SPM (Rp) % Thd DIP Target (%) Realisasi (%) SUMBER DIK RUTIN
2002 295.898.000 913.469.484 308,71 100 308,71
2003 341.503.000 1.170.643.000 342,79 100 342,79
2004 351.350.000 1.435.407.664 408,54 100 408,54
2005 - - - - -2006 - - - - -SUMBER DANA APBN
2002 153.048.000 151.282.050 98,85 100 98,85
2003 693.431.000 620.526.368 89,49 100 89,49
2004 249.469.000 245.571.800 98,44 100 98,44
2005 - - - - -2006 - - - - -SUMBER DANA REBOISASI
2002 902.030.000 646.474.400 71,67 100 71,67
2003 906.835.000 777.748.727 85,77 100 85,77
2004 1.532.480.000 1.291.330.698 84,26 100 84,26
2005 - - - - -2006 - - - - -SUMBER DANA DIK-S PSDH
2002 367.008.000 275.158.893 74,97 100 74,97
2003 154.200.000 142.030.450 92,11 100 92,11
2004 120.360.000 114.780.000 95,36 100 95,36
2005 - - - - -2006 - - - - -2.
3.
4.
Tabel 12. 2 REALISASI KEUANGAN DAN FISIK PROYEK PEMBANGUNAN KEHUTANAN
BALAI KONSERVASI SUMBER DAYA ALAM KALIMANTAN TIMUR
1.
Keadaan Fisik Keadaan Keuangan
No. Tahun Anggaran
SPM (Rp) % Thd DIP Target (%) Realisasi (%) SUMBER DANA SKOR
2002 466.491.200 293.043.200 62,82 100 62,82
2003 401.300.000 237.870.000 59,27 100 59,27
2004 163.040.000 120.000.000 73,60 100 73,60
2005 - - - - -2006 - - - - -SUMBER DANA GNRHL
2002 - - - - -2003 - - - -
-2004 623.518.000 267.898.000 42,97 100 42,97
2005 - - - - -2006 - - - - -DIPA BA 29 BKSDA
2003 - - - - -2004 - - - -
-2005 2.225.750.000 2.652.076.881 119,15 100 119,15
2006 6.334.981.000 6.352.712.109 100,28 100 100,28
2007 7.905.610.000 6.112.485.180 77,32 100 77,32
DIPA BA 69 BKSDA
2003 - - - - -2004 - - - -
-2005 3.969.678.000 815.658.000 20,55 100 20,55
2006 3.539.669.000 3.197.886.000 90,34 100 90,34
2007 3.539.669.000 25.543.232.250 92,14 100 92,14
7.
8.
Tahun 5.
6.
Keadaan Keuangan Keadaan Fisik