IMPROVING PRODUCTIVITY IN TRIMMING X-CLASS ASSEMBLY Page88of105 LINES BY IMPLEMENTING LINE BALANCING METHODOLOGY
AND MOTION WASTE REDUCTION
Akmal Novandra Dwiniyanto REFERENCES
Bateman, N., & David, A. (2002). Process improvement programmes: a model for assessing sustainability. International Journal of Operations & Production Management, 22, 515-526.
Boboulos, M. (2010).Automation and Robotics.London: BookBoon.
Boothroyd, G., Knight, W. A., & Dewhurst, P. (2010). Product Design for Manufacture and Assembly.Florida: CRC Press.
Cevikcan, E., Durmusoglu, M. B., & Unal, M. E. (2009). A team-oriented design methodology for mixed model assembly systems. Computers and Industrial Engineering, 56, 576-599.
Crowson, R. (2006). Assembly Processes: Finishing, Packaging, and Automation, Handbook of Manufacturing Engineering.Florida: Taylor & Francis.
Domingo, R., Alvarez, R., Pena, M. M., & Calvo, R. (2007). Materials flow improvement in a lean assembly line: a case study. In Assembly Automation (Vol. 27, pp. 141-7.).
Fattahi, P., & Roshani, A. (2011). A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem. International Journal of Advanced Manufacturing Technology, 53, 363-378.
Freivalds, A., & Niebel, B. (2014). Niebel's Methods, Standards, and Work Design.
New York: McGraw-Hill.
Gökçen,, H., Ag˘pak, K., & Benzer, R. (2006). Balancing of parallel assembly lines.
International Journal of Production Economics, 103, 600-609.
Groover, M. P. (2008). Automation, Production Systems, and Computer-Integrated Manufacturing. Upper Saddle River, New Jersey, United States of America:
Pearson Education Inc.
Ho, W., & Emrouznejad, A. (2009). A mathematical model for assembly line balancing model to consider disordering sequence of workstations. Assembly Automation, 29(1), 49-51.
Imai, M. (1997).Gemba Kaizen.New York: McGraw-Hill.
Kellegöz, T., & Toklu, B. (2012). An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstation.
Computers and Operations Research, 39, 3344-3360.
Killbridge, M., & Wester, L. (1961). A Heuristic Method of Assembly Line Balancing.
Journal of Industrial Engineering, 12, 292-298.
Langenwalter, G. (2001). Green Manufacturing. New York: Association for Manufacturing Excellence.
Masood, S. (2006). Line balancing and simulation of an automated production transfer line.Assembly Automation, 26(1), 69-74.
IMPROVING PRODUCTIVITY IN TRIMMING X-CLASS ASSEMBLY Page89of105 LINES BY IMPLEMENTING LINE BALANCING METHODOLOGY
AND MOTION WASTE REDUCTION
Akmal Novandra Dwiniyanto Monden, Y. (1983).The Toyota Production System.Portland: Productivity Press.
MOODIE, C. L., & YOUNG, H. H. (1965). A Heuristic Method of Assembly Line Balancing for Assumptions of Constant or Variable Work Element Times. J.
Industrial Engineering, 16, 23-29.
Ortiz, C. (2006). Kaizen Assembly: Designing, Constructing, and Managing a Lean Assembly Line.Florida: Taylor & Francis.
Pecht, M., Tanner, J. P., & Sheth, V. (2006).Assembly Line Design.London: Springer.
Prashar, A. (2014). Redesigning an assembly line through Lean-Kaizen: an Indian case.The TQM Journal, 26(5), 475-498.
Sánchez, A., & Pérez, M. (2001). Lean indicators and manufacturing strategies.
International Journal of Operations and Production Management, 21, 1433- 1452.
Sharma, V., Qadri, A., Rai, A., & Mohd, D. (2016). Modeling lean implementation for manufacturing sector.Journal of Modelling in Management, 11(2), 2.
Shingo, S. (1981). Study of the Toyota Production Systems. Tokyo: Japan Management Association.
Tabucanon, M., & Changli, W. (1993). Balancing Method for a Semiautomatic Production Line. InIntegrated Manufacturing Systems(pp. 4-10).
Toksar, D. M., Selçuk, K., Ertan, L., Ömer, G., & Baykoç,, F. (2010). Simple assembly line balancing problem under the combinations of the effects of learning and deterioration.Assembly Automation, 30(3), 268-275.
Türkmen, A., Yesil, Y., & Kayar, M. (2016). Heuristic production line balancing problem solution with MATLAB software programming. International Journal of Clothing Science and Technology, 28(6).
Uddin, M. K. (2010). Assembly Automation.An integrated approach to mixed-model assembly line balancing and sequencing, 30(2), 164-172.
Usubamatov, R., Riza, A. R., & Murad, M. N. (2012). A method for assessing productivity in unbuffered assembly processes. Journal of Manufacturing Technology Management, 123 - 139.
Womack, J., & Jones, D. (1996).Lean Thinking; Banish Waste and Create Wealth for Your Corporation.New York: Simon and Schuster.
Yilmaz, H., & Yilmaz, M. (2015). Multi-manned assembly line balancing problem with balanced load density.Assembly Automation, 35(1), 137-142.