NO JEMBATAN UKURAN (M) KONSTRUKSI KONDISI KETERANGAN
NAMA TAHUN P L Jumlah Bentang BB BA Lantai
1 Bandut lor 2003 14.70 7.00 3.00 P Bt G Btn Beton B
2 Sungapan 1988 30.50 6.00 1.00 P Btn G Bj Beton R Pemel. Rangka baja
3 Triwidadi **) 6.00 4.00 1.00 P Bt G Btn Beton RB Beton Patah
4 Sudimoro **) 9.00 4.00 1.00 P Bt G Btn Beton RB Beton Lapuk
5 Ngangin-angin **) 4.00 5.00 1.00 P Btn G Btn Beton B
6 Ngentak **) 15.00 6.00 1.00 P Btn G Btn Beton RR Loaning retak
7 Cemplung 2006 33.00 9.0 1.00 P Btn G Btn Beton B Beton Prestressed
8 Beji **) 4.00 6.00 1.00 P Bt G Btn Beton B
9 Palihan **) 11.50 7.00 3.00 P Bt G Btn Beton B
10 Kalijurang **) 12.00 5.00 1.00 P Bt G Btn Beton B
11 Mayungan **) 6.00 5.00 1.00 P Bt G Btn Beton B
12 Krangean I **) 6.00 5.00 1.00 P Bt G Btn Beton B
13 Krangean II **) 6.00 5.00 1.00 P Bt G Btn Beton B
14 Kalimundu **) 6.00 5.00 1.00 P Bt G Btn Beton B
15 Sorobayan I **) 4.00 4.00 1.00 P Bt G Btn Beton B
16 Sorobayan II **) 4.00 4.00 1.00 P Bt G Btn Beton B
17 Gunturgeni **) 4.00 4.00 1.00 P Bt G Btn Beton B
18 Singgelo **) 4.00 5.00 1.00 P Bt G Btn Beton B
19 Bayuran **) 4.00 4.00 1.00 P Bt G Btn Beton B
20 Wonotingal **) 4.00 5.00 1.00 P Bt G Btn Beton B
21 Kenteng **) 4.00 4.00 1.00 P Bt G Btn Beton B
22 Paker **) 19.00 4.50 2.00 P Btn G Btn Beton B
23 Sorok 1978 21.00 6.00 1.00 P Btn G Btn Beton B
24 Bakulan 1976 28.00 8.00 2.00 P Btn G Btn Beton B
25 Potrobayan 1982 4.00 4.00 1.00 P Bt G Btn Beton B
26 Jonggrangan 1984 4.00 4.00 1.00 P Bt G Btn Beton B
27 Depok 1986 4.00 6.00 1.00 P Bt G Btn Beton B
28 Dronco 1989 5.00 11.00 1.00 P Bt G Btn Bata B
29 Jetis **) 6.00 4.00 1.00 P Bt G Btn Beton B
30 Cembing 2000 15.00 8.00 1.00 P Bt G Btn Beton B
31 Kuncen 1977 7.35 6.90 1.00 P Bt G Btn Beton R Sayap&talud patah
32 Celep 1986 15.00 6.50 1.00 P Btn G Btn Beton B
33 Rejosari **) 6.00 4.00 1.00 P Bt G Btn Beton B
34 Kaliputih **) 12.00 7.00 1.00 P Btn G Btn Beton B
35 Gejlik Pitu 7 2008 10.00 9.00 1.00 P Btn G Bj Beton B
36 Gumulan **) 7.50 6.00 1.00 P Bt G Btn Beton B
37 Mintoragan 1989 12.00 6.50 1.00 P Bt G Btn Beton B
38 Kaliurang 1988 8.00 6.50 1.00 P Bt G Btn Beton B
39 Kasongan 2002 31.00 9.00 1.00 P Btn G Btn Beton B
40 Jipangan **) 6.00 5.00 1.00 P Bt G Btn Beton B
41 Kalangan 1987 13.00 5.50 1.00 P Bt G Btn Beton B
42 Bambon **) 6.00 6.00 1.00 P Bt G Btn Beton B
43 samas **) 32.00 9.00 1.00 P Btn G Btn Beton B Konstruksi Prestessed
44 Miri 1978 20.00 6.00 1.00 P Btn G Btn Beton B
45 Sindon 2002 30.80 7.00 1.00 P Btn G Btn Beton B
46 Kentolan I 1987 4.50 6.90 2.00 P bt G Btn Beton B
47 Kentolan II 1987 4.60 6.70 2.00 P Bt G Btn Beton R Sayap rusak
48 Turi 1988 18.00 8.00 1.00 P Btn G Btn Beton RR Loaning retak
49 Pulokadang 1976 16.00 6.00 1.00 P Btn G Btn Beton B
50 Belik 1978 10.00 6.00 1.00 P Bt G Btn Beton RR Loaning retak
51 pacar 2008 20.00 9.00 1.00 P Btn G Btn Beton B
52 Kanggotan 1976 15.00 7.00 1.00 P Btn G Btn Beton R Sayap rusak
53 Ngablak 2004 31.00 9.00 1.00 P Btn G Btn Beton B Konstruksi Prestessed
54 Bentoro 1973 14.00 4.00 1.00 P bt G Btn Beton R Pondasi rusak
55 Pesing I 1983 19.00 6.70 1.00 P Btn G Btn Beton B
56 ngijo 2001 28.60 9.00 1.00 P Btn G Btn Beton B
57 Mojosari **) 9.00 5.00 1.00 P Bt G Btn Beton B
58 Kembangsari 1976 18.00 5.00 1.00 P Btn G Btn Beton B
59 Ambarwinagun 1981 15.00 6.00 1.00 P Btn G Btn Beton B
60 Bambanglipuiro **) 10.50 5.00 1.00 P Bt G Btn Beton B
61 Wirokerten 1982 14.00 6.00 2.00 P Btn G Btn Beton R Sayap rusak
62 Kaliurang 1986 20.00 4.00 1.00 P Btn G Btn Beton R Sayap rusak
63 Potorono 2000 15.00 9.00 1.00 P Bt G Btn Beton B
64 Pesing II 2000 22.00 9.00 1.00 P Btn G Btn Beton B
65 Manding 1977 20.00 9.00 1.00 P Btn G Btn Beton RR Loaning retak
66 Dahromo 1986 5.00 5.00 1.00 P Bt G Btn Beton B
67 Pesing IV **) 13.50 7.00 1.00 P Btn G Btn Beton B
68 Giriloyo I **) 15.50 4.00 1.00 P Btn G Btn Beton B
69 Giriloyo II **) 11.50 4.00 1.00 P Bt G Btn Beton B
70 Giriloyo III **) 10.00 4.00 1.00 P Bt G Btn Beton B
71 Nglentong I 1989 8.00 4.00 1.00 P Bt G Btn Beton B
72 Nglentong II 1989 6.00 4.00 1.00 P Bt G Btn Beton B
73 Seloning 1988 7.00 7.00 1.00 P Bt G Btn Beton B
74 Ngoto/Dokaran **) 20.00 4.00 1.00 P Btn G Bj Kayu B
75 Soko **) 6.00 6.00 1.00 P Bt G Btn Beton B
76 Sembungan **) 11.00 3.00 1.00 P Bt G Bj Kayu B
77 karangrejek 1992 16.00 5.00 1.00 P Btn G Btn Beton RR Loaning retak
78 Bintaran 2004 41.00 9.00 1.00 P Btn G Btn Beton B Konstruksi Prestessed
79 Petir 2004 30.00 9.00 1.00 P BTn G Btn Beton B Konstruksi Prestessed
80 Kedungpucang 1994 12.000 6.00 1.00 P Bt G btn Beton B
81 karanggayam **) 60.00 2.00 1.00 P Btn G Bj Kayu B jembatan Gantung
82 Banjardadap **) 26.00 5.00 1.00 P Btn G Btn Beton B
83 kaligawe 2008 16.00 2.30 1.00 P Btn G bj Beton B
84 Gejlik Pitu II 2008 10.00 7.00 1.00 P Btn G Bj Beton B
Keterangan : P < 10 m 35 buah
***) : Sekitar tahun 80 (hasil wawancara) 31 buah
**) : Sebelum tahun 80 (wawancara) 10 buah
*) : Sungai irigasi P > 30 m 8 buah
jumlah 84 buah
BB : Bangun Bawah G Bj : gelagar baja BA : bangun Atas G Btn : gelagar beton P : Panjang Jembatan RR : Rusak ringan L : Lebar jembatan R : Rusak BT : Jumlah bentang RB : Rusak berat P Bt : Pondasi batu kali B : Baik P Btn : Pondasi beton