• Tidak ada hasil yang ditemukan

CHAPTER V CONCLUSSION. From this research the author obtained much good additional knowledge.

N/A
N/A
Protected

Academic year: 2021

Membagikan "CHAPTER V CONCLUSSION. From this research the author obtained much good additional knowledge."

Copied!
14
0
0

Teks penuh

(1)

67

CHAPTER V

CONCLUSSION

5.1. RESULT

From this research the author obtained much good additional knowledge. Many new things that can be observed, studied and became a valuable experience, be it in science, as well as moral messages. There are several result of this research below:

a. Based on the estimation of amount of debris flow in Gendol river about 1547899.16 m3.

b. Based on the estimation of the capacity volume of sediment control structure (sabo) in Gendol river about 1165838.60 m3.

c. There are 382060.56 m3 sediment cannot accommodated by the sediment control structure (sabo) in Gendol river.

d. In conclusion the sediment control structure in Gendol river is ineffective to mitigate the losses during the debris flow.

e. There is six suggested sediment control structure that should be built to anticipate the losses during debris flow.

f. After adding six sediment control stricture (sabo) capacity of sediment control structure become 1553110.18 m3.

g. Furthermore, the sediment control structure along Gendol river is only accommodate 75% from the total debris flow 1547899.16 m3 or

(2)

1165838.60 m3 only that mean there 25% or about 382060.56 m3 losses sediment flow and harmful for the downstream area.

h. Sand mining is recommended in order to keep the structure in good condition so the structure can work properly

i. Beside that construct another sediment control structure in Gendol river become the best solution to minimize the losses sediment.

In order to balancing the sediment and the structure, six Sediment control structure should be added on the Gendol river. The detail information about those six sediment control structure (sabo) see Table 4.6 Balanced Sediment.

a. The first recommendation structure is located on Glagasari which dimension is 13.00 m height and 80.00 m width that can accommodate around 108488.20 m3 of sediment from debris flow. The second recommendation structure is located on Sindumartani dimension is 8.00 m height and 70.00 m width that can accommodate around 58416.72 m3 of

sediment from debris flow.

b. The next recommendation structure is located on Agromulyo with dimension 6.50 m height and 65.00 m width this structure can accommodate around 44073.33 m3 of sediment from debris flow.

c. The next recommendation structure is located on Kepuharjo with dimension 13.00 m height and 70.00 m width this structure can accommodate around 94927.17 m3 of sediment from debris flow.

d. The next a couple’s structure is located on the downstream of GE-C0 (Tulung) separate on different elevation with the dimension about 6.0 m

(3)

69

height and 65.00 m width each structure can accommodate around 40683.07 m3 of sediment from debris flow.

For more information about location of proposed six sediment control structure shows on the figure below. See Figure 5.1 Suggestion of New Sediment Control Structure Location.

5.2. RECOMMENDATION

Based on this research the author would like to give some recommendation for related parties.

a. There are many sediment control structure distributed into several rivers from Merapi. And every instance has their own data about the sabo. This make the information is scattered and incomplete. This make the monitoring harder, because the specification data and the other record are hold by other organization. Therefore, making a centralized data base, which every instance can access, will make the data easier to analyze and complete. This will also make research in sediment control structure become easier.

b. Rehabilitate and repair the damaged building.

c. Conducted investigation to assess the damages in the building based on existing procedure.

d. Forming a community to give knowledge to the society about the sediment controlling structure and its benefits.

(4)

e. With a good awareness of the society about the benefits of the sediment controlling structure, therefore the society will also protect the structure so it can always be operated in a good condition.

(5)
(6)
(7)

73

REFERENCES

Chairil, S. Setyono, E, Hidayat, R.F., 2012 Analisis Peningkatan Kapasitas Kantong Lahar Kali Regoyo Desa Regoyo Kabupaten Lumajang.,

Jurusan Teknik Sipil Universitas Muhammadiyah Malang

Dedi, S., Heru, A.S., and Surendro A.W., Fikri, A.K., Maria. U., 2015 Pengendalian Aliran Sedimen Pada DAS Kali Mujur Gunung Semeru, on Annual Report of Depatemen Pekerjaan Umum PPK Penanganan Bencana Sedimen. Kementrian Pekerjaan Umum Direktorat Jenderal Sumber Daya Air Direktorat

Sungai dan Pantai Satuan Kerja Direktorat Sungai, Danau dan Waduk Kegiatan Penanganan Sedimen, 2006, Desain Sabo, ISBN 978-602-96989-4-7

Joesron, L., 1986, Banjir Rencana untuk Bangunan Air, Departemen Pekerjaan Umum.

Mukhlisin, 1998, Pengaruh Curah Hujan Terhadap Pembentukan Aliran Debris, Tesis Magister, Progran Studi Teknik Sipil, Sekolah Pascasarjana Fakultas

Teknik, Universitas Gajah Mada, Yogyakarta

Nobutomo, O, Mizuno, H, and Mizuyama, T., 2010 Design Standard of Control Structures Against Debris Flow in Japan, on Erosion and Sediment

Control Division, Research Center for Disaster Risk Management, National

Institute for Land and Infrastructure Management, Ministry of Land,

(8)

Priyantoro, D, 1987, Teknik Pengangkutan S e d i m e n , Fakultas Teknik Jurusan

Pengairan Universitas Brawijaya Malang.

Departemen Permukiman dan Pengembangan Wilayah Direktorat Jenderal Pengembangan Perdesaan, 2000(a), Draft Manual Perencanaan Sabo, Proyek Pengembangan dan Rekayasa SABO.

Departemen Permukiman dan Pengembangan Wilayah Direktorat Jenderal Pengembangan Perdesaan, 2000(b), Contoh Aplikasi Perencanaan SABO, Proyek Pengembangan dan Rekayasa SABO.

Rahmat, A., Djoko, L., and Haryono K., 2010 Pengelolaan Sedimen Kali Gendol pasca erupsi 2006 An Journal of Sabo Technical Center 2010.

Takahashi T., Nakagawa H. and Kuang S. (1987): Estimation of debris

flow hydrograph on varied slope bed. Erosion and Sedimentation in

the Pacific Rim, IAHS Publ. 165, pp. 167–177

Voight, 2000, Historical of Merapi Volcano, Central Java Imdonesia. 1768-1998.

(9)
(10)

76

(11)

77 23836.21397 84102.91639 24689.38086 92086.1413 11584.07278 28008.743730103.59922 9693.313953 19252.20836 18526.29621 17250.36923 11488.88296 17516.25 1558.055491 9176.37306611524.6868 49820.87905 9411.057692 10334.25 12177.06489 2507.787136 4996.570236 0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000

V

olu

me (

m

3

)

Name of Sediment Control Structure

(12)

78 31781.619 112137.222 32919.174 122781.522 15445.430 37344.99240138.132 12924.419 25669.611 24701.728 23000.492 15318.511 23355.000 2077.407 12235.16415366.249 66427.839 12548.077 13779.000 16236.087 3343.7166662.094 0.000 20000.000 40000.000 60000.000 80000.000 100000.000 120000.000 140000.000

V

olu

me (

m

3

)

Name of Sediment Control Structure

(13)

79 55,617.83 196,240.14 57,608.56 214,867.66 27,029.50 65,353.74 70,241.73 22,617.73 44,921.82 43,228.02 40,250.86 26,807.39 40,871.25 3,635.46 21,411.54 26,890.94 116,248.72 21,959.13 24,113.25 28,413.15 5,851.50 11,658.66 50,000.00 100,000.00 150,000.00 200,000.00 250,000.00

V

olu

me (

m

3

)

Name of Sediment Control Structure

(14)

80 0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 110000 120000 130000 140000 150000 160000 170000 180000 190000 200000 210000 220000 230000

V

olu

me (

m

3

)

Name of Sediment Control Structure

Storage Volume of Sediment Control Structure at Gendol River

Gambar

Figure 5.1 Suggestion of New Sediment Control Structure Location.

Referensi

Dokumen terkait