KAN-TN-LK-01 Issued Number: 4 7 April 2016
Table C.6.1 Description of Sources of Uncertainty
KAN-TN-LK-01 Issued Number: 4 7 April 2016
Table C.6.2 Description Constants Used
KAN-TN-LK-01 Issued Number: 4 7 April 2016
Teks penuh
KAN-TN-LK-01 Issued Number: 4 7 April 2016
KAN-TN-LK-01 Issued Number: 4 7 April 2016
KAN-TN-LK-01 Issued Number: 4 7 April 2016
Gambar
Dokumen terkait
habis pakai yang dibeli yang mempengaruhi mutu pengujian dan/atau kalibrasi tidak digunakan sebelum diinspeksi atau dengan cara lain untuk memverifikasi kesesuaiannya
Dokumen ini tidak dikendalikan jika diunduh/ Uncontrolled when downloaded.. These performance checks are ensured that the. instrument is operating properly and
Dokumen ini tidak dikendalikan jika diunduh/ Uncontrolled when downloaded.. 3.2 The inspection body management shall have regulation , policy or procedures for: a code
ascertain whether the electrical system meets relevant statutory requirements, the system which are fit for purpose (for the example, is the system safe for
place of inspection only. 6.4 The inspection body is under no obligation to refer to or report upon any facts or circumstances, which are outside the specific
a) Pre-purchase survey: Inspection of condition and overall operation of the vessel, covers structural integrity, electrical systems, the propulsion system , the
3.8.2 Inspector who , under direction, can take responsibility for performance of routine inspection should have at least qualification level I (operator) issued
Dokumen ini tidak dikendalikan jika diunduh/ Uncontrolled when downloaded.. Heavy metals analysis, water quality test and use test are performed annually on the water