KNOWLEDGE SHARING INOVASI
17 Pebruari 2022
Berinovasi di PLN
Dr. Zainal Arifin
Executive Vice President Engineering and Technology
The speed at which
technological evolution is taking place is exponential . This
exponential growth is one of the
biggest reason that many people
are struggling to keep up.
Source: The Cap Gemini Ernst & Young Center for Business Innovation (CBI), 2013
Competitive
Advantage
www.pinterest.com/countreygirlblu/weird -invintions/
innovation
DAMPAK INOVASI
TEKNIS
FINANCIAL
EKONOMI
SOSIAL
Source : https://www.sopheon.com/idea-concept-development/
FUNNEL INNOVATION PROCESS
Imagination is more important than knowledge …..
(Albert Einstein)
It’s not about idea.
It’s about making ideas happen.
DIVERGENCE + CONVERGE = INNOVATION
INNOVATOR TRUE STORY
KONTEK STRATEGIC ISSUE
Aset-aset PLN baik pembangkit, transmisi, gardu induk, dan distribusi under utilized dengan Return on Asset hanya 0,4%.
Issue 1 #Overpaid Underutilized
5,40%
4,91%
Average 10 tahun
Average 5 tahun
6,42%
Issue 2 #Perlambatan Demand (3 Tahun terakhir)
§ Additional RE until 2030 is 20.9 GW
§ In the next ten years, the capacity of PV Solar will be built is 4.68 GW and Wind energy is 0.6 GW
Issue 3 #Greener Energy Planning
Issue 4 #Financial Sustainability
Issue 5# Net Zero/Neutral Carbon in 2060
PLN’s Decarbonization
§ No new coal plants awarded after 2022
§ 23% renewables mix by 2025
§ Exit from coal-fired plants by 2056
§ Achieve carbon neutrality by 2060
Low Carbon Technologies
§ Renewable Energy
§ CCS and CCUS
§ Electric Vehicles
§ Biomass Co-firing
§ Small Modular Reactor
§ Storage Energy:
§ Lithium Ion battery
§ Vanadium Redox Flow battery
§ Metal Air battery etc.
Breakthrough innovation comes in two forms: new technology that relies on an
existing business model or a new business model that utilises existing technology .
Replacing 140,000 kilo liters Fuel Oil with Gas using CNG storage, Tambak Lorok CCPP can achieve saving cost up to US$
101 million/year (65% of fuel cost).
POWER PLANT - FUEL CONVERSION (BBM TO CNG)
§ Inovasi berhasil mencegah terjadinya shutdown karena overheating.
RE REHEATER TUBE UNTUK MENINGKATKAN RELIABILITY BOILER PLTU PAITON 1 & 2
Manfaat Finansial sbb:
a. Potensial loss listrik yang dibangkitkan: Rp.16 Milyar b. Biaya start stop: Rp 6,12 Milyar
c. Biaya penggantian tube serta biaya modifikasi:
Rp 3,5 Milyar
d. Total benefit: Rp 25 Milyar/thn
POWER PLANT - REVERSE ENGINEERING
HUMAN CAPITAL SYSTEM - OUTSOURCING SOFTWARE
1. Dengan adanya SI-LAPO, PLN Wilayah Bangka Belitung melakukan monitoring dan
pengawasan ketenagakerjaan lebih mudah dengan waktu penyelesaian 50 % lebih cepat dan juga dampak KPI yang signifikan (HCR OCR, Indek Kepuasan Pelanggan dll.)
2. Cost Saving Rp 8,3 M/tahun
DISTRIBUTION - MEASUREMENT TOOL
Menghasilkan “Gain”
§ Tahun 2015 sebesar Rp. 736.341.111,- setara 873.477 kWh
§ Tahun 2016 sd Maret Rp. 883.609.333,- setara 1.048.172 kWh
Automatic Impuls Voltage Injection (AIVI)
WASTE MANAGEMENT – PUPUK SILIKA ABU PLTU OMBILIN
1. Pupuk Silika dengan
menyediakan pupuk murah dan ramah lingkungan
2. Produksi pupuk Silika
mengkonversi seluruh abu limbah PLTU Ombilin sehingga habis terserap dapat digunakan untuk pupuk bagi 2,75% petani
Sumatera Barat.
3. Potensi saving implementasi
pupuk silika adalah Rp.
,- /thn
No. Deskripsi Pupuk silika Pasaran Pupuk silika Inovasi
1. Kandungan Hara Si 35% >50%
2. Bahan baku pupuk Terak baja, abu vulkanik & jerami
padi Abu pembakaran PLTU
3. Harga Rp120.000,- / Kg Rp 2000,- / 5Kg