FORM BILL OF QUANTITY (BOQ)

N/A
N/A
Buga Efpa789

Academic year: 2024

Membagikan " FORM BILL OF QUANTITY (BOQ)"

Copied!
9
0
0

Teks penuh

(1)

No. Dok. F/EC/01-02

No. Rev. 00

Tgl. Eff. 06 September 2022

Halaman 1 dari 1

Document Number

Work Request Number Job Location

Drawing Name

Job name Drawing Number

Price/Unit Total Price Price/Unit Total Price

I

1 Soil bearing capacity test

- Test CBR Site 5.00 point

- Test CBR Labolatory 1.00 sample

2 Mob Demob Vibro Roller Capacity 25 Ton 1.00 ls

3 Rental Vibro Roller + fuel + operator 98.00 hours

4 Mob Demob Excavator 1.00 ls

5 Rental Excavator + fuel + operator 98.00 hours

6 Fill side road Sirtu (Sand & Stone) 70.00 m3

7 Fill base road Sirtu (Sand & Stone) 100.00 m3

-

Rp Rp - II

1 Lean Concrete Quality B0 NFA 52.00 m3

2 Concrete Quality K-350 NFA 130.00 m3

3 Wiremesh Size 2.10 m x 5.40 m x M10 / sheet 4827.50 kg

4 Dowel Steel RB Ǿ25 @12 m, include zincromate & anti lengket 836.23 kg

5 RB Ǿ12 @12 m 1324.91 kg

6 Tie Beam DB 16 @12 m 147.55 kg

7 RB Ǿ12 @12 m 818.06 kg

8 Korset for wiremesh / 50 cm2 RB Ǿ10 @12 m 123.50 kg

9 Cutting & Asphal Expanseal 100 @25 kg 226.25 m

10 Treatment conecting existing concrete with new concrete Sika bonding adhesive 100.00 m

11 Plastic Cast 505.00 m2

Preparation Work

Sub Total Preparation Work Rigid Pavement Work

No. Item Name Specification Qty Unit Material Labor Cost

Remarks

: : RMI - Brongkos

Section : IR : Rigid Pavement

: Rigid Pavement - Estimation per 5 m x 100 m :

PT. REJOSO MANIS INDO FORM

BILL OF QUANTITY (BOQ)

:

(2)

12 Bekisting / wood formwork Multipleks 12 mm + kayu kelas kuat III*

Termasuk pengecekan level dengan waterpass optic 140.00 m2

-

Rp Rp - -

Rp Rp - - Rp

Inspector

Date :

Name : Mr. Hengki Timatius

Date : Date : Date :

Name : Mr. Fahri Name : Mr. Kasio Name : Mr. Purisup Silanguen

Total material cost, equipment and labor (Rp.)

Engineer Approver Approver

Sub Total Rigid Pavement Work Total

(3)

4.00 4.00 4.00

2.502.50 5.00

R D R A D

SKALA 1 : 150

ARS 01-03

Wiremesh M10 - 1 layer Tie Beam

Ruji / Dowel Concrete K-350

0.75 0.75

0.30 0.30

XX-XX

1

XX-XX

1

XX-XX

2

XX-XX

2

(4)

SECTION 2-2

S 1 2

S -

C

- T 2 C

2

C 12-

- 12 1 2 -

S 2

- 12 C

12- 1 -

C T 1 C

E S S

2

SECTION 1-1

S 1 2

S 2-

C

- T 2 C

2

1

S 2

- 12 C

12-

1 - C T 1 C

E S

S

2

(5)

DETAIL RUJI / DOWEL

S ALA

ARS

RB

W M

A RB

DETAIL TIE BEAM

S ALA

ARS

W M

A DB

RB

L M L M

HAIRA RB

HAIRA RB

L L L

/ L

L L

/ A

A L

D D

W M

RB

DETAILS UPHILL ROAD

S ALA

ARS

RB

L T

E S

RB

E R

R P L M

B T

(6)

Actual Design : Next Work : Casting Lean Concrete 10 cm

Quality Control : Check list

1 Already compact per layer 2 No have protruding surfaces 3 No have deflection surface 4 Size area already same with road plan 5 Casting plastic ready

6 Tool work ready - (Vibrator, Backet, Gutter, Beam, etc) 7 Man power, Supervisor & Safety already complete

8 -

Noted :

1 …...

2 …...

3 …...

4 …...

5 …...

6 …...

DETAIL

FORM APPROVAL WORK

ENGINEERING CENTER

PROJECT : RIGID PAVEMENT

Location Work : Zone 1

VIEW ALL WORK

Rejoso, 01 Januari 2023

(Mr. Fahri) Date : .../.../...

Civil Engineer

(Mr. L. Hengky Timatius) Date : .../.../...

Engineering Assistance Manager

(Mr. Purisup Silanguen) Date : .../.../...

Engineering Manager (Mr. Zainuri)

Date : .../.../...

Project Supervisor (Mr...)

Date : .../.../...

Supplier

(7)

Actual Design : Next Work : Install Dowel, Tiebars, Wiremesh & Formwork

Quality Control : Check list

1 Lean concrete finish 2 Level already good

3 The age of the lean concrete is sufficient 4 Surface lean concrete already clean

5 Tool work ready - (Vibrator, Backet, Gutter, Beam, etc) 6 Man power, Supervisor & Safety already complete

7 -

8 -

Noted :

1 …...

2 …...

3 …...

4 …...

5 …...

6 …...

DETAIL

FORM APPROVAL WORK

ENGINEERING CENTER

PROJECT : RIGID PAVEMENT

Location Work : Zone 1

VIEW ALL WORK

Rejoso, 01 Januari 2023

(Mr. Fahri) Date : .../.../...

Civil Engineer

(Mr. L. Hengky Timatius) Date : .../.../...

Engineering Assistance Manager

(Mr. Purisup Silanguen) Date : .../.../...

Engineering Manager (Mr. Zainuri)

Date : .../.../...

Project Supervisor (Mr...)

Date : .../.../...

Supplier

(8)

Actual Design : Next Work : Casting Concrete K-350

Quality Control : Check list

1 Formwork already good

2 Relat already on check level 3 Tie bars already same drawing 4 Dowel have protection 5 Wiremesh have behel per 1 m2

6 Tool work ready - (Vibrator, Backet, Gutter, Beam, etc) 7 Support material ready - (Concrete Glue)

8 Man power, Supervisor & Safety already complete

Noted :

1 …...

2 …...

3 …...

4 …...

5 …...

6 …...

DETAIL

Rejoso, 01 Januari 2023

VIEW ALL WORK

FORM APPROVAL WORK

ENGINEERING CENTER

PROJECT : RIGID PAVEMENT

Location Work : Zone 1

(Mr. Fahri) Date : .../.../...

Civil Engineer

(Mr. L. Hengky Timatius) Date : .../.../...

Engineering Assistance Manager

(Mr. Purisup Silanguen) Date : .../.../...

Engineering Manager (Mr. Zainuri)

Date : .../.../...

Project Supervisor (Mr...)

Date : .../.../...

Supplier

(9)

Actual Design : Next Work : Unlock traffic

Quality Control : Check list

1 Minimum age of concrete 2 weeks

2 Design strength of the concrete has been achieved 3 Concrete surface has been cut according to the drawing 4 Installation of asphalt / sealant finish

5 The side of the road has been filled with stone 6 The road is clear

7 -

8 -

Noted :

1 …...

2 …...

3 …...

4 …...

5 …...

6 …...

DETAIL

FORM APPROVAL WORK

ENGINEERING CENTER

PROJECT : RIGID PAVEMENT

Location Work : Zone 1

VIEW ALL WORK

Rejoso, 01 Januari 2023

(Mr. Fahri) Date : .../.../...

Civil Engineer

(Mr. L. Hengky Timatius) Date : .../.../...

Engineering Assistance Manager

(Mr. Purisup Silanguen) Date : .../.../...

Engineering Manager (Mr. Zainuri)

Date : .../.../...

Project Supervisor (Mr...)

Date : .../.../...

Supplier