Module Description
Module name Course Module Module level, if
applicable
Bachelor of Electrical Engineering
Code, if applicable 5115-044-2 Subtitle, if
applicable
-
Course, if applicable
Electrical Power Generation (Pembangkit Energi Listrik)
Semester(s) in which the module is taught
4th (even semester)
Person responsible for the module
Lecturer of Course
Lecturer Parjiman., M.T.
Language Indonesian
Relation to Curriculum
This course is a compulsory course and offered in the 4th (even semester).
Type of teaching, contact hours
Teaching methods used in this course are:
- Lecture (i.e., group investigation, small group discussion, case study, and video based learning)
-Structured assignments (i.e., essays and case study)
The class size for lecture is 30 students.
Contact hours for lecture is 27 hours, assignments (structured tasks) is 32 hours and study individually 32 hours
Workload For this course, students are required to meet a minimum of 87 hours in one semester, which consist of:
-23 hours for lecture,
-32 hours for structured assignments, -32 hours for private study,
Credit points 2 credit points (equivalent with 3 ECTS) Requirements
according to the examination regulations
Students must have attended all classes and submitted all class assignments that are scheduled before the final tests.
Recommended prerequisites
-
Module
objectives/intended learning outcomes
After completing the course and given with this case:
Course Learning Objectives (CLO):
1. Explaining the principle of energy conversion, energy sources, types of generators and the characteristics of PLTA, PLTU, PLTG, PLTGU, PLTD; NPP (50)
2. Explaining the types of turbines, equipment at power plant centers, operation and coordination between power generating centers, and generation management (50)
Content Students will learn about:
Explaining the principle of energy conversion, Understanding energy sources, Understanding the types of power plants and the characteristics of their generation PLTA, PLTU, PLTG, PLTGU, PLTD; NPP types of turbines; equipment at power plant centers, operation and coordination between power generating centers, and generation management.
Forms of Assessment
Assessment is carried out based on written examinations, assessment/evaluation of the learning process and performance with the following components: Structured tasks: 40% ; Mid Test : 30% Final Test: 30%
Study and examination requirements and forms of
examination
Study and examination requirements:
- Students must attend 15 minutes before the class starts.
- Students must switch off all electronic devices.
- Students must inform the lecturer if they will not attend the class due to sickness, etc.
- Students must submit all class assignments before the deadline.
- Students must attend the exam to get final grade.
Form of examination:
a. Test (essay).
b. Non-test (portofolio, observation, and presentation) Media employed Direct Whiteboard and Power Point Presentation.
Reading list Main References :
1. Djiteng Marsudi (2005). Pembangkit Listrik. Jakarta Suyitno (2010). Pembangkit Energi Listrik. Angkasa Pura : Jakarta 2. Peraturan Presiden Republik Indonesia Nomor 5 Tahun 2006
Tentang Kebijakan Energi Nasional Supporting References :
1. Dewi, Marizka Lustia. 2010. Analisis Kinerja Turbin Angin Poros Vertikal Dengan Modifikasi Rotor Savonius L Untuk Optimasi Kinerja Turbin, (Online),
(http://eprints.uns.ac.id/8109/1/144401308201009461.pdf, diakses 1 November 2016).
2. Isdiyarto, dkk. 2014. Model Pembangkit Listrik Tenaga Angin Dan Surya Skala Kecil Untuk Daerah Perbukitan, (Online), (journal.unnes.ac.id › Home › Vol 12, No 1 (2014), diakses pada 2 November 2016).
3. Nababan, Tumpal Batara. 2009. Perancangan Turbin Uap Penggerak Generator Listrik Dengan Daya 80 MW Pada Instalasi Pembangkit Listrik Tenaga Uap. Sumatra Utara:
Universitas Sumatra Utara
4. Putranto, Adityo dkk. 2011. Rancang Bangun Turbin Angin Vertikal Untuk Penerangan Rumah Tangga, (Online),
(http://eprints.undip.ac.id/34839/1/Rancang_Bangun_Turbin_
Angin_Vertikal_unt_RT.pdf , diakses 1 November 2016).