• Tidak ada hasil yang ditemukan

ASSIGNMENTS 2 ABSTRACT REVIEW LITERATURE

N/A
N/A
Agus Ruhimat

Academic year: 2023

Membagikan "ASSIGNMENTS 2 ABSTRACT REVIEW LITERATURE"

Copied!
3
0
0

Teks penuh

(1)

FORMAT ASSIGNMENT 2

ASSIGNMENTS 2

ABSTRACT REVIEW LITERATURE NAME : Agus Ruhimat

NIM : 263022300012

A. ARTICLE #1

1 TITLE Workforce production planning under uncertain learning rates

2 AUTHOR(s) Cavagnini, Rossana

3 JOURNAL (Q1 or Q2) International Journal of Production Economics

4 VOLUME Volume 225

5 ISSUE 107590

6 YEAR 2020

7 URL https://doi.org/10.1016/j.ijpe.2019.107590

8 RESEARCH BACKGROUND The paper centers on a product manufacturer's efforts to harness human learning for workforce development and cost reduction.

9 KNOWLEDGE GAP The study indicates that, in assignment decisions, the mean learning rate is a critical factor to consider.

10 NEED STATEMENT The authors present a two-stage stochastic programming model for the production planning problem. This model incorporates worker assignment decisions, considering an exponential learning curve.

The learning curve is linearized to create a mixed- integer linear program for efficient solution.

B. ARTICLE #2

1 TITLE An Integrated Two-Stage Inventory and Workforce Planning Model with Variable Production Rates 2 AUTHOR(s) AlDurgam, Mohammad et al.

3 JOURNAL (Q1 or Q2) Arabian Journal for Science and Engineering

(2)

4 VOLUME 48 (5)

5 ISSUE 7127

6 YEAR 2023

7 URL https://doi.org/10.1007/s13369-022-07458-1

8 RESEARCH BACKGROUND This paper delves into the economic lot-sizing and manpower planning within a two-stage manufacturing system, consisting of a vendor (first stage) and a manufacturer (second stage)

9 KNOWLEDGE GAP The paper explores the consequences of manpower planning decisions on the entire supply chain system.

10 NEED STATEMENT The vendor is considered a leader, and the

manufacturer is a follower in a Stackelberg sequential game. The paper introduces two contracts designed to distribute resulting savings between the vendor and the manufacturer

C. ARTICLE #3

1 TITLE Operator assignment in a labor-intensive

manufacturing cell considering inter-cell manpower transfer

2 AUTHOR(s) Kuo, Yiyo

3 JOURNAL (Q1 or Q2) Computers & Industrial Engineering

4 VOLUME 110

5 ISSUE 83-91

6 YEAR 2017

7 URL https://doi.org/10.1016/j.cie.2017.05.036

8 RESEARCH BACKGROUND This research addresses an operator assignment problem that incorporates inter-cell manpower transfer, aiming to minimize the total required

manpower. The methodology proposed involves two phases to achieve the objectives.

9 KNOWLEDGE GAP The study suggests that the methodology holds

(3)

promise for practical applications, emphasizing its relevance and potential benefits in solving real-world problems.

10 NEED STATEMENT this research contributes a two-phase methodology, utilizing integer and mixed-integer programming, to address the operator assignment problem with inter- cell manpower transfer. The case study provides a practical context, and the experimental results underscore the effectiveness of the proposed approach in terms of manpower savings and efficiency improvements.

Referensi

Dokumen terkait