• Tidak ada hasil yang ditemukan

PDF √ [ ]

N/A
N/A
Protected

Academic year: 2023

Membagikan "PDF √ [ ]"

Copied!
51
0
0

Teks penuh

SPO – 4006a.6 Stran 2 Pripravljen Mutuagung Lestari za Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd. SPO – 4006a.6 Stran 3 Pripravljen Mutuagung Lestari za Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd. SPO – 4006a.6 Stran 4 Pripravljen Mutuagung Lestari za Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd.

SPO – 4006a.6 Stran 8 Pripravljen Mutuagung Lestari za Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd. SPO – 4006a.6 Stran 9 Pripravljen Mutuagung Lestari za Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd.

Figure 1. Location Map and  Operational Map of PT Forestadwikarya Lestari
Figure 1. Location Map and Operational Map of PT Forestadwikarya Lestari

Stakeholder contacted Please find appendix 1

Determining Next Assessment

SPO – 4006a.6 Stran 10 Pripravljen Mutuagung Lestari za Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd.

ASSESSMENT RESULT

Summary of Assessment Report of the RSPO Certification

According to the result of the monitoring in 2015, all the poles in Tanjung Kembiri Estate (388 poles) and Tanjung Rusa Estate (596 poles) are well maintained. According to the result of interview with PT FLD and Kembiri Village, there is no new land compensation. According to the result of document review, management information and interview with the Plantation Agency, no traditional law exists within PT FLD's area of ​​operation.

According to the result of the assessment and realization of the budget, the minus of FFB production was between 7% - 10%. According to the field visit to Tanjung Rusa and Tanjung Kembiri, there is no peat soil in these areas.

Practices maintain the quality and availability of surface and ground water

Soil management carried out by the company is through the use of organic and inorganic fertilizers with specific doses referring to the recommendation of the research team. According to the field visit to HCV area in Block M51, Section 7, Tanjung Kembiri Estate, there is a prohibition sign posted. According to the result of the interview on Tanjung Rusa Estate and Tanjung Kembiri Estate, employees are aware of the prohibition to spray nearby riparian area.

According to the water quality monitoring (surface water) in November 2014 in Kembiri tributary, Kepang River and Cerucuk River, all the parameters have complied with the quality threshold (refers to Government Regulation No. 82 of 2001). According to the result of the monitoring in the period October – December 2014, the ratio between water consumption was between m3. According to the rat count in January and February 2015, the rat infestation was still under control (below economy threshold).

The washed pesticide containers were sent to hazardous waste depot on February 27, 2015. According to the inspection in the field, sprayer, sorting operator, mill operator have been fully provided with PPE. According to the result of the medical check-up evaluation, 26 employees were recommended to have further medical check-ups with a lung specialist and stop smoking (2013).

According to the results of a further audiometric examination on 7 employees on March 15, 2014, Otolaryngologist confirmed that the employees' hearing is normal. Tanjung Kembiri Mill is encouraged to provide ready use land burning facilities refer to the compiled action plan.OFI 2015.4. According to the results of the interview, the contractor used well-trained workers to do the work.

The status of rare, threatened or endangered species and high conservation value habitats, if any, that exist in the plantation or that could be affected by plantation or mill management, shall be identified and their conservation

According to the data of renewable energy source on 2014, Tanjung Kembiri Mill calculated the efficiency analysis of the shell and fiber use. According to the test result, emission and pollution quality is below the environmental quality threshold. According to the result of the field visit to Tanjung Kembiri mill, all workers used proper PPE.

The scope of the SOP is all communication and consultation with property and mill operations stakeholders, whether internal or external. For example, the complaint at the Kembiri Mill regarding the issue of the trench within the housing complex area on February 24, 2014. According to the observation of the employee recapitulation document (mill and property), the salary received is in accordance with the Minimum Wage Standard of District for the period of 2014.

Tanjung Kembiri Estate, Tanjung Kembiri Mill and Tanjung Rusa Estate show the list of employees (entire), according to the document review, there are no minor employees. According to the interview with the employees, they are aware of the minimum age requirements. According to the result of an interview with an internal public consultation (trade union and women's committee), there is no discrimination.

Menstrual-free day (H1), for female employees for 2 days off / month (first and second day of menstruation), see the doctor's examination. Childbirth-free day (H2) for 3 months (45 days before childbirth and 45 days after childbirth) refer to the doctor's examination. According to the pay slip check, there was no deduction of wages from the affiliated employee.

Summary of Assessment Report of Supply Chain

SPO – 4006a.6 Halaman 25 Prepared Mutuagung Lestari for Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd. SPO – 4006a.6 Halaman 26 Prepared Mutuagung Lestari for Tanjung Kembiri Mill – PT Forestadwikarya Ltd according to Golden Resourcet Lestari. the interview with the certification department staff in Tanjung Kembiri Mill, the registration in the form of FFB cover letter and weighbridge ticket for the last 1 month are kept in the office and these are then placed in the archive safe (within the office area).

SPO – 4006a.6 Halaman 27 Mutuagung Lestari prepared for Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd. Tanjung Kembiri Mill recorded the FFB received, CPO produced, HP produced and product shipped. Tanjung Kembiri Mill has used the product name (Mass Balance) on the commercial document such as weighbridge ticket number A042534 dated December 12, 2014, which described the RSPO certified kernel shipping as much as 5,020 kg to PT SMART TBK, referring to the contract number: DIC.

The facility must ensure that all sales invoices issued for delivered RSPO palm oil include the following information: a) Name and address of the purchaser (b). SPO – 4006a.6 page 28 Prepared Mutuagung Lestari for Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd. d) Quantity of delivered product. e) Reference to the related transport documentation. Tanjung Kembiri Mill used the product name (mass balance) on the trade document such as the scale ticket number A042534 dated 12 December 2014 which described the shipment of RSPO certified core as much as 5,020 kg in PT SMART TBK refers to the contract number : DIC.

The facility will only make claims relating to the use or support of RSPO certified oil palm products that comply with the RSPO rules for communication and claims. Tanjung Kembiri Mill shows the information of claim implementation that complies with the Regulation of RSPO Communication and Claim on Statement 7 PT Forestalestari Dwikarya dated 1 February 2013 in terms of claim. SPO – 4006a.6 Halaman 29 Prepared Mutuagung Lestari for Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd.

Conformity Checklist of Certificate and Logo Use

Evidence of permission or approval certificate and logo from Certification Body which

Implementation of certificate and logo used by Client comply with size and type (shape)

Implementation of Certificate and Logo is not used on product X or√

  • Summary of RSPO Partial Certification
  • There is compliance with all applicable local, national and ratified international laws and
  • The right to use the land can be demonstrated, and is not legitimately contested by local
  • There is a mutually agreed and documented system for dealing with complaints and
  • Any negotiations concerning compensation for loss of legal or customary rights are dealt with through a documented system that enables indigenous peoples, local communities
  • New plantings since November 2005, have not replaced primary forest or any area
  • No new plantings are established on local peoples’ land without their free, prior and informed consent, dealt with through a documented system that enables indigenous
  • Local people are compensated for any agreed land acquisitions and relinquishment of
  • Identification of Findings, Corrective Action, Observations, Opportunity for Improvement and Noteworthy Positive Components
    • Identification of Findings, Corrective Actions and Observations at Stage-02 Assessment CAR
    • Responses to the Request for Information

SPO – 4006a.6 Stran 30 Pripravljen Mutuagung Lestari za Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd. SPO – 4006a.6 Stran 31 Pripravljen Mutuagung Lestari za Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd.

Closed 23 July 2013

  • Conflict resolution mechanism accepted by the parties
  • OHS Program Policy Implementation
  • Implementation of the Environmental Management and
  • Infectious hazardous waste reporting

The company prepares memorandum of letter on communication and stakeholder consultation with letter number 006/RC-BB/MEMO/VII/2013 addressed to the head of Tanjung Pandan representative office, All Manager, KTU PT FLD, RC Staff, SPO Officer, and D & L TPNO. The company has shown evidence of providing responses to requests for information from the Agriculture and Forestry Agency in Belitung District to requests for information from PT. There is an area in HGU that cannot be taken care of by the company because it is claimed as public land that cannot be compensated.

For these lands, the company has not shown evidence of completion as defined in the mechanism accepted by both parties. The company identifies the spraying workers who have not received the special medical examination, budgeting the cost of the examination and preparing the test plan carried out in stages. The company ensures that all spraying workers have a special health examination, evaluating the results of the examination, and workers with health problems carry out further examinations.

The company has shown commitment of health screening to all spraying workers by: identifying the number of The company has provided PPE for workers, but the workers' awareness of the importance of using PPE is still lacking. The Company identifies and evaluates compliance with the use of PPE for all workers and makes the program as an effort to improve compliance with PPE use.

The company showed improvement measures by identifying the possible causes of the problem (assessing the compliance of the use of PPE for work) and preparing the action plan for increasing the compliance with the use of PPE. The company ensures the implementation of environmental management and monitoring in accordance with the draft preparation of the EIA document through the Environmental Management Plan and the Environmental Monitoring Plan that contains all the significant impacts that are mandated to be managed and monitored in the document EIA The company shows evidence of environmental monitoring in accordance with the EIA documents through the measurement of aquatic biota in Sungai Kembiri, Sungai Cerucuk and Sungai Kepang Membalong conducted by BLH Environmental Laboratory of South Sumatra Province on 30 July 2013.

Closed 19 July 2013

  • Identification of Findings, Corrective Actions and Observations at Surveillance-01 Assessment NCR No Ref
  • Opportunity for Improvement at Surveillance-01 Assessment
  • Minor 4.6.1 Company is encouraged to realize paraquat usage refer to the owned action plan (Observation)
  • Minor 7.5 Tanjung Kembiri Mill is encouraged to provide ready-use fire extinguishing facilities refer to the composed action plan (Observation)
  • Minor 6.10.1 Company is encouraged to communicate with the smallholders over the contract agreement and to ensure that the contract is considered fair, legal, and transparent
    • Summary of Arising Issues from Public, Management and Auditor Response
    • CERTIFIED ORGANISATION'S ACKNOWLEDGEMENT OF INTERNAL RESPONSIBILITY

The reporting of the environmental management and monitoring plan is routinely reported to the affiliated agency, together with the transfer certificate. PT FLD has received the letter and replied to the letter with the letter from TKME Manager number 02/FLD/EM-TKME/XI/2014 and it has been included in the communication book. Machines in the factory are legalized and regularly inspected, see the applicable regulations.

Company must ensure that the FFB transport vehicle only use to prevent FFB from falling on the ground. PT FLD has not yet reported the new workers working for the company to the town party. Company always gives help in the form of low price oil to the community every year.

SPO – 4006a.6 Halaman 43 Prepared Mutuagung Lestari for Tanjung Kembiri Mill – PT Forestadwikarya Lestari, Golden Agri Resource Ltd. According to the cooperation agreement letter, the handover of the scheme's small farmers must take place on 1 January 2015. In the meantime, the scheme's small farmers have not yet been approved by the Directorate General of Plantation, please refer to the technical assessment.

If it passes the technical assessment, it will be granted by referring to the Cooperation Agreement letter. PPE is provided by the company, see the risk analysis, the company should prioritize SAFETY FIRST. Safety briefing (OHS) is always informed to the contractor during the tender and at the work site.

List of Stakeholder Contacted in the RSPO Certification Process

SPO – 4006a.6 Halaman 47 Mutuagung Lestari dipersiapkan untuk Pabrik Tanjung Kembiri – PT Forestadwikarya Lestari, Golden Agri Resource Ltd. SPO – 4006a.6 Halaman 48 Mutuagung Lestari dipersiapkan untuk Pabrik Tanjung Kembiri – PT Forestadwikarya Lestari, Golden Agri Resource Ltd.

Assessment Program

SPO – 4006a.6 Page 49 Mempersiapkan Mutuagung Lestari untuk Pabrik Tanjung Kembiri – PT Forestadwikarya Lestari, Golden Agri Resource Ltd.

Glossary

Referensi

Dokumen terkait