• Tidak ada hasil yang ditemukan

Mall Artha Gading Air Conditioning & Ducting Installation Specifications

N/A
N/A
Agung Setiawan

Academic year: 2023

Membagikan "Mall Artha Gading Air Conditioning & Ducting Installation Specifications"

Copied!
9
0
0

Teks penuh

(1)

500X400

POLYURETHANE

400X400 400X400

500X400

300X300

return return

return

return

CLIENT:

PROJECT LOCATION:

Revision Date

DRAWING TITLE:

NOTES:

SCALE :

DATE :

SHEET NO. : DRAWING NO.:

CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL

1 : 25 20.09.2019

AIR CONDITIONING DUCTING INSTALLATION

01

AGUNG SETIAWAN 01

AIR CONDITIONING DUCTING INSTALLATION

SCALE : 1 : 25 (A3)

DOAN

MALL ARTHA GADING

(2)

400 X 400 LOKFOM BJLS 1,2

EXHAUST MACHINE AXIAL TYPE CAPACITY 4.000 CFM 3 PHASE, 380 V

CLIENT:

PROJECT LOCATION:

Revision Date

DRAWING TITLE:

NOTES:

SCALE :

DATE :

SHEET NO. : DRAWING NO.:

CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL

1 : 25 20.09.2019

EXHAUST DUCTING INSTALLATION

01

AGUNG SETIAWAN 01

EXHAUST DUCTING INSTALLATION

DOAN

MALL ARTHA GADING

(3)

FRESH AIR MACHINE AXIAL TYPE CAPACITY 2.500 CFM 3 PHASE, 380 V, 1.1 kW 300 X 400 LOKFOM BJLS 1,2

CLIENT:

PROJECT LOCATION:

Revision Date

DRAWING TITLE:

NOTES:

SCALE :

DATE :

SHEET NO. : DRAWING NO.:

CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL

1 : 25 20.09.2019

FRESH AIR DUCTING INSTALLATION

03

AGUNG SETIAWAN 03

FRESH AIR DUCTING INSTALLATION

SKALA : 1 : 25 (A3)

DOAN

MALL ARTHA GADING

(4)

PVC AW RUCIKA 2"

GUTTER 600x 250

PVC AW RUCIKA 2"

CLIENT:

PROJECT LOCATION:

Revision Date

DRAWING TITLE:

NOTES:

SCALE :

DATE :

SHEET NO. : DRAWING NO.:

CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL

1 : 25 20.09.2019

WASTE WATER INSTALLATION

04

AGUNG SETIAWAN 04

WASTE WATER INSTALLATION

DOAN

MALL ARTHA GADING

(5)

METERAN Pipa PPR PN16 Ø3/4" (cold water)

turun

naik ball valve Ø

12

"

CLIENT:

PROJECT LOCATION:

Revision Date

DRAWING TITLE:

NOTES:

SCALE :

DATE :

SHEET NO. : DRAWING NO.:

CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL

1 : 25 20.09.2019

CLEAN WATER INSTALLATION

05

AGUNG SETIAWAN 05

CLEAN WATER INSTALLATION

SKALA : 1 : 25 (A3)

DOAN

MALL ARTHA GADING

(6)

1/1

1/2

1/3

1/4

1/5

1/6

1/7

1/8

2/1 2/2 2/3

2/4 2/5

3/2

3/1

3/6

3/5

3/3 3/4

3/7

4/1 4/2 4/3 4/4

5/1 5/2

CLIENT:

PROJECT LOCATION:

Revision Date

DRAWING TITLE:

NOTES:

SCALE :

DATE :

SHEET NO. : DRAWING NO.:

CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL

1 : 25 20.09.2019

LIGHTING INSTALLATION

06

AGUNG SETIAWAN 06

LIGHTING INSTALLATION

DOAN

MALL ARTHA GADING

(7)

7/1 7/2 7/3 7/4 7/5

7/6 8/1

8/2

8/3 8/4

8/5

9/1 9/2 9/3 9/4

9/5 9/6

CLIENT:

PROJECT LOCATION:

Revision Date

DRAWING TITLE:

NOTES:

SCALE :

DATE :

SHEET NO. : DRAWING NO.:

CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL

1 : 25 20.09.2019

ELECTRICAL SOCKET INSTALLATION

07

AGUNG SETIAWAN 07

ELECTRICAL SOCKET INSTALLATION

SKALA : 1 : 25 (A3)

DOAN

MALL ARTHA GADING

(8)

2.

R S T

INFORMATION

3.

LIGHTING

POWER OUTLET LIGHTING

EXHAUST FAN

HVAC

-

8.761 W

9.637,1‬ VA

INSTALLED LOADS = ADDITIONAL ALOCATION= 10% LOADS=

TOTAL BEBAN =

96

KITCHEN KITCHEN 1

-

1

UTILITY

10.

POWER 250 W

3P 380 V 2,2 kW POWER OUTLET 3 PHASE5 kW

733,3 5.

6.

4.

-

3P

15

LAMP 2x36 W72 WATT

2 1.

DINING AREA DINING AREA DINING AREA

- -

- -

-

- -

-

- -

4 1

10A NYM 3X2,5 mm2 10A NYM 3X2,5 mm2 10A NYM 3X2,5 mm2 10A NYM 3X2,5 mm2 10A NYM 3X2,5 mm2 10A NYM 3X2,5 mm2 10A

NYM 3X2,5 mm2 16A

16A

NYM 3X2,5 mm2 NYM 3X2,5 mm2

1.800

16A

NYY 4X10 mm2

Q8 Q6 Q5 Q4 Q3 Q2 Q1

Q13 Q14

-

Q9 Q10 Q11

16A

-

5

733,3 733,3

3.068

HL

FLOURESCENT Halogen Lamp12 WATT DL

Down Light8 WATT

- 3

2

72 4

-

- -

- -

FRESH AIR FAN 3P 380 V

1,1 kW

- 1

1

10A 10A

4

125

- -

8.

9.

7.

- - - 1.800

11.

876,1 W

SPARE

-

10A

5 WATT/m'

- - -

25 -

8 DINING AREA

2

- 3

-

-

Strip Lamp

DINING AREA

- SPARE

Q7

18 WATTTrack Lamp

- - 4 - - - -

4 25

KITCHEN AREA

J

6

FURNITURE FEED WALL POWER FEED300 W

- 1

- - SPARE

-

- -

- - - - SPARE

13

52

72 -

-

- 144

- -

- -

POWER

OUTLET POWER

INSTALLED

- - - CASHIER AREA

- 1.300 - DINING AREA

- 6 KITCHEN AREA

- - - -

Q12

16A 16A

366,6 366,6 366,6

2.596 3.097

Q15

CLIENT:

PROJECT LOCATION:

Revision Date

DRAWING TITLE:

NOTES:

SCALE :

DATE :

SHEET NO. : DRAWING NO.:

CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL

1 : 25 20.09.2019

SINGLE LINE DIAGRAM ELECTRICAL INSTALLATION

08

AGUNG SETIAWAN 08

SINGLE LINE DIAGRAM

DOAN

MALL ARTHA GADING

(9)

68° 01

68° 03

68° 02

92° 04

BSP SEAMLESS Ø 1"

BSP SEAMLESS Ø 1"

BSP SEAMLESS Ø 1"

CLIENT:

PROJECT LOCATION:

Revision Date

DRAWING TITLE:

NOTES:

SCALE :

DATE :

SHEET NO. : DRAWING NO.:

CHECKED BY : DRAWN BY : APPROVE BY : CLIENT'S APPROVAL

1 : 25 20.09.2019

SPRINGKLER INSTALLATION

09

AGUNG SETIAWAN 09

SPRINGKLER INSTALLATION

SKALA : 1 : 25 (A3)

DOAN

MALL ARTHA GADING

Referensi

Dokumen terkait