• Tidak ada hasil yang ditemukan

Digital Project Worksheet - AURA - Alfred University

N/A
N/A
Protected

Academic year: 2023

Membagikan "Digital Project Worksheet - AURA - Alfred University"

Copied!
3
0
0

Teks penuh

(1)

Digital Project Worksheet

Date__________________________

Project Name __________________________________________________________________

Project Manager________________________________________________________________

Other Project Staff______________________________________________________________

Project Description______________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

Target Completion Date__________________________________________________________

Target Repository

☐ AURA ☐ JSTOR Forum ☐ Historic New York ☐ Other______________________________

☐ Project manager has established that sufficient information is available to provide useful metadata

Metadata scheme: ☐ Dublin Core ☐ VRA Core ☐Other______________________________

☐ this project requires that a new collection be established in the repository

☐ this project requires a new data entry template

Rights

☐ source materials are in public domain

☐ source materials are owned by Alfred University

☐ copyright holder is willing to confer distribution rights and documentation is on file

☐ at least two attempts have been made to contact the copyright holder without success, the material does not pose an undue risk, and documentation is on file

Preservation

Is long-term access to digital surrogates a project goal?

☐ yes ☐ no

Is the original material fragile? If yes, please describe any special handling requirements:

File Management

Scanning/file conversion standards:

Master file ☐ Required File type: Resolution:

Access file ☐ Required File type: Resolution:

Thumbnail ☐ Required File type: Resolution:

(2)

File Naming Conventions

Master files ____________________________________________________________________

Access files ____________________________________________________________________

File Storage Location:____________________________________________________________

______________________________________________________________________________

Post imaging workflow requirements (All edits should be made on derivative and not the Master File)

☐ crop background ☐ de-skew ☐ check for all pages and page order ☐ color correct Project Notes

Project Maintenance

Project Checklist

☐ Project presented to Archives and Digitization Teams for input

☐ Project file created

☐ Materials gathered

☐ Staffing assigned and trained

☐ Equipment identified

☐ Metadata requirements documented

☐ Collection created in repository

☐ Metadata template created

☐ Scanning completed

☐ Post-imaging work completed and reviewed by Project Manager for quality control

☐ Metadata reviewed by Project Manager

☐ Metadata and images uploaded to repository

☐ Master files moved to dark storage

☐ Project evaluation completed and discussed with Archives and Digitization Teams

Date of Project Evaluation________________________________________________________

Project Evaluation Notes

______________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

(3)

Revised April 2020

Referensi

Dokumen terkait

Based on Table 3.6 above can be interpreted that the value of R square R ² were obtained by 0.380 , which means that 38 % of passenger satisfaction Y aircraft flight services are in