Press Release

Bumi Resources Minerals Reports Increased Reserve and Resource Tonnage from its Dairi Prima Mineral to 11 Mt and 25 Mt respectively

Bumi Resources Minerals melaporkan peningkatan cadangan dan sumber daya dalam tonase dari Dairi Prima Mineral menjadi masing-masing sebesar 11 juta ton dan 25 juta ton

Jakarta, 10 June 2011

PT Bumi Resources Minerals Tbk. (“BRMS”) is pleased to announce a significant increase in the resource and reserve tonnage for the Anjing Hitam, Lae Jahe, and Base Camp deposits within the PT Dairi Prima Mineral’s concession (“DPM”).

The re-estimates of the mineral resources at all 3 deposits were completed in the 4th quarter of 2010 by the independent geological consultancy, CSA Global (Australia) Limited based on the geological interpretation and wireframe geological models provided by the DPM geologists.

The updated estimate of the combined resources (inclusive of reserves) at the 3 deposits shows a 25%

increase from previously 20.1 million ton to 25.12 million ton at 10.1% Zn and 6% Pb

Jakarta, 10 Juni 2011

PT Bumi Resources Minerals Tbk. (“BRMS”) mengumumkan peningkatan cadangan dan sumber dayanya dalam tonase yang cukup signifikan untuk deposit-deposit di area Anjing Hitam, Lae Jahe, dan Base Camp, yang termasuk dalam konsesinya di PT Dairi Prima Mineral (“DPM”).

Estimasi terakhir terhadap sumber daya mineral dalam ketiga deposit tersebut telah diselesaikan di akhir tahun 2010 oleh konsultan geologi pihak ketiga, CSA Global (Australia) Limited, berdasarkan interpretasi geologis dan model wireframe secara geologis yang diberikan oleh geologis-geologis di DPM.

Estimasi terkini atas total sumber daya (termasuk cadangan) pada ketiga deposit tersebut menunjukan peningkatan sebesar 25% dari sebelumnya sebesar 20,1 juta ton menjadi 25,12 juta ton (10,1% Zn, 6%

Pb).

Sites Combined Minerals Resources

Anjing Hitam 8.11 Mt at 14.6% Zn, 9.1% Pb, and 12 Ag g/t

Lae Jahe 16.18 Mt at 8.2% Zn, 4.5% Pb

Base Camp (shale hosted) 0.49 Mt at 5.5% Zn, 5.7% Pb, and 10 Ag g/t Base Camp (carbonate hosted) 0.34 Mt at 4.2% Zn, 4.0% Pb, and 20 Ag g/t

TOTAL RESOURCE 25.12 Mt at 10.1% Zn, 6.0% Pb

(2)

In February 2011, the Mining Plus Pty. Ltd. completed the Anjing Hitam Mining Study to update the earlier Underground Feasibility Study of July 2010 by Mining Plus and a November 2004 study by AMC Consultants Pty. Ltd.

The updated estimate was based upon the block model provided by CSA Global in October 2010 and revealed a 105% combined reserve increase from previously 5.4 million ton (Anjing Hitam site) to 11 million ton at 11.5% Zn and 6.8% Pb (Anjing Hitam and Lae Jahe sites)

Pada bulan Februari 2011, Mining Plus Pty. Ltd.

menyelesaikan studi penambangan untuk memperbaharui studi kelayakan penambangan bawah tanah yang telah dilakukan pada bulan Juli 2010 oleh Mining Plus dan pada bulan November 2004 oleh AMC Consultants Pty. Ltd.

Hasil estimasi terkini tersebut juga didasari oleh model blok yang disampaikan oleh CSA Global dibulan Oktober 2010 dan menunjukan peningkatan total jumlah cadangan dari sebelumnya sebesar 5,4 juta ton (area Anjing Hitam) menjadi sebesar 11 juta ton yang meliputi area Anjing Hitam dan Lae Jahe (11,5%

Zn, 6,8% Pb)

Sites Combined Minerals Resources

Proven 4.95 Mt at 14.8% Zn, 9.1% Pb, 11.5 Ag g/t Anjing Hitam

Probable 0.93 Mt at 11.3% Zn, 7.0% Pb, 10.1 Ag g/t

Lae Jahe Probable 5.17 Mt at 8.4% Zn, 4.5% Pb, 3.3 Ag g/t

TOTAL RESOURCE 11.05 Mt at 11.5% Zn, 6.8% Pb, 7.5 Ag g/t

Kenneth Farrell, the CEO of BRMS, said,” Another positive news from DPM on top of the recently issued Presidential Decree that supports Underground Mining in the protected forest area. The reserve and resource increase in our 80% owned DPM adds value to its zinc and lead concession and to BRMS on the consolidated basis.”

Kenneth Farrell, Direktur Utama BRMS, mengatakan,”

Ini merupakan berita positif, selain kabar baik mengenai dikeluarkannya Peraturan Presiden yang mendukung penambangan bawah tanah di lokasi hutang lindung bulan lalu. Peningkatan cadangan dan sumber daya dalam tonase dari DPM yang dimiliki 80% oleh BRMS, memberikan penambahan nilai terhadap konsesi seng dan timah hitamnya, dan juga terhadap BRMS secara terkonsolidasi.”

For any questions relating to this release, please contact: Herwin Hidayat – Investor Relations PT Bumi Resources Minerals Tbk.

at 021 5794 5698. Other related Company informations can be found at www.bumiresourcesminerals.com

Sincerely,

Herwin W. Hidayat V.P. – Investor Relations

PT Bumi Resources Minerals Tbk.