DAFTAR PUSTAKA
Abramson, Lee W, dkk. 2002. Slope Stability and Stabilization Methods, 2nd Edition, Wiley and Sons Inc. New York.
Bieniawski, Z.T. 1984, Engineering Rock Mass Classification. John Wiley &
Sons Inc. Canada.
Cherianto, Octovian. 2014. Analisis Kestabilan Lereng Dengan Metode Bishop.
Jurnal Teknik Sipil Statik Vol. 2 No. 3. Universitas Sam Ratulangi.
Manado.
Das, Braja M, 2006. Principles of Geotechnical Engineering 7th Edition. Cengage Learning. Stamford USA.
Hoek, Evert and John Bray. 1981. Rock Slope Engineering Revised 3rd Edition.
The Institution of Mining and Metallurgy. London.
Huang, Yang H. 1983. Stabilty Analisis of Earth Slope. Van Nostrand Reinhold Company Inc. New York.
Hudson, John A. and John P. Harrison. 1997. Engineering Rock Mechanics.
Elsevier Science Ltd. Oxford United Kingdom.
KESDM RI, KEPMEN No. 1827 K/ 30/ MEM. 2018. Tentang Pedoman Pelaksanaan Kaidah Teknik Pertambangan Yang Baik. Jakarta.
LAPI ITB. 2013. Dokumen Re-desain Tambang Tanah Liat Daerah Mliwang. PT.
LAPI ITB. Bandung.
Trijayanti, Hana. 2017. Analisi Kestabilan Lereng Tambang Kuari Tanah Liat KSO Mliwang Timur PT. Semen Indonesia. UPN. Yogyakarta.
Seksi Perencanaan dan Pengawasan Tambang. Laporan Eksplorasi Tanah Liat Daerah Mliwang PT. Semen Indonesia (Persero) Tbk. Tuban.
Stacey, Peter, dkk. 2009. Factors in the Design of Open Pit Slopes – A reviewer’s Perspective. Institute of Mining and Metallurgy.The South African.
Standar Nasional Indonesia, SNI. 2017. Persyaratan perancangan geoteknik, SNI 8460:2017,ICS 91.010.01, Badan Standarisasi Nasional. Jakarta.
Wylie, C. Duncan dan Christoper W. Mah. 2004. Rock Slope Engineering Civil and Mining 4th Edition. Spon Press. New York.
LAMPIRAN
Tabel 1-1. Data Curah Hujan Tahun 2008 – 2017 (mm)
Sumber : Seksi Pemantauan Lingkungan PT. Semen Indonesia (Persero) Tbk.
Keterangan : Curah Hujan Maksimal
Gambar 1-1. Grafik Curah Hujan PT. Semen Indonesia (Persero) Tbk.
2008-2017 (mm)
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Januari 43,30 48,10 81,73 72,12 73,00 33,65 65,39 30,29 29,33 80,77 55,77 Februari 81,70 31,30 62,98 34,62 67,31 3,85 33,65 43,27 64,40 151,44 57,45 Maret 72,10 30,30 110,58 78,85 75,00 40,39 81,73 93,27 27,90 113,46 72,36 April 52,90 59,60 113,46 45,19 0,00 77,89 43,75 20,19 85,10 43,75 54,18 Mei 70,20 50,50 49,04 91,35 53,85 79,81 4,81 3,85 63,50 28,85 49,58 Juni 1,40 38,50 91,35 0,00 29,81 10,58 0,00 2,40 136,50 30,77 34,13 Juli 0,00 24,40 86,54 0,00 67,31 25,96 12,02 0,00 36,54 47,12 29,99 Agustus 0,00 0,00 14,42 0,00 0,00 0,00 14,42 0,00 40,90 0,00 6,97 September 0,00 12,02 72,12 12,50 0,00 0,00 0,00 0,00 30,30 0,00 12,69 Oktober 26,00 0,00 144,23 2,88 1,92 43,27 4,81 0,00 109,60 30,77 36,35 November 48,10 14,40 48,08 43,27 0,00 20,19 0,00 7,69 55,30 36,54 27,36 Desember 0,00 0,00 0,00 79,81 73,08 120,19 116,35 0,00 44,20 35,58 46,92 Total 395,70 309,12 874,53 460,59 441,28 455,78 376,93 200,96 723,57 599,05
Jumlah Curah Hujan Maksimum 1.069,63
Jumlah Curah Hujan Rata-rata 106,96
Bulan Rata-rata
Gambar 1-2. Peta Tektonik dan Sesar Aktif di Indonesia (Sumber: Kem. PU, 2010)
Gambar 1-3. Gempa Periode Ulang 500 Tahun (Sumber : Dr.
M.Asrurifak, dkk.)