable, and

The reason for this is that plastic surgery is more linked to a person’s mental health than most people would believe, particularly since most decisions to undergo plastic surgery

Kepada peserta Seleksi yang keberatan atas Penetapan Hasil kualifikasi Kegiatan tersebut diberikan kesempatan untuk menyampaikan sanggahan secara tertulis, selambat-lambatnya

mengumumkan Rencana Umum Pengadaan Barang/Jasa untuk pelaksanaan kegiatan Tahun Anggaran 2014, seperti tersebut dibawah ini :.

Kepada peserta Seleksi yang keberatan atas Penetapan Hasil kualifikasi Kegiatan tersebut diberikan kesempatan untuk menyampaikan sanggahan secara tertulis, selambat-lambatnya

Bagi perusahaan yang berkeberatan atas pengumuman ini, diberikan masa sanggah selama 3 (tiga) hari kerja setelah tanggal pengumuman ini dan sanggahan

Berdasarkan pertimbangan diatas kami mohon agar proses pelelangan Pembangunan Pembangunan kantor Lurah Sartngan untuk dibatalkan. Demikian kami sampaikan, untuk dapat