CV. ARSA DELAPAN
KONTRAKTOR PELAKSANA :
PEMERINTAH KABUPATEN TANAH BUMBU DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG BINA MARGA
PEMBANGUNAN PEDESTRIAN JL. BATULICIN - SIMPANG EMPAT - SARI GADUNG (MULTI YEARS)
NOMOR KONTRAK :
T/027.2/036/KONT/DPUPR-BM.1/XII/2022, TANGGAL 26 DESEMBER 2022 KONSULTAN SUPERVISI :
LOKASI :
KEC. BATULICIN DAN KEC. SIMPANG EMPAT, KABUPATEN TANAH BUMBU APBD TAHUN ANGGARAN 2022, 2023 DAN 2024
SUMBER DANA :
MUTUAL CHECK 0%
( MC 0 )
PAKET PEKERJAAN :
Masa Pemeliharaan : 365 (Tiga Ratus Enam Puluh Lima) Hari Kalender Konsultan Supervisi : CV. ARSA DELAPAN
Kontrak Mutual Check
No. Divisi Uraian Pekerjaan Awal Tambah Kurang MC 0%
(Rp.) (Rp.) (Rp.) (Rp.)
1 Umum 113,810,000.00 - - 113,810,000.00
2 Sistem Manajemen Keselamatan Konstruksi (SMKK) 31,849,031.00 - - 31,849,031.00 3 Drainase 5,145,384,719.27 - 606,406.93 5,144,778,312.34 4 Pekerjaan Tanah Dan Geosintetik 2,186,799.60 - - 2,186,799.60 5 Pekerjaan Preventif - - - - 6 Pekerasan Berbutir Dan Perkerasan Beton Semen - - - - 7 Perkerasan Aspal - - - - 8 Struktur 8,497,062,970.85 606,409.18 - 8,497,669,380.03 9 Rehabilitasi Jembatan - - - - 10 Pekerjaan Harian Dan Pekerjaan Lain-Lain 11,185,242,515.32 - - 11,185,242,515.32 11 Pekerjaan Pemeliharaan Kinerja - - - - (A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 24,975,536,036.04 606,409.18 606,406.93 24,975,536,038.29
(B) Pajak Pertambahan Nilai ( PPN ) = 11% x (A) 2,747,308,963.96 2,747,308,964.21
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 27,722,845,000.00 27,722,845,000.00
Terbilang :
Diketahui oleh, Diperiksa dan disetujui oleh, Dibuat Oleh,
Dinas Pekerjaan Umum dan Penataan Ruang Konsultan Supervisi Kontraktor Pelaksana
Kabupaten Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA
Bidang Bina Marga
Nilai Pekerjaan
dua puluh tujuh milyar tujuh ratus dua puluh dua juta delapan ratus empat puluh lima ribu rupiah
Paket Pekerjaan : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years) Lokasi : Kec. Batulicin dan Kec. Simpang Empat, Kabupaten Tanah Bumbu
Kontraktor Pelaksana : PT. BINA SARANA BERSAMA
Surat Perjanjian Kontrak : T/027.2/036/KONT/DPUPR-BM.1/XII/2022, Tanggal 26 Desember 2022 Nilai Kontrak : Rp. 27,722,845,000.00
Konsultan Supervisi : CV. ARSA DELAPAN
No. Mata Harga Harga Satuan Jumlah Jumlah Jumlah Jumlah
Pembayaran Kuantitas Satuan Timpang Harga Kuantitas Harga Kuantitas Harga Kuantitas Harga
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
a b c d e f g = (d x e) h i j k l m o
DIVISI 1. UMUM
1.2 Mobilisasi
1.2 Mobilisasi LS 1.00 35,680,000.00 35,680,000.00 - - - - 1.00 35,680,000.00 Tetap
1.8 Manajemen dan Keselamatan Lalu Lintas
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 34,880,000.00 34,880,000.00 - - - - 1.00 34,880,000.00 Tetap
1.8.(2) Jembatan Sementara LS 1.00 43,250,000.00 43,250,000.00 - - - - 1.00 43,250,000.00 Tetap
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 113,810,000.00 - - 113,810,000.00
DIVISI 2. SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)
2.3.(2) APD, antara lain :
Topi pelindung (Safety Helmet) Bh 150.00 75,000.00 11,250,000.00 - - - - 150.00 11,250,000.00 Tetap
Pelindung mata (Googles, Spectacles) Bh 40.00 25,000.00 1,000,000.00 - - - - 40.00 1,000,000.00 Tetap Pelindung pernafasan dan mulut (masker, masker respirator) Bh 305.00 10,000.00 3,050,000.00 - - - - 305.00 3,050,000.00 Tetap
Sarung tangan (Safety Gloves) Psg 100.00 15,000.00 1,500,000.00 - - - - 100.00 1,500,000.00 Tetap
Sepatu keselamatan (Safety Shoes, rubber safety shoes and toe cap) Psg 30.00 324,967.70 9,749,031.00 - - - - 30.00 9,749,031.00 Tetap Rompi keselamatan (Safety Vest) Bh 100.00 50,000.00 5,000,000.00 - - - - 100.00 5,000,000.00 Tetap
Rambu petunjuk Bh 4.00 75,000.00 300,000.00 - - - - 4.00 300,000.00 Tetap
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 31,849,031.00 - - 31,849,031.00
DIVISI 3. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 5,610.52 69,849.67 391,892,991.27 - - 8.68 606,406.93 5,601.84 391,286,584.34 Kurang
2.3.(24) Saluran berbentuk U Tipe DS 2 M1 85.00 1,561,312.00 132,711,520.00 - - - - 85.00 132,711,520.00 Tetap
2.3.(28) Saluran berbentuk U Tipe DS 4 M1 215.00 1,708,289.00 367,282,135.00 - - - - 215.00 367,282,135.00 Tetap
2.3.(30) Saluran berbentuk U Tipe DS 5 M1 2,397.00 1,774,509.00 4,253,498,073.00 - - - - 2,397.00 4,253,498,073.00 Tetap
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 5,145,384,719.27 - 606,406.93 5,144,778,312.34
DIVISI 4. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa M3 90.20 24,243.90 2,186,799.60 - - - - 90.20 2,186,799.60 Tetap
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 2,186,799.60 - - 2,186,799.60
Pekerjaan Kurang Mutual Check 0%
Keterangan
PERHITUNGAN VOLUME DAN HARGA MUTUAL CHECK 0% (MC 0)
Uraian Pekerjaan Satuan
Kontrak Awal Pekerjaan Tambah
5
DIVISI 5. PEKERJAAN PREVENTIF
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - - - -
DIVISI 6. PERKERASAN BERBUTIR
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - - - -
DIVISI 7. PERKERASAN ASPAL
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - - - -
DIVISI 8. STRUKTUR
7.1 (7a) Beton strukur, fc’20 MPa M3 2,144.18 2,091,066.14 4,483,622,206.03 0.29 606,409.18 - - 2,144.47 4,484,228,615.22 Tambah
7.1 (8) Beton , fc’15 Mpa M3 126.22 1,879,718.23 237,258,035.45 - - - - 126.22 237,258,035.45 Tetap
7.1 (10) Beton, fc’10 Mpa M3 436.05 1,580,942.66 689,370,048.47 - - - - 436.05 689,370,048.47 Tetap
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 118,109.60 22,403.86 2,646,110,943.06 - - - - 118,109.60 2,646,110,943.06 Tetap
7.15.(2) Pembongkaran Beton M3 380.09 637,084.20 242,149,332.50 - - - - 380.09 242,149,332.50 Tetap
7.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) M1 2,917.60 68,053.33 198,552,405.33 - - - - 2,917.60 198,552,405.33 Tetap
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 8,497,062,970.85 606,409.18 - 8,497,669,380.03
DIVISI 9. REHABILITASI JEMBATAN
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - - - -
Paket Pekerjaan : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years) Lokasi : Kec. Batulicin dan Kec. Simpang Empat, Kabupaten Tanah Bumbu
Kontraktor Pelaksana : PT. BINA SARANA BERSAMA
Surat Perjanjian Kontrak : T/027.2/036/KONT/DPUPR-BM.1/XII/2022, Tanggal 26 Desember 2022 Nilai Kontrak : Rp. 27,722,845,000.00
Konsultan Supervisi : CV. ARSA DELAPAN
No. Mata Harga Harga Satuan Jumlah Jumlah Jumlah Jumlah
Pembayaran Kuantitas Satuan Timpang Harga Kuantitas Harga Kuantitas Harga Kuantitas Harga
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
a b c d e f g = (d x e) h i j k l m o
Pekerjaan Kurang Mutual Check 0%
Keterangan
PERHITUNGAN VOLUME DAN HARGA MUTUAL CHECK 0% (MC 0)
Uraian Pekerjaan Satuan
Kontrak Awal Pekerjaan Tambah
DIVISI 10. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.2(10a) Kereb Pracetak Jenis 1 (Peninggi/Mountable) M1 3,194.00 231,833.48 740,476,131.49 - - - - 3,194.00 740,476,131.49 Tetap 9.2.(10c) Kereb Pracetak Jenis 3 (Kereb Berparit/Gutter) M1 2,816.00 158,063.82 445,107,718.95 - - - - 2,816.00 445,107,718.95 Tetap 9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 49.00 152,921.05 7,493,131.34 - - - - 49.00 7,493,131.34 Tetap 9.2.(10h) Kereb Pracetak Jenis 8 (Kereb pada Pelandaian Trotoar) Buah 49.00 137,248.52 6,725,177.30 - - - - 49.00 6,725,177.30 Tetap 9.2.(10i) Kereb Pracetak Jenis 9 (Kereb pada Pelandaian Trotoar) Buah 49.00 126,566.56 6,201,761.47 - - - - 49.00 6,201,761.47 Tetap 9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 Ukuran 60x60) M2 4,653.60 484,275.60 2,253,624,914.91 - - - - 4,653.60 2,253,624,914.91 Tetap 9.2.(12a)(2) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 Ukuran 30x30) M2 5,301.10 525,823.88 2,787,444,990.03 - - - - 5,301.10 2,787,444,990.03 Tetap 9.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) M2 1,906.70 758,088.88 1,445,448,074.61 - - - - 1,906.70 1,445,448,074.61 Tetap 9.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED Buah 48.00 11,986,921.55 575,372,234.22 - - - - 48.00 575,372,234.22 Tetap
9.2.(23) Semak / Perdu Taman M2 197.80 40,645.00 8,039,581.00 - - - - 197.80 8,039,581.00 Tetap
9.2.(24) Pohon Jenis Tabebuya Buah 120.00 160,490.00 19,258,800.00 - - - - 120.00 19,258,800.00 Tetap
9.3.(1) Kursi Taman Buah 98.00 3,500,000.00 343,000,000.00 - - - - 98.00 343,000,000.00 Tetap
9.3.(2) Grill Pohon Buah 22.00 2,750,000.00 60,500,000.00 - - - - 22.00 60,500,000.00 Tetap
9.3.(3) Grill Tangkapan Air Buah 1,202.00 900,000.00 1,081,800,000.00 - - - - 1,202.00 1,081,800,000.00 Tetap
9.3.(4) Manhole penutup saluran Buah 589.00 1,350,000.00 795,150,000.00 - - - - 589.00 795,150,000.00 Tetap
9.3.(5) Stand Bollard (Bulat) Buah 158.00 1,200,000.00 189,600,000.00 - - - - 158.00 189,600,000.00 Tetap
9.3.(6) Stand Bollard (Bentuk L) Buah 280.00 1,500,000.00 420,000,000.00 - - - - 280.00 420,000,000.00 Tetap
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 11,185,242,515.32 - - 11,185,242,515.32
DIVISI 11. PEKERJAAN PEMELIHARAAN KINERJA
Jumlah Harga Pekerjaan DIVISI 11 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - - - -
7
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 M36 M37 M38 M39 M40 M41 M42 M43 M44 M45 M46 M47 M48 M49 M50 M51 M52 M53 M54 M55 M56 M57 M58 M59 M60 M61 M62 M63 M64 M65 26-Des 02-Jan 09-Jan 16-Jan 23-Jan 30-Jan 06-Feb 13-Feb 20-Feb 27-Feb 06-Mar 13-Mar 20-Mar 27-Mar 03-Apr 10-Apr 17-Apr 24-Apr 01-Mei 08-Mei 15-Mei 22-Mei 29-Mei 05-Jun 12-Jun 19-Jun 26-Jun 03-Jul 10-Jul 17-Jul 24-Jul 31-Jul 07-Agu 14-Agu 21-Agu 28-Agu 04-Sep 11-Sep 18-Sep 25-Sep 02-Okt 09-Okt 16-Okt 23-Okt 30-Okt 06-Nov 13-Nov 20-Nov 27-Nov 04-Des 11-Des 18-Des 25-Des 01-Jan 08-Jan 15-Jan 22-Jan 29-Jan 05-Feb 12-Feb 19-Feb 26-Feb 04-Mar 11-Mar 19-Mar DIVISI 1. UMUM
1.2 Mobilisasi 1.00 ls 0.14 0.048 0.048 0.048
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 ls 0.14 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 1.8.(2) Jembatan Sementara 1.00 ls 0.17 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
1.19 Keselamatan dan Kesehatan Kerja 1.00 ls 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 DIVISI 2. SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)
APD 1.00 ls 0.13 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 DIVISI 3. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5601.84 M3 1.57 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
2.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 0.53 0.27 0.27
2.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 1.47 0.29 0.29 0.29 0.29 0.29
2.3.(30) Saluran berbentuk U Tipe DS 5 2397.00 M1 17.03 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37
DIVISI 4. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa 90.20 m3 0.01 0.00 0.00 0.00
DIVISI 8. STRUKTUR
7.1 (7a) Beton strukur, fc’20 MPa 2144.47 M3 17.95 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 7.1 (8) Beton , fc’15 Mpa 126.22 M3 0.95 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 7.1 (10) Beton, fc’10 Mpa 436.05 M3 2.76 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 7.3 (1) Baja Tulangan Polos-BjTP 280 118109.60 Kg 10.59 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 7.15.(2) Pembongkaran Beton 380.09 M3 0.97 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 7.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2917.60 M1 0.79 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
DIVISI 10. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) 3194.00 M1 2.96 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
9.2.(10c) Kereb Pracetak Jenis 3 (Kereb Berparit/Gutter) 2816.00 M1 1.78 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) 49.00 Buah 0.03 0.015 0.015
9.2.(10h) Kereb Pracetak Jenis 8 (Kereb pada Pelandaian Trotoar) 49.00 Buah 0.03 0.013 0.013
9.2.(10i) Kereb Pracetak Jenis 9 (Kereb pada Pelandaian Trotoar) 49.00 Buah 0.02 0.012 0.012
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 Ukuran 60x60) 4653.60 M2 9.02 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
9.2.(12a)(2) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 Ukuran 30x30) 5301.10 M2 11.16 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37
9.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) 1906.70 M2 5.79 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19
9.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 2.30 0.58 0.58 0.58 0.58
9.2.(23) Semak / Perdu Taman 197.80 M2 0.03 0.008 0.008 0.008 0.008
9.2.(24) Pohon Jenis Tabebuya 120.00 Buah 0.08 0.019 0.019 0.019 0.019
9.3.(1) Kursi Taman 98.00 Buah 1.37 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11
9.3.(2) Grill Pohon 22.00 Buah 0.24 0.05 0.05 0.05 0.05 0.05
9.3.(3) Grill Tangkapan Air 1202.00 Buah 4.33 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54
9.3.(4) Manhole penutup saluran 589.00 Buah 3.18 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
9.3.(5) Stand Bollard (Bulat) 158.00 Buah 0.76 0.19 0.19 0.19 0.19
9.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 1.68 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21
100.0
PROSENTASE RENCANA KEMAJUAN PEKERJAAN 0.05 0.00 0.00 0.00 0.10 0.05 0.05 0.12 0.61 0.95 0.98 0.98 0.98 0.98 0.98 1.06 1.13 1.13 1.13 1.13 1.17 1.17 1.17 1.17 1.17 1.17 1.17 1.17 1.17 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.15 2.15 2.15 2.15 3.09 3.30 3.30 3.35 4.14 4.14 4.18 4.18 2.25 2.04 2.04 1.06 0.72 0.00 0.00 0.05 0.00 PROSENTASE KUMULATIF RENCANA KEMAJUAN PEKERJAAN 0 0.05 0.05 0.05 0.05 0.15 0.21 0.26 0.38 0.99 1.95 2.93 3.91 4.89 5.87 6.86 7.92 9.04 10.17 11.29 12.42 13.59 14.76 15.93 17.10 18.28 19.45 20.62 21.79 22.96 25.00 27.04 29.07 31.11 33.15 35.19 37.23 39.27 41.31 43.34 45.38 47.42 49.45 51.49 53.53 55.68 57.83 59.98 62.13 65.23 68.53 71.83 75.18 79.32 83.46 87.65 91.83 94.08 96.12 98.15 99.22 99.94 99.94 99.95 100.0 100.0
Banjarmasin, 26 Desember 2022
Diketahui oleh, Diperiksa dan disetujui oleh, Dibuat Oleh,
Dinas Pekerjaan Umum dan Penataan Ruang Konsultan Supervisi Kontraktor Pelaksana
Kabupaten Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA
Bidang Bina Marga
xxx xxx Ir. H. AHMAD RUBANI
P R O S E S
P H O
NO. URAIAN PEKERJAAN VOL. SAT.
BOBO KET.