Install & Measure Exercise 2
December 3𝑟𝑑, 2020 Electric Advanced
Training Efective Planning
• First we Install the Circuit same as the worksheet
• After that, we can measure the voltage in the Resistor, Coil, And Capacitor using multimeter.
• The next step we measure using an oscilloscope and compare the results with the voltage that has been obtained from measurements using a multimeter
• In the measurements on the oscilloscope we also measure the phase difference and
• We write the measurement results on paper as report material
Effective Planning
1. Memahami pengelolaan waktu 2. Memahami dan memilih prioritas Agenda
1. Fundamental of planning
• Efficient use of resource
• Establishing Goals
• Managing risk and uncertainly
• Team building
• Creating competitive advantages
Planning ( Proses melakukan serangkaian kegiatan agar efektif dan efisien )
• Kualitas
• Kuantitas
• Biaya
• Waktu
Cara agar membuat rencana bagus
• Insight kemampuan menghimpun data
• Foresight kemampuan memproyeksi jalan dan cara
• Studi eksploratif kemampuan melihat secara keseluruhan
• Doorsight kemampuan untuk mengidentifikasi risk 2. Put theory
S (Specific) M (Measurable) A (Attainable) R (Relevant) T (Time Based)
Mr. Abdullah Arifin Mr. Abdullah Arifin
Menjadi Manager Waktu
Leading Indicator Vs Leaguing Indicator Objective project adalah leaguing indicator Leading indicator adalah target target kecil yang harus dicapai supaya objective tercapai Design untuk membuat cellphone storages Menyiapkan materialnya
Memotong material sesuai dengan designnya Assembly
Finishing dengan cara mengecat dan memberikan hiasan