• Tidak ada hasil yang ditemukan

2008 Standard Drawings 201209141232076897

N/A
N/A
Sugiyan toro

Academic year: 2025

Membagikan "2008 Standard Drawings 201209141232076897"

Copied!
47
0
0

Teks penuh

(1)

STANDARD

DRAWINGS

(2)

December 2008 Standard Specifications

Rev. 0

I N D E X

DISTRICT STANDARD DRAWINGS INSTALLATION DETAILS Drawing

No. Description AV-1-08 1" and 2" Air Valve

BP-1-08 Backflow Preventer, Reduced Pressure Assembly, 2” and Smaller Service

BP-2-08 Backflow Preventer, Reduced Pressure Assembly, 3” and Larger Domestic Service

BP-3-08 Backflow Preventer, Reduced Pressure Assembly, 3” and Larger Fire Service

CL-1-08 Clearance Requirements for Water Mains from Other Utilities and Structures CL-2-08 Horizontal and Vertical Clearance Requirements between Water Mains and

Sanitary Sewers

CL-3-08 Horizontal and Vertical Clearance Requirements between Water Mains and Storm Drains

CL-4-08 Clearance Requirements for Water Mains, Services and Other Facilities CL-5-08 Clearance Requirements for Meter, Vault and Other Facility Installations

ET-0-08 Electrolysis Test Station General Notes

ET-1-08 Electrolysis Test Station Bonding Wire and Test Lead Connections for Steel Pipe ET-2-08 Electrolysis Test Station Steel Pipe Calibration Span

ET-3-08 Electrolysis Test Station Marker Post Installation Details Undeveloped Areas ET-4-08 Electrolysis Test Station Developed Areas

ET-5-08 Electrolysis Test Station Steel Pipe Encasement Test Station

ET-6-08 Electrolysis Test Station Insulating Joint Test Station, Non-insulating Joint Bonding and Flanged Joint Bonding on Steel Pipelines

ET-7-08 Electrolysis Test Station Anode Connection

FH-1-08 Fire Hydrants

FH-2-08 Fire Hydrant Locations JP-1-08 New Main Jumper Piping MP-1-08 Marker Post and Curb Markings

S-1-08 1" Service Line for 3/4" and 1" Meters without Fire Sprinkler Connections

S-2-08 1-1/2" and 2" Service Lines, 1-1/2” and 2” Meters without Fire Sprinkler Connections

S-3-08 1” Service Line, 3/4" and 1" Meters without Fire Sprinkler Connections

S-4-08 1-1/2" Service Line and Meter in Dual Meter Box for Residences with Fire Sprinklers

(3)

December 2008 Standard Specifications

Rev. 0

I N D E X

DISTRICT STANDARD DRAWINGS INSTALLATION DETAILS Drawing

No. Description

S-5-08 1-1/2" Service Line and 1" Meter in Dual Meter Box for Residences with Fire Sprinklers

S-6-08 1-1/2" Service Line and 1" Meter in Single Meter Box for Residences with Fire Sprinklers

S-7-08 1" Service Line and Meter in Dual Meter Box for Residences with Fire Sprinklers S-8-08 1" Service Line and Meter in Single Meter Box for Residences with Fire

Sprinklers

S-9-08 Typical Steel Service Lateral

S-10-08 2” Service Line and Detector Check Valve

S-11-08 Address Labels and Markings for 1” through 2” Service Lines

SP-1-08 Water Quality Sampling Pipe Assembly (Temporary - for Water System Construction)

TB-1-08 Thrust Blocking for PVC Pipe Valve Clusters TB-2-08 Thrust Blocking for PVC Pipe Horizontal Fittings TB-3-08 Standard Blowoff for 6" and 8" PVC Mains TB-4-08 Standard Blowoff for 10" and 12" PVC Mains

TW-1-08 Tracer Wire for Mains and Valves TW-2-08 Tracer Wire for Service Lines

V-1-08 Line Butterfly Valve V-2-08 Line Gate Valve VB-1-08 Valve Box

WSP-1-08 Steel Pipe Welded Joints

WSP-2-08 Welded Steel Offset on PVC Pipe

(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)
(39)
(40)
(41)
(42)
(43)
(44)
(45)
(46)
(47)

Referensi

Dokumen terkait

1) Scratch pada barrel. 2) Scratch pada piston dan kepala piston. 3) Scratch pada pressure valve. 4) Komponen yang telah mencapai life time dan harus di ganti. 6) Clearence

1) Scratch pada barrel. 2) Scratch pada piston dan kepala piston. 3) Scratch pada pressure valve. 4) Komponen yang telah mencapai life time dan harus di ganti. 6) Clearence

1) Pompa penyalur (feed pump) berfungsi untuk menghisap bahan bakar dari tangki dan mengalirkan ke rumah pompa injeksi. 2) Katup pengatur tekanan bahan bakar (pressure control

DATA SCHEDULE Sheet 4 of 5 NO DESCRIPTION UNIT SEC REQUIREMENTS BIDDERS DATA TANKS: 1 Tank construction ºC 2 Top oil temperature for internal pressure of 30kN/m² 3 Steady load

The humerus of Menura differs from that of Chlamydera Figure 10 as follows: 1 much smaller relative to overall body size; 2 ectepi- condylar process reduced, less spur-like; 3 capi- tal