• Tidak ada hasil yang ditemukan

Deni Bakhtiar

N/A
N/A
Protected

Academic year: 2023

Membagikan "Deni Bakhtiar"

Copied!
2
0
0

Teks penuh

(1)

DETERMINING CRITICAL FACTORS PROJECT DELAY

Page 97 of 99 AND EFFECTING COST OVERRUNS IN TELECOMMUNICATION MOBILE NETWORK PROJECTS

Deni Bakhtiar

REFERENCES

Alaghbari et al. (2007) ‘The significant factors causing delay of building construction projects in Malaysia’, Eng. Constr. Archit. Manag, 14, pp. 192–206.

Ali et al. (2010) ‘Cost performance for building construction projects in Klang Valley’, J. Build.

Perform, 1, pp. 110–118.

Antonakis & Dietz (2011) ‘Looking for validity or testing it? The perils of stepwise regression, extreme-score analysis, heteroscedasticity, and measurement error.’, Personality and Individual Differences, 50, pp. 409–415. doi: 10.1016/j.paid.2010.09.014.

Azlan and Syuhada (2014) ‘Delay in government project delivery in Kedah, Malaysia’, pp. 248–254.

Burke, R. (2010) Fundamentals of project management: tools and techniques. Burke Pub, Ringwood.

Creswell, J. W. (2012) ducational research: Planning, conducting, and evaluating quantitative and qualitative research. 4th edn. Boston, MA: Pearson.

Hamzah et. al (2011) ‘Cause of construction delay - Theoretical framework’, 2nd International Building Control Conference, IBCC 2011, 20(2011), pp. 490–495.

Hassan et. al. (2016) ‘KONSTRUKSI DAN ALTERNATIF PENYELESAIANNYA ( STUDI KASUS : DI MANADO TOWN SQUARE III )’, 4(11).

Ismail et al. (2014) ‘Expert opinion on risk level for factors affecting time and cost overrun along the project lifecycle in Malaysian construction projects’, Int. J. Constr. Technology Manag, 1, pp. 10–15.

Jacob, S. B. and (2013) ‘Significant Causes and Effects of Project Delays inthe Niger Delta Region, Nigeria’, SAIIE25Proceedings: Stellenbosch South Africa, pp. 641–654.

Jamaludin et al. (2014) ‘Enhancing the quality of construction environment by minimizing the cost variance’, Procedia - Social and Behavioral Sciences, 153, pp. 70–78.

JP Steyn (2015) ‘The theory of measurement for projects : A methodology to enhance the execution of projects’, (November).

K Ullah et. al. (2017) ‘Theoretical framework of the causes of construction time and cost overruns’.

doi: 10.1088/1757-899X/271/1/012032.

Keith, T. Z. (2015) Multiple Regression and Beyond: An Introduction to Multiple Regression and Structural Equation Modeling. 2nd edn. New York, NY: Taylor & Francis.

Kominfo (2017) ‘Laporan Kinerja 2017’.

Memon et al. (2010) ‘Factors affecting construction cost performance in project management projects :Perspective of project management consultant’, Int. J. Sustain. Constr. Eng. Technol, 1, pp.

30–35.

Memon et al. (2011) ‘Preliminary study on causative factors leading to construction cost overrun’, Int.

J. Sustain. Constr. Eng. Technol., 2, pp. 57–71.

Mohabuth, A. Q. (2017) ‘A Study of the Identification of the Factors that Lead to Time Delays in Software Development’, International Journal of Computer (IJC), 45, pp. 141–148.

Mydin et al. (2014) ‘Assessment of influential causes of construction project delay in Malaysian private housing from developer’s viewpoint’, E3S Web of Conf., 3.

(2)

DETERMINING CRITICAL FACTORS PROJECT DELAY

Page 98 of 99 AND EFFECTING COST OVERRUNS IN TELECOMMUNICATION MOBILE NETWORK PROJECTS

Deni Bakhtiar Osborne, J. W. and Waters, E. (2017) ‘Four Assumptions Of Multiple Regression That Researchers Should Always Test’, (January 2002).

PMI (ed.) (2017) A guide to the project management body of knowledge - PMBoK. 6th ed. 6th Editio.

PMI Standards Committee.

PMI (2018) ‘Success in Disruptive Times’.

Rafat, K. F. and Ahmed, R. (2017) ‘Empirical Study on Causes of Project Delays’, 11(1), pp. 166–174.

Rahman et al. (2012) ‘Time and cost performance of costruction projects in southern and cenrtal regions of Penisular Malaysia’, IEEE Colloquium on Humanities, Science & Engineering Research, pp.

52–57.

Rahman et al. (2013) ‘Significant factors causing cost overruns in large construction projects in Malaysia’, J. Appl. Sci, 13, pp. 286–293.

Ramanathan et al. (2012) ‘Analysis of time and cost overrun in Malaysian construction’, Adv. Mater.

Res, 45, pp. 1002–1008.

Ramang et. al. (2017) ‘Faktor-faktor keterlambatan proyek jalan raya di kota kupang berdasarkan persepsi stakeholder’, VI(1), pp. 103–116.

Shehu et al. (2014) ‘Cost overrun in the Malaysian construction industry projects: A deeper insight’, Int. J. Proj. Manag, 32, pp. 1471–1480.

Sullivan, F. and (2018) ‘Digital Market Overview : Indonesia’, A Frost & Sullivan White Paper.

Sunyoto, D. (2013) Analisis Data Ekonomi dengan Menggunakan SPSS. 1st edn. PT Indeks.

Suyatno (2010) ‘Analisis faktor penyebab keterlambatan penyelesaian proyek gedung’.

Telkom (2017) Laporan Tahunan 2017.

The Standish Group (2017) Chaos Report, Standish Group - Chaos Report. doi:

10.1145/1145287.1145301.

Uyanik and Guler (2013) ‘A Study on Multiple Linear Regression Analysis’, Elsevier - 4th International Conference on New Horizons in Education, 106(2013), pp. 234–240. doi:

10.1016/j.sbspro.2013.12.027.

Referensi

Dokumen terkait