500X400
POLYURETHANE
400X400 400X400
500X400
300X300
return return
return
return
CLIENT:
PROJECT LOCATION:
Revision Date
DRAWING TITLE:
NOTES:
SCALE :
DATE :
SHEET NO. : DRAWING NO.:
CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL
1 : 25 20.09.2019
AIR CONDITIONING DUCTING INSTALLATION
01
AGUNG SETIAWAN 01
AIR CONDITIONING DUCTING INSTALLATION
SCALE : 1 : 25 (A3)
DOAN
MALL ARTHA GADING
400 X 400 LOKFOM BJLS 1,2
EXHAUST MACHINE AXIAL TYPE CAPACITY 4.000 CFM 3 PHASE, 380 V
CLIENT:
PROJECT LOCATION:
Revision Date
DRAWING TITLE:
NOTES:
SCALE :
DATE :
SHEET NO. : DRAWING NO.:
CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL
1 : 25 20.09.2019
EXHAUST DUCTING INSTALLATION
01
AGUNG SETIAWAN 01
EXHAUST DUCTING INSTALLATION
DOAN
MALL ARTHA GADING
FRESH AIR MACHINE AXIAL TYPE CAPACITY 2.500 CFM 3 PHASE, 380 V, 1.1 kW 300 X 400 LOKFOM BJLS 1,2
CLIENT:
PROJECT LOCATION:
Revision Date
DRAWING TITLE:
NOTES:
SCALE :
DATE :
SHEET NO. : DRAWING NO.:
CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL
1 : 25 20.09.2019
FRESH AIR DUCTING INSTALLATION
03
AGUNG SETIAWAN 03
FRESH AIR DUCTING INSTALLATION
SKALA : 1 : 25 (A3)
DOAN
MALL ARTHA GADING
PVC AW RUCIKA 2"
GUTTER 600x 250
PVC AW RUCIKA 2"
CLIENT:
PROJECT LOCATION:
Revision Date
DRAWING TITLE:
NOTES:
SCALE :
DATE :
SHEET NO. : DRAWING NO.:
CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL
1 : 25 20.09.2019
WASTE WATER INSTALLATION
04
AGUNG SETIAWAN 04
WASTE WATER INSTALLATION
DOAN
MALL ARTHA GADING
METERAN Pipa PPR PN16 Ø3/4" (cold water)
turun
naik ball valve Ø
12"
CLIENT:
PROJECT LOCATION:
Revision Date
DRAWING TITLE:
NOTES:
SCALE :
DATE :
SHEET NO. : DRAWING NO.:
CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL
1 : 25 20.09.2019
CLEAN WATER INSTALLATION
05
AGUNG SETIAWAN 05
CLEAN WATER INSTALLATION
SKALA : 1 : 25 (A3)
DOAN
MALL ARTHA GADING
1/1
1/2
1/3
1/4
1/5
1/6
1/7
1/8
2/1 2/2 2/3
2/4 2/5
3/2
3/1
3/6
3/5
3/3 3/4
3/7
4/1 4/2 4/3 4/4
5/1 5/2
CLIENT:
PROJECT LOCATION:
Revision Date
DRAWING TITLE:
NOTES:
SCALE :
DATE :
SHEET NO. : DRAWING NO.:
CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL
1 : 25 20.09.2019
LIGHTING INSTALLATION
06
AGUNG SETIAWAN 06
LIGHTING INSTALLATION
DOAN
MALL ARTHA GADING
7/1 7/2 7/3 7/4 7/5
7/6 8/1
8/2
8/3 8/4
8/5
9/1 9/2 9/3 9/4
9/5 9/6
CLIENT:
PROJECT LOCATION:
Revision Date
DRAWING TITLE:
NOTES:
SCALE :
DATE :
SHEET NO. : DRAWING NO.:
CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL
1 : 25 20.09.2019
ELECTRICAL SOCKET INSTALLATION
07
AGUNG SETIAWAN 07
ELECTRICAL SOCKET INSTALLATION
SKALA : 1 : 25 (A3)
DOAN
MALL ARTHA GADING
2.
R S T
INFORMATION
3.
LIGHTING
POWER OUTLET LIGHTING
EXHAUST FAN
HVAC
-
8.761 W
9.637,1 VA
INSTALLED LOADS = ADDITIONAL ALOCATION= 10% LOADS=
TOTAL BEBAN =
96
KITCHEN KITCHEN 1
-
1
UTILITY
10.
POWER 250 W
3P 380 V 2,2 kW POWER OUTLET 3 PHASE5 kW
733,3 5.
6.
4.
-
3P
15
LAMP 2x36 W72 WATT
2 1.
DINING AREA DINING AREA DINING AREA
- -
- -
-
- -
-
- -
4 1
10A NYM 3X2,5 mm2 10A NYM 3X2,5 mm2 10A NYM 3X2,5 mm2 10A NYM 3X2,5 mm2 10A NYM 3X2,5 mm2 10A NYM 3X2,5 mm2 10A
NYM 3X2,5 mm2 16A
16A
NYM 3X2,5 mm2 NYM 3X2,5 mm2
1.800
16A
NYY 4X10 mm2
Q8 Q6 Q5 Q4 Q3 Q2 Q1
Q13 Q14
-
Q9 Q10 Q11
16A
-
5
733,3 733,3
3.068
HL
FLOURESCENT Halogen Lamp12 WATT DL
Down Light8 WATT
- 3
2
72 4
-
- -
- -
FRESH AIR FAN 3P 380 V
1,1 kW
- 1
1
10A 10A
4
125
- -
8.
9.
7.
- - - 1.800
11.
876,1 W
SPARE
-
10A
5 WATT/m'
- - -
25 -
8 DINING AREA
2
- 3
-
-
Strip Lamp
DINING AREA
- SPARE
Q7
18 WATTTrack Lamp
- - 4 - - - -
4 25
KITCHEN AREA
J
6
FURNITURE FEED WALL POWER FEED300 W
- 1
- - SPARE
-
- -
- - - - SPARE
13
52
72 -
-
- 144
- -
- -
POWER
OUTLET POWER
INSTALLED
- - - CASHIER AREA
- 1.300 - DINING AREA
- 6 KITCHEN AREA
- - - -
Q12
16A 16A
366,6 366,6 366,6
2.596 3.097
Q15
CLIENT:
PROJECT LOCATION:
Revision Date
DRAWING TITLE:
NOTES:
SCALE :
DATE :
SHEET NO. : DRAWING NO.:
CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL
1 : 25 20.09.2019
SINGLE LINE DIAGRAM ELECTRICAL INSTALLATION
08
AGUNG SETIAWAN 08
SINGLE LINE DIAGRAM
DOAN
MALL ARTHA GADING
68° 01
68° 03
68° 02
92° 04
BSP SEAMLESS Ø 1"
BSP SEAMLESS Ø 1"
BSP SEAMLESS Ø 1"
CLIENT:
PROJECT LOCATION:
Revision Date
DRAWING TITLE:
NOTES:
SCALE :
DATE :
SHEET NO. : DRAWING NO.:
CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL
1 : 25 20.09.2019
SPRINGKLER INSTALLATION
09
AGUNG SETIAWAN 09