A AGREGAT KASAR,BAHAN PEREKAT DAN BAHAN JADI
1 Pasir urug
m
3160,000.00
2 Pasir pasang / Pasir beton
m
3310,000.00
3 Tanah urug
m
3110,000.00
4 Kerikil
m
3420,000.00
5 Batu gunung
m
3270,000.00
6 Batu bata
bh
1,200.00
7 Semen @ 50 kg
kg
1,500.00
8 Semen warna
kg
1,800.00
9 Pancang Mini Pile 32 P
m1
750,000.00
B BAHAN FINISHING
1 Cat meni
kg
25,000.00
2 Cat tembok danabrite
kg
48,000.00
3 Cat tembok danashield
kg
70,000.00
4 Cat dasar dinding
kg
30,000.00
5 Cat dasar kayu
kg
28,000.00
6 Cat kilap kayu aftelak
kg
40,000.00
7 Cat Melamik
kg
75,000.00
8 Pewarna
kg
5,000.00
9 Sanding
kg
30,000.00
10 Thinner
ltr
25,000.00
11 Plamur tembok
kg
42,000.00
12 Dempul kayu
kg
28,000.00
13 Lem kayu
kg
14,000.00
14 Kertas gosok ( amplas )
lbr
4,000.00
15 Minyak bekisting
ltr
30,000.00
16 Cat Epoxy
ltr
65,000.00
17 Coating Jadi
m
245,000.00
C BAHAN KAYU
1 Kayu meranti
m
32,400,000.00
2 Papan Bengkirai
m
34,000,000.00
3 Papan ulin
m
34,300,000.00
4 Kayu kapur
m
33,400,000.00
5 Balok Bengkirai
m
34,000,000.00
6 Balok ulin
m
34,100,000.00
7 Teakwood 6 mm
lbr
140,000.00
8 Plywood 4 mm
lbr
85,000.00
9 Plywood 9 mm
lbr
140,000.00
10 Multiplek 12 mm
lbr
190,000.00
11 Kayu bekisting
m
33,100,000.00
12 Kayu galam
btg
14,000.00
13 Daun pintu panil bengkirai
unit
950,000.00
14 Daun pintu panil ulin
unit
950,000.00
15 Kusen Aluminium
m
1185,000.00
16 Daun pintu Double panil bengkirai
unit
1,100,000.00
17 Daun pintu kaca Tempered 12 mm + accessories
unit
4,500,000.00
18 Daun pintu bengkirai + kaca clear 5 mm
unit
1,500,000.00
19 Daun jendela aluminium + kaca Stopsol 5 mm ( 60 x 140 )
unit
575,000.00
20 Daun pintu Panil ( Untuk pintu shaft )
unit
350,000.00
20 Daun pintu lemari + accessories
unit
250,000.00
DAFTAR HARGA SATUAN BAHAN
D BAHAN LANTAI, ATAP DAN PELAPIS DINDING
1 Atap Genteng Metal model Minimalis
bh
70,000.00
2 Bubungan genteng metal type C model Minimalis
bh
45,000.00
3 Aluminium foil / sisalation ( double side,1,25 x60 m )
m
212,000.00
4 Seng plat lebar 90 cm
m
115,000.00
5 Fiber Cement 0.8/10 cm
m
175,000.00
6 Fiber Cement 1/25 cm
m
185,000.00
7 Pasang plafond Gypsum 9 mm + rangka baja ringan
m
2180,000.00
8 Pasang plafond Calsium Silikat 4 mm + rangka baja ringan
m
2170,000.00
9 Pasang plafond Spandrill + rangka baja ringan
m
2220,000.00
10 Homogenius Tile 40 x 40 cm
bh
30,000.00
11 Homogenius Tile 40 x 40 cm (Anti Licin)
bh
35,000.00
12 Homogenius Tile 20 x 40 cm
bh
12,000.00
13 Homogenius Tile 20 x 40 cm (Anti Licin)
bh
15,000.00
14 Pasang Keramik Mozaik 40 x 40 cm Type I
m
2350,000.00
15 Pasang Keramik Mozaik 40 x 40 cm Type II
m
2320,000.00
16 Pasang Keramik Mozaik 40 x 40 cm Type III
m
2300,000.00
17 Batu Alam Alur Andesit 20/40 cm
m
2280,000.00
18 Granito Tile 40/40 cm
bh
35,000.00
19 Keramik lantai 30/30 cm ( Anti Licin )
bh
8,500.00
20 Keramik dinding 30/30 cm
bh
7,500.00
21 Keramik lantai dan dinding 20/20 cm
bh
3,000.00
22 Step noising 5/20 cm
bh
5,000.00
23 Cor Coral sikat warna
m
2350,000.00
24 Plint keramik dinding 10/30 cm
bh
3,500.00
25 Gypsum Board 9 mm
lbr
85,000.00
26 Lapisan Glasswool
m
2120,000.00
27 Sungkai Wood
m
2150,000.00
28 Wallpaper
m
285,000.00
29 List Acitrap 1,5 x 7 cm
m
115,000.00
30 Plint kayu bengkirai 2 x 10 cm
m
120,000.00
29 List cornece gypsum C24 ( 8 - 10 )
m
125,000.00
30 Benangan plesteran
m
275,000.00
31 Parit dari pasangan bata 1 : 4 diplester
m
1200,000.00
32 Bak kontrol parit dari pasangan bata 1 : 4
unit
250,000.00
E BAHAN LOGAM DAN PAKU
1 Paku Biasa
kg
20,000.00
2 Paku Gypsum
kg
35,000.00
3 Besi beton polos/ulir
kg
21,000.00
4 Kawat bendrat
kg
25,000.00
5 Rangka atap baja ringan
m
2250,000.00
6 Besi Hollow
m
110,000.00
7 Ornamen dari besi Hollow
unit
450,000.00
F
BAHAN KUNCI,PENGGANTUNG DAN KACA
1 Door closer
bh
175,000.00
2 Engsel pintu kuningan 5"
psg
32,000.00
3 Door Holder
psg
200,000.00
4 Kunci tanam 2 slaag
psg
125,000.00
5 Kunci tanam 1 slaag
psg
110,000.00
6 Expagnolet
psg
65,000.00
7 Kaca Stopsol 8 mm
m
2285,000.00
8 Kaca mati buram ( es ) 5 mm
m
2210,000.00
9 Kaca bening 5 mm + Sticker sandblast
m
2250,000.00
Keterangan
G BAHAN LISTRIK
1 Lampu baret 25 watt
unit
120,000.00
2 Lampu Box Tanam 2 x 36 watt
unit
320,000.00
3 Lampu Box Tanam 2 x 18 watt
unit
250,000.00
4 Lampu TL1 x 36 watt
unit
150,000.00
5 Lampu VShafe 1 x 36 watt
unit
120,000.00
6 Lampu Downlight 13 watt
unit
85,000.00
7 Lampu Downlight 7 watt
unit
65,000.00
8 Saklar ganda
bh
30,000.00
9 Saklar tunggal
bh
15,000.00
10 Stop kontak
bh
30,000.00
11 Stop kontak AC
bh
45,000.00
12 AC Split 1 PK + Instalasi
unit
5,000,000.00
13 Pasang Celling Speaker + Instalasi
unit
400,000.00
14 Box Panel Lengkap
unit
7,500,000.00
H BAHAN SANITASI
1 Kloset duduk + shower ( Toto )
unit
1,850,000.00
2 Washtafel
unit
550,000.00
3 Urinoir
unit
750,000.00
4 Kran air
bh
30,000.00
5 Floor drain
bh
30,000.00
6 Bak air pas. Bata lapis keramik
unit
850,000.00
7 Shower + instalasi
unit
450,000.00
8 Kak cuci piring/KitchenZink + instalasi
unit
450,000.00
9 Septictank + peresapan
unit
10,000,000.00
10 Tempat sabun ( Keramik )
unit
75,000.00
11 Tempat Tissu ( Stainless )
unit
150,000.00
12 Profil Tank 2000 ltr
unit
2,500,000.00
13 Pompa + instalasi
unit
3,500,000.00
14 Rumah Pompa
unit
1,000,000.00
15 Roof Drain + instalasi
unit
85,000.00
16 Pipa PVC AW 4"
m
135,000.00
17 Pipa PVC AW 3"
m
128,500.00
18 Pipa PVC AW 2"
m
115,000.00
19 Pipa PVC AW 3/4"
m
110,000.00
20 Pipa PVC AW 0.5"
m
18,000.00
1
Mandor
Org/Hari
90,000.00
2
Kepala Tukang
Org/Hari
85,000.00
3
Tukang
Org/Hari
80,000.00
4
Pekerja
Org/Hari
65,000.00
No
Jenis bahan
Satuan
Harga satuan
Keterangan
DAFTAR HARGA SATUAN UPAH
Satuan Kerja 0 Kegiatan 0 Pekerjaan 0 0 Sub Pekerjaan 0 Lokasi 0
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp)
A
1 Pengukuran dan Pasang Bouwplank
0.0120 m³ Balok kayu bengkirai 4,000,000.00 48,000.00 48,000.00 0.0070 m³ Papan kayu meranti 2,400,000.00 16,800.00 16,800.00 0.0200 kg Paku 20,000.00 400.00 400.00 0.1000 Oh Tukang kayu 80,000.00 8,000.00 8,000.00 0.0100 Oh Kepala tukang kayu 85,000.00 850.00 850.00 0.1000 Oh Pekerja 65,000.00 6,500.00 6,500.00 0.0050 Oh Mador 90,000.00 450.00 450.00 Jumlah 15,800.00 65,200.00 81,000.00 2 1 m3 Galian Tanah 0.4000 Oh Pekerja 65,000.00 26,000.00 26,000.00 0.0400 Oh Mandor 90,000.00 3,600.00 3,600.00 Jumlah 29,600.00 29,600.00
3 1 m3 Urugan Tanah Kembali
0.1920 Oh Pekerja 65,000.00 12,480.00 12,480.00 0.0190 Oh Mandor 90,000.00 1,710.00 1,710.00 Jumlah 14,190.00 14,190.00 4 1 m3 Urugan Pasir 1.2000 m3 Pasir Urug 160,000.00 192,000.00 192,000.00 0.3000 Oh Pekerja 65,000.00 19,500.00 19,500.00 0.0100 Oh Mandor 90,000.00 900.00 900.00 Jumlah 20,400.00 192,000.00 212,400.00 5 1 m3 Urugan tanah bangunan
1.2000 m3 Tanah urug 110,000.00 132,000.00 132,000.00 0.3000 Oh Pekerja 65,000.00 19,500.00 19,500.00 0.0100 Oh Mandor 90,000.00 900.00 900.00 Jumlah 20,400.00 132,000.00 152,400.00
6 1 Titik pancang Mini Pile 32 P tinggi 6 m
6.0000 m1 Mini Pile 32 P 750,000.00 4,500,000.00 4,500,000.00 1.0000 Mobilisasi 150,000.00 150,000.00 150,000.00 1.0000 Upah Pemancangan 150,000.00 150,000.00 150,000.00 Jumlah 300,000.00 4,500,000.00 4,800,000.00
B PEKERJAAN PONDASI, DINDING DAN LANTAI 1 1 m2 Pasangan 1/2 batu bata 1 : 2
55.0000 Bj Batu bata 1,200.00 66,000.00 66,000.00 18.9500 kg Semen @ 50 kg 1,500.00 28,425.00 28,425.00 0.0380 m3 Pasir pasang 310,000.00 11,780.00 11,780.00 0.1000 Oh Tukang 80,000.00 8,000.00 8,000.00 0.0100 Oh Kepala tukang 85,000.00 850.00 850.00 0.3000 Oh Pekerja 65,000.00 19,500.00 19,500.00 0.0150 Oh Mandor 90,000.00 1,350.00 1,350.00 Jumlah 29,700.00 106,205.00 135,905.00
DAFTAR ANALISIS
NO. URAIAN PEKERJAAN
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp)
2 1 m2 Pasangan 1/2 batu bata 1 : 4
55.0000 bh Batu bata 1,200.00 66,000.00 66,000.00 11.5000 kg Semen @ 50 kg 1,500.00 17,250.00 17,250.00 0.0430 m3 Pasir pasang 310,000.00 13,330.00 13,330.00 0.1000 Oh Tukang 80,000.00 8,000.00 8,000.00 0.0100 Oh Kepala tukang 85,000.00 850.00 850.00 0.3200 Oh Pekerja 65,000.00 20,800.00 20,800.00 0.0150 Oh Mandor 90,000.00 1,350.00 1,350.00 Jumlah 31,000.00 96,580.00 127,580.00 3 1 m2 Pasangan 1 batu bata 1 : 4
112.0000 bh Batu bata 1,200.00 134,400.00 134,400.00 23.0000 kg Semen @ 50 kg 1,500.00 34,500.00 34,500.00 0.0860 m3 Pasir pasang 310,000.00 26,660.00 26,660.00 0.2200 Oh Tukang 80,000.00 17,600.00 17,600.00 0.0100 Oh Kepala tukang 85,000.00 850.00 850.00 0.6100 Oh Pekerja 65,000.00 39,650.00 39,650.00 0.0150 Oh Mandor 90,000.00 1,350.00 1,350.00 Jumlah 59,450.00 195,560.00 255,010.00 4 1 m2 Plesteran 1 : 2, tebal 15 mm 0.0200 m3 Pasir pasang 310,000.00 6,200.00 6,200.00 10.2240 kg Semen @ 50 kg 1,500.00 15,336.00 15,336.00 0.1500 Oh Tukang 80,000.00 12,000.00 12,000.00 0.0150 Oh Kepala tukang 85,000.00 1,275.00 1,275.00 0.3000 Oh Pekerja 65,000.00 19,500.00 19,500.00 0.0150 Oh Mandor 90,000.00 1,350.00 1,350.00 Jumlah 34,125.00 21,536.00 55,661.00 5 1 m2 Plesteran 1 : 4, tebal 15 mm 0.0240 m3 Pasir pasang 310,000.00 7,440.00 7,440.00 6.2400 kg Semen @ 50 kg 1,500.00 9,360.00 9,360.00 0.1500 Oh Tukang 80,000.00 12,000.00 12,000.00 0.0150 Oh Kepala tukang 85,000.00 1,275.00 1,275.00 0.3000 Oh Pekerja 65,000.00 19,500.00 19,500.00 0.0150 Oh Mandor 90,000.00 1,350.00 1,350.00 Jumlah 34,125.00 16,800.00 50,925.00 6 1 m2 Plesteran 1 : 4, tebal 20 mm 0.0320 m3 Pasir pasang 310,000.00 9,920.00 9,920.00 8.3200 kg Semen @ 50 kg 1,500.00 12,480.00 12,480.00 0.2000 Oh Tukang 80,000.00 16,000.00 16,000.00 0.0200 Oh Kepala tukang 85,000.00 1,700.00 1,700.00 0.4000 Oh Pekerja 65,000.00 26,000.00 26,000.00 0.0220 Oh Mandor 90,000.00 1,980.00 1,980.00 Jumlah 45,680.00 22,400.00 68,080.00 7 1 m2 Acian 3.2500 kg Semen @ 50 kg 1,500.00 4,875.00 4,875.00 0.1000 Oh Tukang 80,000.00 8,000.00 8,000.00 0.0100 Oh Kepala tukang 85,000.00 850.00 850.00 0.2000 Oh Pekerja 65,000.00 13,000.00 13,000.00 0.0100 Oh Mandor 90,000.00 900.00 900.00 Jumlah 22,750.00 4,875.00 27,625.00 8 1 m2 Homogenius Tile 40/40 cm 6.6300 bh Homogenius Tile 40/40 cm 30,000.00 198,900.00 198,900.00 9.8000 kg Semen @ 50 kg 1,500.00 14,700.00 14,700.00 0.0450 m3 Pasir pasang 310,000.00 13,950.00 13,950.00 1.3000 kg Semen warna 1,800.00 2,340.00 2,340.00 0.1250 Oh Tukang 80,000.00 10,000.00 10,000.00 0.0130 Oh Kepala tukang 85,000.00 1,105.00 1,105.00 0.0130 Oh Mandor 90,000.00 1,170.00 1,170.00 0.2500 Oh Pekerja 65,000.00 16,250.00 16,250.00 Jumlah 28,525.00 229,890.00 258,415.00
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp)
9 1 m2 Homogenius Tile 40/40 cm (Anti Licin) 6.6300
bh Homogenius Tile 40/40 cm (Anti Licin) 35,000.00 232,050.00 232,050.00 9.8000 kg Semen @ 50 kg 1,500.00 14,700.00 14,700.00 0.0450 m3 Pasir pasang 310,000.00 13,950.00 13,950.00 1.3000 kg Semen warna 1,800.00 2,340.00 2,340.00 0.1250 Oh Tukang 80,000.00 10,000.00 10,000.00 10,000.00 0.0130 Oh Kepala tukang 85,000.00 1,105.00 1,105.00 1,105.00 0.0130 Oh Mandor 90,000.00 1,170.00 1,170.00 1,170.00 0.2500 Oh Pekerja 65,000.00 16,250.00 16,250.00 16,250.00 Jumlah 28,525.00 291,565.00 291,565.00 10 1 m2 Homogenius Tile 20/40 cm 12.5000 bh Homogenius Tile 20/40 cm 12,000.00 150,000.00 150,000.00 9.7000 kg Semen @ 50 kg 1,500.00 14,550.00 14,550.00 0.0450 m3 Pasir pasang 310,000.00 13,950.00 13,950.00 1.6200 kg Semen warna 1,800.00 2,916.00 2,916.00 0.3500 Oh Tukang 80,000.00 28,000.00 28,000.00 28,000.00 0.0350 Oh Kepala tukang 85,000.00 2,975.00 2,975.00 2,975.00 0.0350 Oh Mandor 90,000.00 3,150.00 3,150.00 3,150.00 0.7000 Oh Pekerja 65,000.00 45,500.00 45,500.00 45,500.00 Jumlah 79,625.00 261,041.00 261,041.00 11 1 m2 Homogenius Tile 20/40 cm (Anti Licin)
12.5000
bh Homogenius Tile 40/40 cm (Anti Licin) 15,000.00 187,500.00 187,500.00 9.7000 kg Semen @ 50 kg 1,500.00 14,550.00 14,550.00 0.0450 m3 Pasir pasang 310,000.00 13,950.00 13,950.00 1.6200 kg Semen warna 1,800.00 2,916.00 2,916.00 0.3500 Oh Tukang 80,000.00 28,000.00 28,000.00 28,000.00 0.0350 Oh Kepala tukang 85,000.00 2,975.00 2,975.00 2,975.00 0.0350 Oh Mandor 90,000.00 3,150.00 3,150.00 3,150.00 0.7000 Oh Pekerja 65,000.00 45,500.00 45,500.00 45,500.00 Jumlah 79,625.00 298,541.00 298,541.00 12 1 m2 Pasangan dinding batu alam alur andesit 20/40 cm
1.0500
m2 Batu alam alur andesit 20/40 cm 280,000.00 294,000.00 294,000.00 11.7530 kg Semen @ 50 kg 1,500.00 17,629.50 17,629.50 0.0350 m3 Pasir pasang 310,000.00 10,850.00 10,850.00 1.0000 m2 Coating 45,000.00 45,000.00 45,000.00 0.3500 Oh Tukang 80,000.00 28,000.00 28,000.00 0.0350 Oh Kepala tukang 85,000.00 2,975.00 2,975.00 0.0300 Oh Mandor 90,000.00 2,700.00 2,700.00 0.6200 Oh Pekerja 65,000.00 40,300.00 40,300.00 Jumlah 73,975.00 367,479.50 441,454.50 13 1 m2 Pasangan Granito Tile 40/40
6.2500 bh Granito Tile 40/40 cm 35,000.00 218,750.00 218,750.00 9.9000 kg Semen @ 50 kg 1,500.00 14,850.00 14,850.00 1.5000 kg semen warna 1,800.00 2,700.00 2,700.00 0.0420 m3 Pasir pasang 310,000.00 13,020.00 13,020.00 0.3500 Oh Tukang 80,000.00 28,000.00 28,000.00 0.0350 Oh Kepala tukang 85,000.00 2,975.00 2,975.00 0.0300 Oh Mandor 90,000.00 2,700.00 2,700.00 0.6200 Oh Pekerja 65,000.00 40,300.00 40,300.00 Jumlah 86,995.00 236,300.00 323,295.00 14 1 m2 Keramik lantai 30/30 cm ( Anti Licin )
11.0000
bh Keramik lantai 30/30 cm ( Anti Licin ) 8,500.00 93,500.00 93,500.00 9.9000 kg Semen @ 50 kg 1,500.00 14,850.00 14,850.00 0.0420 m3 Pasir pasang 310,000.00 13,020.00 13,020.00 1.5000 kg Semen warna 1,800.00 2,700.00 2,700.00 0.3500 Oh Tukang 80,000.00 28,000.00 28,000.00 0.0350 Oh Kepala tukang 85,000.00 2,975.00 2,975.00 0.0300 Oh Mandor 90,000.00 2,700.00 2,700.00 0.6200 Oh Pekerja 65,000.00 40,300.00 40,300.00 Jumlah 73,975.00 124,070.00 198,045.00
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp) 15 1 m2 Keramik dinding 30/30 cm 11.0000 bh Keramik Dinding 30/30 cm 7,500.00 82,500.00 82,500.00 9.9000 kg Semen @ 50 kg 1,500.00 14,850.00 14,850.00 0.0420 m3 Pasir pasang 310,000.00 13,020.00 13,020.00 1.5000 kg Semen warna 1,800.00 2,700.00 2,700.00 0.3500 Oh Tukang 80,000.00 28,000.00 28,000.00 0.0350 Oh Kepala tukang 85,000.00 2,975.00 2,975.00 0.0300 Oh Mandor 90,000.00 2,700.00 2,700.00 0.6200 Oh Pekerja 65,000.00 40,300.00 40,300.00 Jumlah 73,975.00 113,070.00 187,045.00 16 1 m2 Keramik dinding dan lantai 20/20 cm
26.5000 bh Keramik Dinding 20/20 cm 3,000.00 79,500.00 79,500.00 10.4000 kg Semen @ 50 kg 1,500.00 15,600.00 15,600.00 0.0450 m3 Pasir pasang 310,000.00 13,950.00 13,950.00 1.6200 kg Semen warna 1,800.00 2,916.00 2,916.00 0.3500 Oh Tukang 80,000.00 28,000.00 28,000.00 0.0350 Oh Kepala tukang 85,000.00 2,975.00 2,975.00 0.0350 Oh Mandor 90,000.00 3,150.00 3,150.00 0.7000 Oh Pekerja 65,000.00 45,500.00 45,500.00 Jumlah 79,625.00 111,966.00 191,591.00 17 1 m1 Plint keramik 10/30 cm 3.4000 bh Plint keramik 10/30 cm 3,500.00 11,900.00 11,900.00 1.1400 kg Semen @ 50 kg 1,500.00 1,710.00 1,710.00 0.0030 m3 Pasir pasang 310,000.00 930.00 930.00 0.1000 kg Semen warna 1,500.00 150.00 150.00 0.0900 Oh Tukang 80,000.00 7,200.00 7,200.00 0.0090 Oh Kepala tukang 85,000.00 765.00 765.00 0.0050 Oh Mandor 90,000.00 450.00 450.00 0.0900 Oh Pekerja 65,000.00 5,850.00 5,850.00 Jumlah 14,265.00 14,690.00 28,955.00 C PEKERJAAAN BETON BERTULANG
1 1 m3 Adukan beton 1 Pc : 3 Ps : 5 Krl 0.5200 m3 Pasir pasang 310,000.00 161,200.00 161,200.00 218.0000 kg Semen @ 50 kg 1,500.00 327,000.00 327,000.00 0.8700 m3 Koral beton 420,000.00 365,400.00 365,400.00 0.2500 Oh Tukang 80,000.00 20,000.00 20,000.00 0.0250 Oh Kepala tukang 85,000.00 2,125.00 2,125.00 0.0800 Oh Mandor 90,000.00 7,200.00 7,200.00 1.6500 Oh Pekerja 65,000.00 107,250.00 107,250.00 Jumlah 136,575.00 853,600.00 990,175.00 2 1 m3 Adukan Beton 1 Pc : 2 Ps : 3 Krl 0.5400 m3 Pasir pasang 310,000.00 167,400.00 167,400.00 336.0000 kg Semen @ 50 kg 1,500.00 504,000.00 504,000.00 0.8100 m3 Koral beton 420,000.00 340,200.00 340,200.00 0.3500 Oh Tukang 80,000.00 28,000.00 28,000.00 0.0350 Oh Kepala tukang 85,000.00 2,975.00 2,975.00 1.0000 Oh Mandor 90,000.00 90,000.00 90,000.00 2.0000 Oh Pekerja 65,000.00 130,000.00 130,000.00 Jumlah 250,975.00 1,011,600.00 1,262,575.00 3 1 m2 Pasang bekisting untuk sloof
0.0450 m3 Kayu bekisting 3,100,000.00 139,500.00 139,500.00 0.3000 kg Paku 20,000.00 6,000.00 6,000.00 0.1000 ltr Minyak bekisting 30,000.00 3,000.00 3,000.00 0.2600 Oh Tukang 80,000.00 20,800.00 20,800.00 0.0260 Oh Kepala tukang 85,000.00 2,210.00 2,210.00 0.0050 Oh Mandor 90,000.00 450.00 450.00 0.3000 Oh Pekerja 65,000.00 19,500.00 19,500.00 Jumlah 42,960.00 148,500.00 191,460.00
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp)
4 1 m2 Pasang bekisting untuk kolom
0.0400 m3 Kayu bekisting 3,100,000.00 124,000.00 124,000.00 0.4000 kg Paku 20,000.00 8,000.00 8,000.00 0.2000 ltr Minyak bekisting 30,000.00 6,000.00 6,000.00 0.0150 m3 Balok kayu meranti 2,400,000.00 36,000.00 36,000.00 0.3500 lbr Plywood 9 mm 140,000.00 49,000.00 49,000.00 2.0000 btg Kayu galam 14,000.00 28,000.00 28,000.00 0.3300 Oh Tukang 80,000.00 26,400.00 26,400.00 0.0330 Oh Kepala tukang 85,000.00 2,805.00 2,805.00 0.0060 Oh Mandor 90,000.00 540.00 540.00 0.3000 Oh Pekerja 65,000.00 19,500.00 19,500.00 Jumlah 49,245.00 251,000.00 300,245.00 5 1 m2 Pasang bekisting untuk balok
0.0400 m3 Kayu bekisting 3,100,000.00 124,000.00 124,000.00 0.4000 kg Paku 20,000.00 8,000.00 8,000.00 0.2000 ltr Minyak bekisting 30,000.00 6,000.00 6,000.00 0.0180 m3 Balok kayu meranti 2,400,000.00 43,200.00 43,200.00 0.3500 lbr Plywood 9 mm 140,000.00 49,000.00 49,000.00 2.0000 btg Kayu galam 14,000.00 28,000.00 28,000.00 0.3300 Oh Tukang 80,000.00 26,400.00 26,400.00 0.0330 Oh Kepala tukang 85,000.00 2,805.00 2,805.00 0.0060 Oh Mandor 90,000.00 540.00 540.00 0.3200 Oh Pekerja 65,000.00 20,800.00 20,800.00 Jumlah 50,545.00 258,200.00 308,745.00
6 1 m2 Pasang bekisting untuk lantai
0.0400 m3 Kayu bekisting 3,100,000.00 124,000.00 124,000.00 0.4000 kg Paku 20,000.00 8,000.00 8,000.00 0.2000 ltr Minyak bekisting 30,000.00 6,000.00 6,000.00 0.0150 m3 Balok kayu meranti 2,400,000.00 36,000.00 36,000.00 0.3500 lbr Plywood 9 mm 140,000.00 49,000.00 49,000.00 6.0000 btg Kayu galam 14,000.00 84,000.00 84,000.00 0.3300 Oh Tukang 80,000.00 26,400.00 26,400.00 0.0330 Oh Kepala tukang 85,000.00 2,805.00 2,805.00 0.0060 Oh Mandor 90,000.00 540.00 540.00 0.3200 Oh Pekerja 65,000.00 20,800.00 20,800.00 Jumlah 50,545.00 307,000.00 357,545.00 7 1 m2 Pasang bekisting untuk tangga
0.0300 m3 Kayu bekisting 3,100,000.00 93,000.00 93,000.00 0.4000 kg Paku 20,000.00 8,000.00 8,000.00 0.1500 ltr Minyak bekisting 30,000.00 4,500.00 4,500.00 0.0150 m3 Balok kayu meranti 2,400,000.00 36,000.00 36,000.00 0.3500 lbr Plywood 9 mm 140,000.00 49,000.00 49,000.00 2.0000 btg Kayu galam 14,000.00 28,000.00 28,000.00 0.3300 Oh Tukang 80,000.00 26,400.00 26,400.00 26,400.00 0.0330 Oh Kepala tukang 85,000.00 2,805.00 2,805.00 2,805.00 0.0060 Oh Mandor 90,000.00 540.00 540.00 540.00 0.3200 Oh Pekerja 65,000.00 20,800.00 20,800.00 20,800.00 Jumlah 50,545.00 269,045.00 269,045.00 8 1 kg pembesian dengan beton polos / ulir
1.0500 kg Besi beton 21,000.00 22,050.00 22,050.00 0.0150 kg Kawat beton 25,000.00 375.00 375.00 0.0070 Oh Tukang 80,000.00 560.00 560.00 0.0007 Oh Kepala tukang 85,000.00 59.50 59.50 0.0070 Oh Pekerja 65,000.00 455.00 455.00 0.0003 Oh Mandor 90,000.00 27.00 27.00 Jumlah 1,101.50 22,425.00 23,526.50 9 1 m3 Cor beton rabat + Penulangan
1.0000
m3 ( 1 ) Pek. Beton 1 : 3 : 5 990,175.00 990,175.00
77.2860
kg ( 8 ) Pembesian beton 23,526.50 1,818,269.08
Jumlah 2,808,444.08
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp)
10 1 m2 Adukan beton tumbuk 1 Pc : 3 Ps : 5 Krl,untuk lantai kerja
0.0260 m3 Pasir pasang 310,000.00 8,060.00 8,060.00 10.0000 kg Semen @ 50 kg 1,500.00 15,000.00 15,000.00 0.0440 m3 Koral beton 420,000.00 18,480.00 18,480.00 0.0200 Oh Tukang 80,000.00 1,600.00 1,600.00 0.0020 Oh Kepala tukang 85,000.00 170.00 170.00 0.0060 Oh Mandor 90,000.00 540.00 540.00 1.1500 Oh Pekerja 65,000.00 74,750.00 74,750.00 Jumlah 77,060.00 41,540.00 118,600.00 11 Cor beton bertulang Pile Cab 60 x 124 cm ( Type A )
1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 4.9500
m2 ( 3 ) Pek. Pasangan bekisting Sloof 191,460.00 947,727.00 155.9910
kg ( 8 ) Pembesian beton 23,526.50 3,669,922.26
Jumlah 5,880,224.26
12 Cor beton bertulang Pile Cab 60 x 60 cm ( Type B ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 6.6700
m2 ( 3 ) Pek. Pasangan bekisting Sloof 191,460.00 1,277,038.20
193.5560
kg ( 8 ) Pembesian beton 23,526.50 4,553,695.23
Jumlah 7,093,308.43
13 Cor beton bertulang Sloof 30/50 cm ( S1 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 6.6670
m2 ( 3 ) Pek. Pasangan bekisting Sloof 191,460.00 1,276,463.82 146.9500
kg ( 8 ) Pembesian beton 23,526.50 3,457,219.18
Jumlah 5,996,258.00
14 Cor beton bertulang Sloof 25/50 cm ( S2 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 6.6670
m2 ( 3 ) Pek. Pasangan bekisting Sloof 191,460.00 1,276,463.82
172.8850
kg ( 8 ) Pembesian beton 23,526.50 4,067,378.95
Jumlah 6,606,417.77
15 Cor beton bertulang Sloof 20/30 cm ( S3 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 10.0000
m2 ( 3 ) Pek. Pasangan bekisting Sloof 191,460.00 1,914,600.00 218.9860
kg ( 8 ) Pembesian beton 23,526.50 5,151,974.13
Jumlah 8,329,149.13
16 Cor beton bertulang Sloof 15/30 cm ( S4 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 13.3300
m2 ( 3 ) Pek. Pasangan bekisting Sloof 191,460.00 2,552,161.80 210.6500
kg ( 8 ) Pembesian beton 23,526.50 4,955,857.23
Jumlah 8,770,594.03
17 Cor beton bertulang Sloof 15/25 cm ( S5 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 13.3300
m2 ( 3 ) Pek. Pasangan bekisting Sloof 191,460.00 2,552,161.80 180.0370
kg ( 8 ) Pembesian beton 23,526.50 4,235,640.48
Jumlah 8,050,377.28
18 Cor beton bertulang Kolom 45/45 cm ( K1 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00
8.8900
m2 ( 4 ) Pek. Pasangan bekisting Kolom 300,245.00 2,669,178.05 128.7030
kg ( 8 ) Pembesian beton 23,526.50 3,027,931.13
Jumlah 6,959,684.18
19 Cor beton bertulang Kolom 30/45 cm ( K2 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 11.1100
m2 ( 4 ) Pek. Pasangan bekisting Kolom 300,245.00 3,335,721.95 120.2270
kg ( 8 ) Pembesian beton 23,526.50 2,828,520.52
Jumlah 7,426,817.47
20 Cor beton bertulang Kolom 30/30 cm ( K3 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00
13.3300
m2 ( 4 ) Pek. Pasangan bekisting Kolom 300,245.00 4,002,265.85 260.7880
kg ( 8 ) Pembesian beton 23,526.50 6,135,428.88
Jumlah 11,400,269.73
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp)
21 Cor beton bertulang Kolom 10/20 cm ( K4 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 15.0000
m2 ( 4 ) Pek. Pasangan bekisting Kolom 300,245.00 4,503,675.00 296.3730
kg ( 8 ) Pembesian beton 23,526.50 6,972,619.38
Jumlah 12,738,869.38
22 Cor beton bertulang Kolom Praktis 10/10 cm ( BP ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00
7.1400
m2 ( 5 ) Pek. Pasangan bekisting Balok 308,745.00 2,204,439.30 110.0000
kg ( 8 ) Pembesian beton 23,526.50 2,587,915.00
Jumlah 6,054,929.30
23 Cor beton bertulang Balok 30/50 cm ( B1 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 8.6700
m2 ( 5 ) Pek. Pasangan bekisting Balok 308,745.00 2,676,819.15 145.5110
kg ( 8 ) Pembesian beton 23,526.50 3,423,364.54
Jumlah 7,362,758.69
24 Cor beton bertulang Balok 25/50 cm ( B2 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 10.0000
m2 ( 5 ) Pek. Pasangan bekisting Balok 308,745.00 3,087,450.00 171.1580
kg ( 8 ) Pembesian beton 23,526.50 4,026,748.69
Jumlah 8,376,773.69
25 Cor beton bertulang Balok Bordes 25/45 cm ( B3 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 10.2200
m2 ( 5 ) Pek. Pasangan bekisting Balok 308,745.00 3,155,373.90
186.3360
kg ( 8 ) Pembesian beton 23,526.50 4,383,833.90
Jumlah 8,801,782.80
26 Cor beton bertulang Balok 25/40cm ( B4 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00
10.5000
m2 ( 5 ) Pek. Pasangan bekisting Balok 308,745.00 3,241,822.50 205.3090
kg ( 8 ) Pembesian beton 23,526.50 4,830,202.19
Jumlah 9,334,599.69
27 Cor beton bertulang Balok 20/40cm ( B5 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 12.5000
m2 ( 5 ) Pek. Pasangan bekisting Balok 308,745.00 3,859,312.50 172.3380
kg ( 8 ) Pembesian beton 23,526.50 4,054,509.96
Jumlah 9,176,397.46
28 Cor beton bertulang Balok 20/35 cm ( B6 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00
12.8600
m2 ( 5 ) Pek. Pasangan bekisting Balok 308,745.00 3,970,460.70 177.4720
kg ( 8 ) Pembesian beton 23,526.50 4,175,295.01
Jumlah 9,408,330.71
29 Cor beton bertulang Balok 20/30 cm ( B7 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 13.3300
m2 ( 5 ) Pek. Pasangan bekisting Balok 308,745.00 4,115,570.85
161.5870
kg ( 8 ) Pembesian beton 23,526.50 3,801,576.56
Jumlah 9,179,722.41
30 Cor beton bertulang Balok 15/30 cm ( B8 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 16.6700
m2 ( 5 ) Pek. Pasangan bekisting Balok 308,745.00 5,146,779.15 205.8510
kg ( 8 ) Pembesian beton 23,526.50 4,842,953.55
Jumlah 11,252,307.70
31 Cor beton bertulang Balok 15/25 cm ( B9 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 17.3300
m2 ( 5 ) Pek. Pasangan bekisting Balok 308,745.00 5,350,550.85
185.7960
kg ( 8 ) Pembesian beton 23,526.50 4,371,129.59
Jumlah 10,984,255.44
32 Cor beton bertulang Balok Latai 20/15 cm ( B10 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 23.3300
m2 ( 5 ) Pek. Pasangan bekisting Balok 308,745.00 7,203,020.85 211.9780
kg ( 8 ) Pembesian beton 23,526.50 4,987,100.42
Jumlah 13,452,696.27
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp)
33 Cor beton bertulang Plat Lantai tebal 12 cm ( L1 ) 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 8.3300
m2 ( 6 ) Pek. Pasangan bekisting Lantai 357,545.00 2,978,349.85 150.5000
kg ( 8 ) Pembesian beton 23,526.50 3,540,738.25
Jumlah 7,781,663.10
34 Balok beton bertulang plat ( atap,kanopy,listplank ), t= 10 cm 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 10.0000
m2 ( 6 ) Pek. Pasangan bekisting Lantai 357,545.00 3,575,450.00 61.7000
kg ( 8 ) Pembesian beton 23,526.50 1,451,585.05
Jumlah 6,289,610.05
35 Balok beton bertulang tangga 1.0000
m3 ( 2 ) Pek. Beton 1 : 2 : 3 1,262,575.00 1,262,575.00 6.6666
m2 ( 7 ) Pek. Pasangan bekisting Tangga 269,045.00 1,793,615.40 215.0000
kg ( 8 ) Pembesian beton 23,526.50 5,058,197.50
Jumlah 8,114,387.90
D PEKERJAAN ATAP, DINDING DAN PLAFOND 1 1 m2 Mengerjakan atap metal
1.6200 lbr Atap genteng metal 70,000.00 113,400.00 113,400.00 0.2000 Kg Paku 20,000.00 4,000.00 4,000.00 0.2000 Oh Tukang 80,000.00 16,000.00 16,000.00 0.0200 Oh Kep.tukang 85,000.00 1,700.00 1,700.00 0.1000 Oh Pekerja 65,000.00 6,500.00 6,500.00 0.0050 Oh Mandor 90,000.00 450.00 450.00 Jumlah 24,650.00 117,400.00 142,050.00 2 1 m1 Pemasangan bubungan genteng metal
3.350
lbr Bubungan genteng metal 45,000.00 150,750.00 150,750.00 0.050 kg Paku 20,000.00 1,000.00 1,000.00 0.250 Tukang 80,000.00 20,000.00 20,000.00 0.025 Kepala tukang 85,000.00 2,125.00 2,125.00 0.013 Mandor 90,000.00 1,170.00 1,170.00 0.250 Pekerja 65,000.00 16,250.00 16,250.00 Jumlah 39,545.00 151,750.00 191,295.00 3 1 m2 Pemasangan aluminium foil
1.0500 m2 Aluminium foil 12,000.00 12,600.00 12,600.00 0.0500 Oh Tukang 80,000.00 4,000.00 4,000.00 0.0050 Oh Kepala 85,000.00 425.00 425.00 0.1500 Oh Pekerja 65,000.00 9,750.00 9,750.00 0.0080 Oh Mandor 90,000.00 720.00 720.00 Jumlah 14,895.00 12,600.00 27,495.00 4 1 m1 Pasang talang datar / jurai seng plat,lebar 90 cm
1.0500 m1 Seng plat 15,000.00 15,750.00 15,750.00 0.0150 kg Paku 20,000.00 300.00 300.00 0.0190 m3 Papan kayu bengkirai 4,000,000.00 76,000.00 76,000.00 0.2000 Oh Pekerja 65,000.00 13,000.00 13,000.00 0.4000 Oh Tukang 80,000.00 32,000.00 32,000.00 0.0250 Oh Kepala tukang 85,000.00 2,125.00 2,125.00 0.0100 Oh Mandor 90,000.00 900.00 900.00 Jumlah 48,025.00 92,050.00 140,075.00 5 1 m1 Pasang listplank Fiber cement
1.1000 m1 Fiber Cement 0.8/10 cm 75,000.00 82,500.00 82,500.00 1.1000 m1 Fiber Cement 1/25 cm 85,000.00 93,500.00 93,500.00 0.0600 kg Paku biasa 20,000.00 1,200.00 1,200.00 0.1000 Oh Tukang 80,000.00 8,000.00 8,000.00 0.0100 Oh Kepala tukang 85,000.00 850.00 850.00 0.0500 Oh Mandor 90,000.00 4,500.00 4,500.00 0.1000 Oh Pekerja 65,000.00 6,500.00 6,500.00 Jumlah 19,850.00 177,200.00 197,050.00
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp)
6 1 m1 Pasang list gypsum C24 ( 8- 10 ) 1.0000 m1 List gypsum C24 ( 8 - 10 ) 25,000.00 25,000.00 25,000.00 0.2000 kg Lem gypsum 14,000.00 2,800.00 2,800.00 0.0600 Oh Tukang 80,000.00 4,800.00 4,800.00 0.0100 Oh Kepala tukang 85,000.00 850.00 850.00 0.1000 Oh Pekerja 65,000.00 6,500.00 6,500.00 0.0100 Oh Mandor 90,000.00 900.00 900.00 Jumlah 13,050.00 2,800.00 40,850.00
E PEKERJAAN KUSEN, KUNCI DAN PENGGANTUNG 1 1 m3 Kusen pintu dan jendela
1.1000 m3 Balok kayu bengkirai/ulin 4,000,000.00 4,400,000.00 4,400,000.00 1.2500 kg Paku 10 cm 20,000.00 25,000.00 25,000.00 1.0000 m3 Lem kayu 14,000.00 14,000.00 14,000.00 21.0000 Oh Tukang 80,000.00 1,680,000.00 1,680,000.00 2.1000 Oh Kepala tukang 85,000.00 178,500.00 178,500.00 0.3500 Oh Mandor 90,000.00 31,500.00 31,500.00 7.0000 Oh Pekerja 65,000.00 455,000.00 455,000.00 Jumlah 2,345,000.00 4,439,000.00 6,784,000.00 2 1 m2 Pekerjaan pasang dinding partisi gypsum 9 mm
5.0000 m1 Besi Hollow 10,000.00 50,000.00 50,000.00 0.7500 lbr Gypsum Board 9 mm 85,000.00 63,750.00 63,750.00 1.0000 m2 Lapisan Glasswool 120,000.00 120,000.00 120,000.00 0.2500 kg Paku Gypsum 35,000.00 8,750.00 8,750.00 0.6500 Oh Tukang 80,000.00 52,000.00 52,000.00 0.0450 Oh Kepala tukang 85,000.00 3,825.00 3,825.00 0.2000 Oh Pekerja 65,000.00 13,000.00 13,000.00 0.0750 Oh Mandor 90,000.00 6,750.00 6,750.00 Jumlah 75,575.00 192,500.00 318,075.00 3 1 m2 Pekerjaan pasang Lapisan Sungkai Wood
1.0000
m2 Lapisan Sungkai Wood 150,000.00 150,000.00 150,000.00 0.0500 kg Paku 20,000.00 1,000.00 1,000.00 0.0750 Oh Tukang 80,000.00 6,000.00 6,000.00 0.0075 Oh Kepala tukang 85,000.00 637.50 637.50 0.0250 Oh Pekerja 65,000.00 1,625.00 1,625.00 0.0013 Oh Mandor 90,000.00 117.00 117.00 Jumlah 8,379.50 151,000.00 159,379.50 4 1 m1 Pekerjaan pasang list Acitrap 1.5/7 cm
1.0000 m1 List Acitrap 1.5/7 cm 15,000.00 15,000.00 15,000.00 0.0500 kg Paku 20,000.00 1,000.00 1,000.00 0.1200 Oh Tukang 80,000.00 9,600.00 9,600.00 0.0120 Oh Kepala tukang 85,000.00 1,020.00 1,020.00 0.1200 Oh Pekerja 65,000.00 7,800.00 7,800.00 0.0060 Oh Mandor 90,000.00 540.00 540.00 Jumlah 18,960.00 16,000.00 34,960.00 5 1 m1 Pekerjaan pasang Plint kayu bengkirai 2/10 cm
1.0000
m1 Plint kayu bengkirai 2/10 cm 20,000.00 20,000.00 20,000.00 0.0500 kg Paku 20,000.00 1,000.00 1,000.00 0.1200 Oh Tukang 80,000.00 9,600.00 9,600.00 0.0120 Oh Kepala tukang 85,000.00 1,020.00 1,020.00 0.1200 Oh Pekerja 65,000.00 7,800.00 7,800.00 0.0060 Oh Mandor 90,000.00 540.00 540.00 Jumlah 18,960.00 21,000.00 39,960.00 6 1 m2 Pekerjaan pasang wallpaper, lebar 50 cm
2.2000 m2 Wallpaper 85,000.00 187,000.00 187,000.00 0.2500 kg Lem 14,000.00 3,500.00 3,500.00 0.1750 Oh Tukang 80,000.00 14,000.00 14,000.00 0.0170 Oh Kepala tukang 85,000.00 1,445.00 1,445.00 0.3500 Oh Pekerja 65,000.00 22,750.00 22,750.00 0.0020 Oh Mandor 90,000.00 180.00 180.00 Jumlah 38,375.00 190,500.00 228,875.00
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp)
7 Pasang door closer
1.0000 bh Door closer 175,000.00 175,000.00 175,000.00 0.5000 Oh Tukang 80,000.00 40,000.00 40,000.00 0.0500 Oh Kepala tukang 85,000.00 4,250.00 4,250.00 0.0025 Oh Mandor 90,000.00 225.00 225.00 0.0500 Oh Pekerja 65,000.00 3,250.00 3,250.00 Jumlah 47,725.00 175,000.00 222,725.00 8 Pasang Engsel Pintu Kuningan
1.0000 bh Engsel Pintu Kuningan 32,000.00 32,000.00 32,000.00 0.1500 Oh Tukang 80,000.00 12,000.00 12,000.00 0.0150 Oh Kepala tukang 85,000.00 1,275.00 1,275.00 0.0001 Oh Mandor 90,000.00 9.00 9.00 0.0150 Oh Pekerja 65,000.00 975.00 975.00 Jumlah 14,259.00 32,000.00 46,259.00 9 Pasang Door Holder
1.0000 bh Door Holder 200,000.00 200,000.00 200,000.00 0.1500 Oh Tukang 80,000.00 12,000.00 12,000.00 0.0150 Oh Kepala tukang 85,000.00 1,275.00 1,275.00 0.0001 Oh Mandor 90,000.00 9.00 9.00 0.0150 Oh Pekerja 65,000.00 975.00 975.00 Jumlah 14,259.00 200,000.00 214,259.00 10 Pasang Expagnolet 1.0000 bh Expagnolet 65,000.00 65,000.00 65,000.00 0.5000 Oh Tukang 80,000.00 40,000.00 40,000.00 0.0500 Oh Kepala tukang 85,000.00 4,250.00 4,250.00 0.0025 Oh Mandor 90,000.00 225.00 225.00 0.0500 Oh Pekerja 65,000.00 3,250.00 3,250.00 Jumlah 47,725.00 65,000.00 112,725.00 11 1 M2 Pasang kaca Stopsol 8 mm
1.0000 m2 Kaca Stopsol 8 mm 285,000.00 285,000.00 285,000.00 0.1500 Oh Tukang 80,000.00 12,000.00 12,000.00 0.0150 Oh Kepala tukang 85,000.00 1,275.00 1,275.00 0.0001 Oh Mandor 90,000.00 9.00 9.00 0.0150 Oh Pekerja 65,000.00 975.00 975.00 Jumlah 14,259.00 285,000.00 299,259.00 12 1 M2 Pasang kaca Bening 5 mm + sandblast
1.0000 m2 Kaca es 5 mm 250,000.00 250,000.00 250,000.00 0.1500 Oh Tukang 80,000.00 12,000.00 12,000.00 0.0150 Oh Kepala tukang 85,000.00 1,275.00 1,275.00 0.0001 Oh Mandor 90,000.00 9.00 9.00 0.0150 Oh Pekerja 65,000.00 975.00 975.00 Jumlah 14,259.00 250,000.00 264,259.00 13 1 M2 Pasang kaca es 5 mm 1.0000 m2 Kaca es 5 mm 210,000.00 210,000.00 210,000.00 0.1500 Oh Tukang 80,000.00 12,000.00 12,000.00 0.0150 Oh Kepala tukang 85,000.00 1,275.00 1,275.00 0.0001 Oh Mandor 90,000.00 9.00 9.00 0.0150 Oh Pekerja 65,000.00 975.00 975.00 Jumlah 14,259.00 210,000.00 224,259.00 14 Pasang kunci tanam 2 slaag
1.0000 bh Kunci tanam 2 slaag 125,000.00 125,000.00 125,000.00 0.1500 Oh Tukang 80,000.00 12,000.00 12,000.00 0.0150 Oh Kepala tukang 85,000.00 1,275.00 1,275.00 0.0001 Oh Mandor 90,000.00 9.00 9.00 0.0150 Oh Pekerja 65,000.00 975.00 975.00 Jumlah 14,259.00 125,000.00 139,259.00
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp)
15 Pasang kunci tanam 1 slaag
1.0000 bh Kunci tanam 1 slaag 110,000.00 110,000.00 110,000.00 0.1500 Oh Tukang 80,000.00 12,000.00 12,000.00 0.0150 Oh Kepala tukang 85,000.00 1,275.00 1,275.00 0.0001 Oh Mandor 90,000.00 9.00 9.00 0.0150 Oh Pekerja 65,000.00 975.00 975.00 Jumlah 14,259.00 110,000.00 124,259.00 F PEKERJAAN SANITASI
1 Memasang 1 buah kloset duduk 1.0000
bh Kloset duduk 1,850,000.00 1,850,000.00 1,850,000.00 6% x Perlengkapan ( 6 % X Harga kloset ) 1,850,000.00 111,000.00 111,000.00 1.1000 Oh Tukang 80,000.00 88,000.00 88,000.00 0.0010 Oh Kepala tukang 85,000.00 85.00 85.00 0.1600 Oh Mandor 90,000.00 14,400.00 14,400.00 3.3000 Oh Pekerja 65,000.00 214,500.00 214,500.00 Jumlah 316,985.00 1,961,000.00 2,277,985.00 2 Memasang 1 buah washtafel
1.0000 unit Washtafel 550,000.00 550,000.00 550,000.00 12% Perlengkapan 550,000.00 66,000.00 66,000.00 6.0000 kg Semen 1,500.00 9,000.00 9,000.00 0.0100 m3 Pasir pasang 310,000.00 3,100.00 3,100.00 1.4500 Oh Tukang 80,000.00 116,000.00 116,000.00 0.1500 Oh Kep.tukang 85,000.00 12,750.00 12,750.00 1.2000 Oh Pekerja 65,000.00 78,000.00 78,000.00 0.1000 Oh Mandor 90,000.00 9,000.00 9,000.00 Jumlah 215,750.00 628,100.00 843,850.00 3 Memasang 1 buah Urinoir
1.0000 unit Urinoir 750,000.00 750,000.00 750,000.00 12% Perlengkapan 750,000.00 90,000.00 90,000.00 6.0000 kg Semen 1,500.00 9,000.00 9,000.00 0.0100 m3 Pasir pasang 310,000.00 3,100.00 3,100.00 1.4500 Oh Tukang 80,000.00 116,000.00 116,000.00 0.1500 Oh Kep.tukang 85,000.00 12,750.00 12,750.00 1.2000 Oh Pekerja 65,000.00 78,000.00 78,000.00 0.1000 Oh Mandor 90,000.00 9,000.00 9,000.00 Jumlah 215,750.00 852,100.00 1,067,850.00 4 Memasang 1 buah floor drain
1.000 bh Floor drain 30,000.00 30,000.00 30,000.00 0.100 Oh Tukang 80,000.00 8,000.00 8,000.00 0.010 Oh Kepala tukang 85,000.00 850.00 850.00 0.005 Oh Mandor 90,000.00 450.00 450.00 0.010 Oh Pekerja 65,000.00 650.00 650.00 Jumlah 9,950.00 30,000.00 39,950.00 5 Memasang 1 buah kran
1.000 bh Kran 30,000.00 30,000.00 30,000.00 0.100 Oh Tukang 80,000.00 8,000.00 8,000.00 0.010 Oh Kepala tukang 85,000.00 850.00 850.00 0.005 Oh Mandor 90,000.00 450.00 450.00 0.010 Oh Pekerja 65,000.00 650.00 650.00 Jumlah 9,950.00 30,000.00 39,950.00 6 Memasang 1 m1 pipa PVC tipe AW 4"
1.2000 m1 Pipa PVC 4" 35,000.00 42,000.00 42,000.00 35% Perlengkapan 35,000.00 12,250.00 12,250.00 0.0600 Oh Tukang 80,000.00 4,800.00 4,800.00 0.0060 Oh Kep.tukang 85,000.00 510.00 510.00 0.0360 Oh Pekerja 65,000.00 2,340.00 2,340.00 0.0018 Oh Mandor 90,000.00 162.00 162.00 Jumlah 7,812.00 54,250.00 62,062.00
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp)
7 Memasang 1 m1 pipa PVC tipe AW 3"
1.2000 m1 Pipa PVC 3" 28,500.00 34,200.00 34,200.00 35% Perlengkapan 28,500.00 9,975.00 9,975.00 0.0600 Oh Tukang 80,000.00 4,800.00 4,800.00 0.0060 Oh Kep.tukang 85,000.00 510.00 510.00 0.0360 Oh Pekerja 65,000.00 2,340.00 2,340.00 0.0018 Oh Mandor 90,000.00 162.00 162.00 Jumlah 7,812.00 44,175.00 51,987.00 8 Memasang 1 m1 pipa PVC tipe AW 2"
1.2000 m1 Pipa PVC 2" 15,000.00 18,000.00 18,000.00 35% Perlengkapan 15,000.00 5,250.00 5,250.00 0.0600 Oh Tukang 80,000.00 4,800.00 4,800.00 0.0060 Oh Kep.tukang 85,000.00 510.00 510.00 0.0360 Oh Pekerja 65,000.00 2,340.00 2,340.00 0.0018 Oh Mandor 90,000.00 162.00 162.00 Jumlah 7,812.00 23,250.00 31,062.00 9 Memasang 1 m1 pipa PVC tipe AW 3/4"
1.2000 m1 Pipa PVC 3/4" 10,000.00 12,000.00 12,000.00 35% Perlengkapan 10,000.00 3,500.00 3,500.00 0.0600 Oh Tukang 80,000.00 4,800.00 4,800.00 0.0060 Oh Kep.tukang 85,000.00 510.00 510.00 0.0360 Oh Pekerja 65,000.00 2,340.00 2,340.00 0.0018 Oh Mandor 90,000.00 162.00 162.00 Jumlah 7,812.00 15,500.00 23,312.00 10 Memasang 1 m1 pipa PVC tipe AW 0,5"
1.2000 m1 Pipa PVC 0.5" 8,000.00 9,600.00 9,600.00 35% Perlengkapan 8,000.00 2,800.00 2,800.00 0.0600 Oh Tukang 80,000.00 4,800.00 4,800.00 0.0060 Oh Kep.tukang 85,000.00 510.00 510.00 0.0360 Oh Pekerja 65,000.00 2,340.00 2,340.00 0.0018 Oh Mandor 90,000.00 162.00 162.00 Jumlah 7,812.00 12,400.00 20,212.00 G PEKERJAAAN PENGECATAN
1 1 m2 Mengecat dinding/Plafond ( Interior ) 0.2600
kg Cat dinding danabrite 48,000.00 12,480.00 12,480.00 0.1000 kg Cat dasar 30,000.00 3,000.00 3,000.00 0.1000 kg Plamir tembok 42,000.00 4,200.00 4,200.00 1.0000 lbr Kertas gosok 4,000.00 4,000.00 4,000.00 0.0630 Oh Tukang 80,000.00 5,040.00 5,040.00 0.0063 Oh Kepala tukang 85,000.00 535.50 535.50 0.0200 Oh Pekerja 65,000.00 1,300.00 1,300.00 0.0025 Oh Mandor 90,000.00 225.00 225.00 Jumlah 7,100.50 23,680.00 30,780.50 2 1 m2 Mengecat dinding ( Eksterior )
0.2600
kg Cat dinding danashield 70,000.00 18,200.00 18,200.00 0.1000 kg Cat dasar 30,000.00 3,000.00 3,000.00 0.1000 kg Plamir tembok 42,000.00 4,200.00 4,200.00 1.0000 lbr Kertas gosok 4,000.00 4,000.00 4,000.00 0.0630 Oh Tukang 80,000.00 5,040.00 5,040.00 0.0063 Oh Kepala tukang 85,000.00 535.50 535.50 0.0200 Oh Pekerja 65,000.00 1,300.00 1,300.00 0.0025 Oh Mandor 90,000.00 225.00 225.00 Jumlah 7,100.50 29,400.00 36,500.50
HARGA BIAYA BIAYA JUMLAH
SATUAN UPAH BAHAN HARGA
(Rp) (Rp) (Rp) (Rp)
3 1 m2 Mengecat kayu dengan cat Melamik
0.5070 kg Cat melamin 75,000.00 38,025.00 38,025.00 0.0500 kg Pewarna 5,000.00 250.00 250.00 0.0400 kg Dempul 28,000.00 1,120.00 1,120.00 0.4300 kg Sanding 30,000.00 12,900.00 12,900.00 0.0300 ltr Thinner 25,000.00 750.00 750.00 0.1500 lbr Kertas gosok 4,000.00 600.00 600.00 0.5100 Oh Tukang 80,000.00 40,800.00 40,800.00 0.0450 Oh Kepala tukang 85,000.00 3,825.00 3,825.00 0.3000 Oh Pekerja 65,000.00 19,500.00 19,500.00 0.0150 Oh Mandor 90,000.00 1,350.00 1,350.00 Jumlah 65,475.00 53,645.00 119,120.00 4 1 m2 Mengecat kilap kayu ( 2 lapis cat penutup )
0.2000 kg Cat meni 25,000.00 5,000.00 5,000.00 0.1500 kg Dempul 28,000.00 4,200.00 4,200.00 0.1700 kg Cat dasar 28,000.00 4,760.00 4,760.00 0.2600 kg Cat penutup 2x 40,000.00 10,400.00 10,400.00 1.0000 lbr Kertas gosok 4,000.00 4,000.00 4,000.00 0.0090 Oh Tukang 80,000.00 720.00 720.00 0.0060 Oh Kepala tukang 85,000.00 510.00 510.00 0.0700 Oh Pekerja 65,000.00 4,550.00 4,550.00 0.0025 Oh Mandor 90,000.00 225.00 225.00 Jumlah 6,005.00 28,360.00 34,365.00