KEGIATAN : PEMBANGUNAN JALAN KOTA PEKANBARU T.A 2010
PEKERJAAN : JALAN KITA PENGASPALAN HOTMIX PANJANG 0,182 KM, LEBAR 4 M JALAN SITI AISYAH PENGASPALAN HOTMIX PANJANG 0,137 KM, LEBAR 3,5 M
JALAN RAWA INDAH OVERLAY DAN PELEBARAN HOTMIX PANJANG 0,730 KM, LEBAR 4,5 M JALAN BARU LANJUTAN PENGASPALAN HOTMIX PANJANG 0,150 KM, LEBAR 4 M PEMBUATAN PARIT COR UKURAN 50 CM PANJANG 361 M
LOKASI : KECAMATAN MARPOYAN DAMAI KOTA : PEKANBARU
HPS / OE :
1.412.967.000,00
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT KETERANGAN SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS / OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. TUAH ALAM NEGERI 1.346.254.000,00 1.346.254.000,00 95,28
1
2 PT. MUARA SEJATI 1.387.100.000,00 1.387.100.000,00 98,17
2
3 PT. RUMPUN JAYA 1.387.710.000,00 1.387.710.000,00 98,21
3
4 PT. BANGUN SAKTI KENCANA RAYEUK 1.368.764.000,00 1.431.743.000,00 101,33
4
SECARA ELEKTRONIK BIDANG BINA MARGA DINAS PEKERJAAN UMUM NAMA PERUSAHAAN
NO
2
Pekanbaru, September 2010
TTD
KEGIATAN : PEMBANGUNAN JALAN KOTA PEKANBARU T.A 2010
PEKERJAAN : JALAN PAUS LANJUTAN OVERLAY DAN PELEBARAN HOTMIX PANJANG 0,650 KM, LEBAR 8 M PEMBUATAN PARIT COR UKURAN 1,5 M PANJANG 100 M
PEMBUATAN BOX UKURAN 2 x 2 M PANJANG 3 M
JALAN LOKAN OVERLAY DAN PELEBARAN HOTMIX PANJANG 0,201 KM, LEBAR 4 M JALAN GURITA OVELAY DAN PELEBARAN HOTMIX PANJANG 0,505 KM, LEBAR 4 M PEMBUATAN PARIT COR UKURAN 60 CM PANJANG 324 M
LOKASI : KECAMATAN MARPOYAN DAMAI KOTA : PEKANBARU
HPS / OE :
2.226.425.000,00
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT KETERANGAN SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS / OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. TUNAS MEKAR HARAPAN 2.112.250.000,00 2.112.250.000,00 94,87
1
2 PT. VIRAJAYA RIAUPUTRA 2.173.863.570,00 2.173.863.000,00 97,64
2
3 PT. VIRAJAYA RIAUPERKASA 2.190.873.401,00 2.190.873.000,00 98,40
3
4 PT. FITRA WIKA 2.193.081.000,00 2.193.081.000,00 98,50
4
5 PT. TIGA PILAR SEJATI 2.209.576.000,00 2.209.576.000,00 99,24
5
SECARA ELEKTRONIK BIDANG BINA MARGA DINAS PEKERJAAN UMUM NAMA PERUSAHAAN
NO
2
Pekanbaru, September 2010
TTD
KEGIATAN : PEMBANGUNAN JALAN KOTA PEKANBARU T.A 2010
PEKERJAAN : JALAN PENERBANGAN
PENGASPALAN HOTMIX PJG : 0,670 KM, LEBAR : 4 M
LOKASI : KECAMATAN BUKIT RAYA KOTA : PEKANBARU
HPS / OE :
777.218.000,00
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT KETERANGAN SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS / OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 CV. RANAH INDAH 773.143.543,50 773.143.000,00 99,48
1
2 CV. DELLA BERSAUDARA 769.385.323,08 769.385.000,00 98,99
2
3 CV. ROKAN HULU - - -
3
Tidak Ada Surat PenawaranSECARA ELEKTRONIK BIDANG BINA MARGA DINAS PEKERJAAN UMUM NAMA PERUSAHAAN
NO
2
Pekanbaru, September 2010
TTD
KEGIATAN : PEMBANGUNAN JALAN KOTA PEKANBARU T.A 2010 PEKERJAAN : JALAN RAWA MANGUN
PELEBARAN HOTMIX PJG : 0,900 KM, LEBAR : 1,5 M OVERLAY HOTMIX PJG : 0,900 KM, LEBAR : 4,5 M PEMBUATAN PARIT COR UK. 50 CM PANJANG : 700 M
LOKASI : KECAMATAN BUKIT RAYA KOTA : PEKANBARU
HPS / OE :
1.432.620.000,00
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT KETERANGAN SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS / OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. CITRA HOKIANA TRIUTAMA 1.387.166.000,00 1.387.166.000,00 96,83
1
2 PT. PUTRA SULUNG MAS 1.387.710.000,00 1.387.710.000,00 96,87
2
3 PT. ILHAM PANGESTU KARYA 1.417.565.000,00 1.417.565.000,00 98,95
3
SECARA ELEKTRONIK BIDANG BINA MARGA DINAS PEKERJAAN UMUM NAMA PERUSAHAAN
NO
2
Pekanbaru, September 2010
TTD
KEGIATAN : PEMBANGUNAN JALAN KOTA PEKANBARU T.A 2010 PEKERJAAN : JALAN IKHLAS
OVERLAY HOTMIX DAN PELEBARAN PJG : 0,750 KM, LEBAR : 4-6.5 M
LOKASI : KECAMATAN BUKIT RAYA KOTA : PEKANBARU
HPS / OE :
647.662.000,00
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT KETERANGAN SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS / OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 CV. KHARISMA PUTERI 626.573.000,00 626.573.000,00 96,74
1
2 CV. TEGUH KARYA INDAH 634.506.000,00 634.506.000,00 97,97
2
3 CV. TEGUH MANDIRI SEJAHTERA 642.643.000,00 642.643.000,00 99,23
3
SECARA ELEKTRONIK BIDANG BINA MARGA DINAS PEKERJAAN UMUM NAMA PERUSAHAAN
NO
2
Pekanbaru, September 2010
TTD
KEGIATAN : KEGIATAN PEMBANGUNAN JALAN KOTA PEKANBARU TAHUN ANGGARAN 2010
PEKERJAAN : JALAN BUDI MULYA RW. O8
PENGASPALAN HOTMIX PJG : 1,000 KM, LEBAR : 4,5 M
LOKASI : KECAMATAN TENAYAN RAYA KOTA : PEKANBARU
HPS / OE :
Rp
1.392.237.000,00
TOTAL HARGA TOTAL HARGA PERSENTASE URUTAN KETERANGAN PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT
SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP PENAWARAN HPS / OE HPS/ OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. FITRA WIKA 1.350.519.000,00 1.350.519.000,00 97,00 1
2 PT. TIGA PILAR SEJATI 1.354.572.000,00 1.354.572.000,00 97,29 2
3 PT. VIRAJAYA RIAUPUTRA 1.371.301.093,00 1.371.301.000,00 98,50 3
4 PT. VIRAJAYA RIAUPERKASA 1.382.971.693,00 1.382.971.000,00 99,33 4
Pekanbaru, September 2010
PANITIA PENGADAAN BARANG/JASA SECARA ELEKTRONIK BIDANG BINA MARGA 2
NAMA PERUSAHAAN NO
KEGIATAN : KEGIATAN PEMBANGUNAN JALAN KOTA PEKANBARU TAHUN ANGGARAN 2010
PEKERJAAN : JALAN KRAKATAU
PENGASPALAN HOTMIX PJG : 0,505 KM, LEBAR : 4,5 M PEMBUATAN PARIT COR UK. 80 CM 317 M
PEMBUATAN BOX COR UK. 0,8 x 0,8 CM, PJG = 5 M
LOKASI : KECAMATAN TENAYAN RAYA KOTA : PEKANBARU
HPS / OE :
Rp
1.046.486.000,00
TOTAL HARGA TOTAL HARGA PERSENTASE URUTAN KETERANGAN PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT
SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP PENAWARAN HPS / OE HPS/ OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. FITRA WIKA 1.014.330.000,00 1.014.330.000,00 96,93 1
2 PT. VIRAJAYA RIAUPERKASA 1.022.934.391,00 1.022.934.000,00 97,75 2
3 PT. VIRAJAYA RIAUPUTRA 1.032.804.958,00 1.032.804.000,00 98,69 3
4 PT. TIGA PILAR SEJATI 1.035.340.000,00 1.035.340.000,00 98,93 4
Pekanbaru, September 2010
TTD
PANITIA PENGADAAN BARANG/JASA SECARA ELEKTRONIK BIDANG BINA MARGA 2
KEGIATAN : KEGIATAN PEMBANGUNAN JALAN KOTA PEKANBARU TAHUN ANGGARAN 2010
PEKERJAAN : JALAN INDRA PURI LANJUTAN
PELEBARAN HOTMIX PJG : 0,815 KM, LEBAR : 2 M PENGASPALAN HOTMIX PJG : 0,815 KM, LEBAR : 4,2 - 6 M PEMBUATAN PARIT COR UK. 40 CM PJG = 152 M
PEMBUATAN PARIT COR UK. 60 CM PJG = 155 M PEMBUATAN PARIT COR UK. 90 CM PJG = 145 M PEMBUATAN BOX UK. 0,8 x 0,8 CM PJG = 12 M
LOKASI : KECAMATAN TENAYAN RAYA KOTA : PEKANBARU
HPS / OE :
Rp
1.236.518.000,00
TOTAL HARGA TOTAL HARGA PERSENTASE URUTAN KETERANGAN PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT
SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP PENAWARAN HPS / OE HPS/ OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. ILHAM PANGESTU KARYA 1.196.799.500,00 1.196.804.000,00 96,79 1
2 PT. CITRA HOKIANA TRIUTAMA 1.213.021.400,00 1.213.026.000,00 98,10 2
3 PT. PUTRA SULUNG MAS 1.224.626.400,00 1.224.631.000,00 99,04 3
PANITIA PENGADAAN BARANG/JASA SECARA ELEKTRONIK BIDANG BINA MARGA 2
NAMA PERUSAHAAN NO
TTD
KEGIATAN : KEGI ATAN PEMBANGUNAN JALAN KOTA PEKANBARU DANA DPI PD TAHUN ANGGARAN 2010
PEKERJAAN : JALAN BULUH CI NA MENUJU KAMPUS UI N SI MP. BARU OVERLAY HOTMI X PANJANG 1,200 KM LEBAR 4 M
JALAN TI UNG MNJ SMK TARUNA, PENGASPALAN HOTMI X PANJANG 0,250 KM L = 4,5 M PEMBUATAN PARI T COR UK. 40 CM PANJANG 250 M
PEMBUATAN BOX CULVERT UK. 0,8 X 0,8 M PANJANG 6 M
LOKASI : KECAMATAN TAMPAN KOTA : PEKANBARU
HPS / OE :
Rp
1.288.675.000,00
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT KETERANGAN SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS / OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. PUTRA ROKAN PERKASA 1.236.702.686,95 1.236.702.000,00 95,97
1
2 PT. AMERO JAYA BHAKTI 1.262.500.986,65 1.262.500.000,00 97,972
3 PT. SARANA INDAH PERKASA ABADI 1.274.761.417,66 1.274.761.000,00 98,923
TTD
PANITIA PENGADAAN BARANG/JASA SECARA ELEKTRONIK BIDANG BINA MARGA
DINAS PEKERJAAN UMUM NAMA PERUSAHAAN
2 NO
KEGIATAN : KEGI ATAN PEMBANGUNAN JALAN KOTA PEKANBARU DANA DPI PD TAHUN ANGGARAN 2010
PEKERJAAN : JALAN DELI MA KEL, DELI MA
PELEBARAN HOTMI X PANJANG 1,620 LEBAR 2 M
LOKASI : KECAMATAN TAMPAN KOTA : PEKANBARU
HPS / OE :
Rp
1.231.186.000,00
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT KETERANGAN SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS / OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. MEKAR YAKIN SEJAHTERA 1.206.408.000,00 1.206.408.000,00 97,99
1
2 PT. MUARA SEJATI 1.218.629.000,00 1.218.629.000,00 98,982
3 PT. BAIK PANJANG 1.224.475.000,00 1.224.475.000,00 99,453
TTD
PANITIA PENGADAAN BARANG/JASA SECARA ELEKTRONIK BIDANG BINA MARGA
DINAS PEKERJAAN UMUM NAMA PERUSAHAAN
2 NO
KEGIATAN : KEGI ATAN PEMBANGUNAN JALAN KOTA PEKANBARU DANA DPI PD TAHUN ANGGARAN 2010
PEKERJAAN : JALAN SRI KANDI LANJUTAN KEL. DELI MA
PELEBARAN + OVERLAY HOTMI X PANJANG 0,720 KM LEBAR 5 M PEMBUATAN TURAP PANJANG 41 M H = 1- 2 M
PEMBUATAN TURAP PANJANG 74 M H = 2- 3 M
LOKASI : KECAMATAN TAMPAN KOTA : PEKANBARU
HPS / OE :
Rp
1.499.522.000,00
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT KETERANGAN SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS / OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. MEKAR YAKIN SEJAHTERA 1.469.587.000,00 1.469.587.000,00 98,00
1
2 PT. MUARA SEJATI 1.484.054.000,00 1.484.054.000,00 98,972
3 PT. BAIK PANJANG 1.491.069.000,00 1.491.069.000,00 99,443
TTD
PANITIA PENGADAAN BARANG/JASA SECARA ELEKTRONIK BIDANG BINA MARGA
DINAS PEKERJAAN UMUM NAMA PERUSAHAAN
2 NO
KEGIATAN : KEGI ATAN PEMBANGUNAN JALAN KOTA PEKANBARU DANA DPI PD TAHUN ANGGARAN 2010
PEKERJAAN : JALAN MUHAJI RI N, OVERLAY HOTMI X PANJANG 0,700 KM LEBAR 4 M JALAN KARYAWAN,OVERLAY HOTMI X PANJANG 0,440 LEBAR 4 JALAN ANDALAS, OVERLAY HOTMI X PANJANG 0,600 KM LEBAR 4 M JALAN PAHLAWAN, OVERLAY HOTMI X PANJANG 0,402 KM LEBAR 4 M JALAN HARAPAN, OVERLAY HOTMI X PANJANG 0,358 KM LEBAR 4 M PEMBUATAN BOX CULVERT UK. 0,8 X 0,8 M PANJANG 5,2 M LOKASI : KECAMATAN TAMPAN
KOTA : PEKANBARU
HPS / OE :
Rp
1.496.052.000,00
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT KETERANGAN SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS / OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. VIRAJAYA RIAUPUTRA 1.460.119.285,00 1.460.119.000,00 97,60
1
2 PT. VIRAJAYA RIAUPERKASA 1.473.295.222,00 1.473.295.000,00 98,482
3 PT. FITRA WIKA 1.474.922.000,00 1.474.922.000,00 98,593
4 PT. TIGA PILAR 1.479.369.000,00 1.479.369.000,00 98,884
TTD
PANITIA PENGADAAN BARANG/JASA SECARA ELEKTRONIK BIDANG BINA MARGA
DINAS PEKERJAAN UMUM NAMA PERUSAHAAN
2 NO
KEGIATAN : KEGIATAN PEMBANGUNAN JALAN KOTA PEKANBARU TAHUN ANGGARAN 2010
PEKERJAAN : JALAN RUMBIO
PENGASPALAN HOTMIX PJG : 0,500 KM, LEBAR : 4,5 M
LOKASI : KECAMATAN RUMBAI PESISIR KOTA : PEKANBARU
HPS / OE :
Rp
712.510.000,00
TOTAL HARGA TOTAL HARGA PERSENTASE URUTAN KETERANGAN PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT
SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP PENAWARAN HPS / OE HPS/ OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 CV. ARYA ABADI 695.208.000,00 695.208.000,00 97,57 1
2 PT. BINA SARANA JAYA 698.945.900,00 698.945.000,00 98,10 2
3 CV. TEGUH MANDIRI SEJAHTERA 707.176.059,13 707.176.000,00 99,25 3
PANITIA PENGADAAN BARANG/JASA SECARA ELEKTRONIK BIDANG BINA MARGA 2
NAMA PERUSAHAAN NO
TTD
KEGIATAN : KEGIATAN PEMBANGUNAN JALAN KOTA PEKANBARU TAHUN ANGGARAN 2010
PEKERJAAN : JALAN IKAN RAYA
OVERLAY HOTMIX PJG : 1,500 M, LEBAR : 4,0 M
LOKASI : KECAMATAN RUMBAI KOTA : PEKANBARU
HPS / OE :
Rp
1.024.800.000,00
TOTAL HARGA TOTAL HARGA PERSENTASE URUTAN KETERANGAN PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT
SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP PENAWARAN HPS / OE HPS/ OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. BINA SARANA JAYA 995.401.500,00 995.401.000,00 97,13 1
2 PT. RIAU YAKIN TEGUH 1.004.964.000,00 1.004.964.000,00 98,06 2
3 PT. DUTA KARYA MANDIRI PERKASA 1.015.220.658,07 1.015.220.000,00 99,07 3
4 PT. RIAU ASIH JAYA 1.022.458.000,00 1.022.458.000,00 99,77 4 2
NAMA PERUSAHAAN NO
TTD
PANITIA PENGADAAN BARANG/JASA SECARA ELEKTRONIK BIDANG BINA MARGA
KEGIATAN : KEGI ATAN PEMBANGUNAN JALAN KOTA PEKANBARU DANA DPI PD TAHUN ANGGARAN 2010
PEKERJAAN : JALAN FLORA
PENGASPALAN HOTMI K PJG : 0,330 KM, LBR : 4 M
JALAN BALAI DESA PENGASPALAN HOTMI X PJG : 0.202 KM, L = 4 M JALAN LI LI I I PENGASPALAN HOTMI X PJG : 0.200 KM, L : 4 M JALAN GURU SULAI MAN PENGASPALAN HOTMI X PJG : 250 M , L : 5 M PEMBUATAN PARI T COR UK 40 CM PJG : 50 M
PEMBUATAN TURAB PJG : 100 M, TG : 50 CM LOKASI : KECAMATAN PAYUNG SEKAKI
KOTA : PEKANBARU
HPS / OE :
Rp
1.131.060.000,00
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT KETERANGAN SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS / OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. ERIST SEJAHTERA 1.104.936.705,11 1.104.936.000,00 97,69
1
2 PT. PERBUATAN JAYA 1.107.898.534,20 1.107.898.000,00 97,952
3 PT. BANGUN PURBA SATAHI 1.112.229.233,40 1.112.229.000,00 98,343
TTD
PANITIA PENGADAAN BARANG/JASA SECARA ELEKTRONIK BIDANG BINA MARGA
DINAS PEKERJAAN UMUM NAMA PERUSAHAAN
2 NO
KEGIATAN : KEGI ATAN PEMBANGUNAN JALAN KOTA PEKANBARU DANA DPI PD TAHUN ANGGARAN 2010
PEKERJAAN : JALAN KANTOR CAMAT MENUJU JEMBATAN PENGASPALAN HOTMI K PJG : 0,424 KM, LBR : 5 M JALAN MENUJU MESJI D AL- JAMI K
PENGASPALAN HOTMI X PJG : 0,336 KM, LEBAR : 5 M PELEBARAN HOTMI X PJG : 0,336 KM, LEBAR : 1,5 M PEMBUATAN BOX CULVERT UK 0.8 x 0.8 CM PJG : 15 M
LOKASI : KECAMATAN PAYUNG SEKAKI KOTA : PEKANBARU
HPS / OE :
Rp
1.278.432.000,00
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT KETERANGAN SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS / OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. RIAU ASIH JAYA 1.257.838.000,00 1.257.838.000,00 98,39
1
2 PT. RIAU YAKIN TEGUH 1.265.047.000,00 1.265.047.000,00 98,952
3 PT. RANTAU SINGINGI 1.272.048.000,00 1.272.048.000,00 99,503
TTD
PANITIA PENGADAAN BARANG/JASA SECARA ELEKTRONIK BIDANG BINA MARGA
DINAS PEKERJAAN UMUM NAMA PERUSAHAAN
2 NO
KEGIATAN : KEGI ATAN PEMBANGUNAN JALAN KOTA PEKANBARU DANA DPI PD TAHUN ANGGARAN 2010
PEKERJAAN : JALAN PERMATA I
OVERLAY HOTMI K PJG : 0,529 KM, LBR : 4,5 M JALAN PERMATA I I
PENGASPALAN HOTMI X PJG : 0,290 KM, LEBAR : 4 M
JALAN GURU PENGASPALAN HOTMI X PJG : 0.250 KM, LBR : 4.5 M JALAN SI AK
OVERLAY HOTMI X PANJANG 0,655 KM LEBAR 4 M PELEBARAN HOTMI X PANJANG 0,655 KM LEBAR 1 M LOKASI : KECAMATAN PAYUNG SEKAKI
KOTA : PEKANBARU
HPS / OE :
Rp
1.759.505.000,00
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN
PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT KETERANGAN SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP
PENAWARAN HPS / OE HPS / OE
(Rp.) (Rp.) (%)
1 3 4 5 = 4:HPS X 100 6 7
1 PT. BANGUN PURBA SATAHI 1.733.682.000,00 1.733.682.000,00 98,53
1
2 PT. RIVAL UTAMA 1.736.905.050,00 1.736.905.000,00 98,722
3 PT. SEMANGAT HASRAT JAYA 1.743.303.710,00 1.743.303.000,00 99,083
4 PT. PERBUATAN JAYA 1.750.205.600,00 1.750.205.000,00 99,474
TTD
PANITIA PENGADAAN BARANG/JASA SECARA ELEKTRONIK BIDANG BINA MARGA
DINAS PEKERJAAN UMUM NAMA PERUSAHAAN
2 NO