LEMBAR PENGESAHAN
GAMBAR RENCANA
PEKERJAAN :
PEMBANGUNAN PENGAMAN TEBING SUNGAI KAMPAR DESA PADANG MUTUNG KEC. KAMPAR KAB. KAMPAR
TAHUN ANGGARAN 2024 DISAHKAN OLEH :
KEPALA SNVT PJSA SUMATERA III PROVINSI RIAU
SNVT PJSA SUMATERA III PROVINSI RIAU
PPK SUNGAI DAN PANTAI II
AWALUDDIN ZAKARIA, ST NIP. 19680813 200212 1004
ANDI YUSANDI, S.T., MT
NIP. 19750929 200701 1002
L E G E N D A
PEKERJAAN
KONSULTAN PERENCANAAN :
NOMOR KONTRAK
JUDUL GAMBAR LOKASI
DED PENGAMAN TEBING SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR
DIAJUKAN OLEH :
SYARIF HARTONO, S.T.
DIREKTUR
SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR PROVINSI RIAU
(DESA PADANG MUTUNG DAN PENYASAWAN)
DIPERIKSA OLEH : DIREKSI PEKERJAAN
HOTMAULI TAMPUBOLON, S.T.
NIP.197312302008122001
DISETUJUI OLEH : PEJABAT PEMBUAT KOMITMEN (PPK)
PERENCANAAN DAN PROGRAM
DANANG SUKMANA, ST, M.Eng NIP. 19880606 201012 1 002
NOMOR LEMBAR DIGAMBAR OLEH :
ARIEF YUNANTO JURU GAMBAR DIRENCANAKAN OLEH :
MEDY AGUSDIANTO, S.T.
TIM LEADER
SKALA GAMBAR
KU.02.08/03/PPK/Perenc/SATKER-BWS3/2021
1. Mutu Beton K-250 (fc = 20.75 MPa)
2. Mutu Baja Tulangan >=D10 BJTS fy=420 MPa 3. Mutu Baja Tulangan <D10 BJTP fy=240 MPa 4. Mutu Baja Pipa dan Sheet Pile Baja A36
fy=240 MPa
5. Alat Pancang Vibro Hammer
Z:\PROYEK BAPAK\TAHUN 2021\01_PROYEK BWS TURAP KAMPAR\GAMBAR KERJA\ACC A3 - 25-10-2021\TRIDECONST.png
18 1:100
TYPICAL TURAP SUNGAI KAMPAR TYPE-2 (POTONGAN TENGAH TRAVE)
L E G E N D A
PEKERJAAN
KONSULTAN PERENCANAAN :
NOMOR KONTRAK
JUDUL GAMBAR LOKASI
DED PENGAMAN TEBING SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR
DIAJUKAN OLEH :
SYARIF HARTONO, S.T.
DIREKTUR
SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR PROVINSI RIAU
(DESA PADANG MUTUNG DAN PENYASAWAN)
DIPERIKSA OLEH : DIREKSI PEKERJAAN
HOTMAULI TAMPUBOLON, S.T.
NIP.197312302008122001
DISETUJUI OLEH : PEJABAT PEMBUAT KOMITMEN (PPK)
PERENCANAAN DAN PROGRAM
DANANG SUKMANA, ST, M.Eng NIP. 19880606 201012 1 002
NOMOR LEMBAR DIGAMBAR OLEH :
ARIEF YUNANTO JURU GAMBAR DIRENCANAKAN OLEH :
MEDY AGUSDIANTO, S.T.
TIM LEADER
SKALA GAMBAR
KU.02.08/03/PPK/Perenc/SATKER-BWS3/2021
1. Mutu Beton K-250 (fc = 20.75 MPa)
2. Mutu Baja Tulangan >=D10 BJTS fy=420 MPa 3. Mutu Baja Tulangan <D10 BJTP fy=240 MPa 4. Mutu Baja Pipa dan Sheet Pile Baja A36
fy=240 MPa
5. Alat Pancang Vibro Hammer
Z:\PROYEK BAPAK\TAHUN 2021\01_PROYEK BWS TURAP KAMPAR\GAMBAR KERJA\ACC A3 - 25-10-2021\TRIDECONST.png
19 1:100
TYPICAL TURAP SUNGAI KAMPAR TYPE-2 (POTONGAN AS TRAVE)
L E G E N D A
PEKERJAAN
KONSULTAN PERENCANAAN :
NOMOR KONTRAK
JUDUL GAMBAR LOKASI
DED PENGAMAN TEBING SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR
DIAJUKAN OLEH :
SYARIF HARTONO, S.T.
DIREKTUR
SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR PROVINSI RIAU
(DESA PADANG MUTUNG DAN PENYASAWAN)
DIPERIKSA OLEH : DIREKSI PEKERJAAN
HOTMAULI TAMPUBOLON, S.T.
NIP.197312302008122001
DISETUJUI OLEH : PEJABAT PEMBUAT KOMITMEN (PPK)
PERENCANAAN DAN PROGRAM
DANANG SUKMANA, ST, M.Eng NIP. 19880606 201012 1 002
NOMOR LEMBAR DIGAMBAR OLEH :
ARIEF YUNANTO JURU GAMBAR DIRENCANAKAN OLEH :
MEDY AGUSDIANTO, S.T.
TIM LEADER
SKALA GAMBAR
KU.02.08/03/PPK/Perenc/SATKER-BWS3/2021
Z:\PROYEK BAPAK\TAHUN 2021\01_PROYEK BWS TURAP KAMPAR\GAMBAR KERJA\ACC A3 - 25-10-2021\TRIDECONST.png
20 1:100
TYPICAL TURAP SUNGAI KAMPAR TYPE-2 (POTONGAN TANGGA)
525
130 130
250
70
130 270
Balok 35x50 Balok 35x50 Balok 35x50 Balok 35x50 Balok 35x50
480
130
Scale 1:100 Scale 1:100
70 430 50
82
Sloof S1 30x50 Balok B2 35x50
Col 35x50
Balok B1 30x50
Capping t=60cm Pelat Beton t=15cm
130 270 130 270 130
270
50 480
50 480
Steel Sheet Pile, L=12m Type U (GU16-400)
Capping Beam 115x60 Balok B2 35x50
Sloof S2 30x50 Sloof S2 30x50 Sloof S2 30x50 Sloof S2 30x50
Sloof S1 30x50
Balok B1 30x50
Balok B2 35x50
Balok B1 30x50
Balok B2 35x50
Balok B1 30x50
Balok B2 35x50
Balok B1 30x50
Balok B2 35x50
Balok B1 30x50
Balok B2 35x50
Sloof S1 30x50 Sloof S1 30x50 Sloof S1 30x50 Sloof S1 30x50
Sta 0+000 s/d 0+675 Sta 5+775 s/d 7+500
400 400 400 400
70 70
115
200 200 200 200 200 200 200 200
18 30
Capping t=60cm Sloof S2 30x50
L E G E N D A
PEKERJAAN
KONSULTAN PERENCANAAN :
NOMOR KONTRAK
JUDUL GAMBAR LOKASI
DED PENGAMAN TEBING SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR
DIAJUKAN OLEH :
SYARIF HARTONO, S.T.
DIREKTUR
SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR PROVINSI RIAU
(DESA PADANG MUTUNG DAN PENYASAWAN)
DIPERIKSA OLEH : DIREKSI PEKERJAAN
HOTMAULI TAMPUBOLON, S.T.
NIP.197312302008122001
DISETUJUI OLEH : PEJABAT PEMBUAT KOMITMEN (PPK)
PERENCANAAN DAN PROGRAM
DANANG SUKMANA, ST, M.Eng NIP. 19880606 201012 1 002
NOMOR LEMBAR DIGAMBAR OLEH :
ARIEF YUNANTO JURU GAMBAR DIRENCANAKAN OLEH :
MEDY AGUSDIANTO, S.T.
TIM LEADER
SKALA GAMBAR
KU.02.08/03/PPK/Perenc/SATKER-BWS3/2021
1. Mutu Beton K-250 (fc = 20.75 MPa)
2. Mutu Baja Tulangan >=D10 BJTS fy=420 MPa 3. Mutu Baja Tulangan <D10 BJTP fy=240 MPa 4. Mutu Baja Pipa dan Sheet Pile Baja A36
fy=240 MPa
5. Alat Pancang Vibro Hammer
Z:\PROYEK BAPAK\TAHUN 2021\01_PROYEK BWS TURAP KAMPAR\GAMBAR KERJA\ACC A3 - 25-10-2021\TRIDECONST.png
23 1:100
TAMPAK SAMPING TURAP TYPE-2 SUNGAI KAMPAR
&
TAMPAK BELAKANG TURAP TYPE-2 SUNGAI KAMPAR
130 130
130 130
30 435 115
Sloof S2 30x50
Sloof S1 30x50 Sloof S1 30x50
Sloof S2 30x50
Sloof S1 30x50
Sloof S2 30x50
Sloof S1 30x50
Sloof S2 30x50
Sloof S1 30x50
130 130
130 130
30 470 65 15
Balok B1 30x50
Balok B2 30x50 Balok B2 30x50
Balok B1 30x50
Balok B2 30x50
Balok B1 30x50
Balok B2 30x50
Balok B1 30x50
Balok B2 30x50
130 130
130 130
130 130
130 130 130
130
130 130
130 130
130 130 130
130
130 130
130 130
130 130 130
130
130 130
130 130
130 130
Capping t=60cm Capping t=60cm Capping t=60cm Capping t=60cm Capping t=60cm
525
400 400 400 400
270 270 270 270
525
10
Capping t=60cm Capping t=60cm
Col 35x50 Col 35x50
Capping t=60cm Col 35x50
Capping t=60cm Col 35x50
Capping t=60cm Col 35x50
Capping t=60cm Capping t=60cm Capping t=60cm Capping t=60cm Capping t=60cm
Capping t=60cm Capping t=60cm Capping t=60cm Capping t=60cm Capping t=60cm
Sheet Pile Baja Type U (GU-400)
Sloof S2 30x50
Sloof S1 30x50
130 130
130 130
Capping t=60cm Capping t=60cm
Sloof S2 30x50
Sloof S1 30x50
130 130
130 130
Capping t=60cm Capping t=60cm
Balok B1 30x50
Balok B2 30x50
130 130
130 130
Capping t=60cm
Capping t=60cm Col 35x50
Balok B1 30x50
Balok B2 30x50
130 130
130 130
Capping t=60cm
Capping t=60cm Col 35x50
400 400
270 270
Capping Beam Capping Beam Capping Beam Capping Beam Capping Beam Capping Beam
Scale 1:100 Scale 1:100
Sta 0+000 s/d 0+675 Sta 5+775 s/d 7+500
Sta 0+000 s/d 0+675 Sta 5+775 s/d 7+500
275 100
15 Sheet Pile Baja
Type U (GU-400)
Sheet Pile Baja Type U (GU-400)
Sheet Pile Baja Type U (GU-400)
Sheet Pile Baja Type U (GU-400)
Sheet Pile Baja Type U (GU-400)
Sheet Pile Baja Type U (GU-400)
L E G E N D A
PEKERJAAN
KONSULTAN PERENCANAAN :
NOMOR KONTRAK
JUDUL GAMBAR LOKASI
DED PENGAMAN TEBING SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR
DIAJUKAN OLEH :
SYARIF HARTONO, S.T.
DIREKTUR
SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR PROVINSI RIAU
(DESA PADANG MUTUNG DAN PENYASAWAN)
DIPERIKSA OLEH : DIREKSI PEKERJAAN
HOTMAULI TAMPUBOLON, S.T.
NIP.197312302008122001
DISETUJUI OLEH : PEJABAT PEMBUAT KOMITMEN (PPK)
PERENCANAAN DAN PROGRAM
DANANG SUKMANA, ST, M.Eng NIP. 19880606 201012 1 002
NOMOR LEMBAR DIGAMBAR OLEH :
ARIEF YUNANTO JURU GAMBAR DIRENCANAKAN OLEH :
MEDY AGUSDIANTO, S.T.
TIM LEADER
SKALA GAMBAR
KU.02.08/03/PPK/Perenc/SATKER-BWS3/2021
Z:\PROYEK BAPAK\TAHUN 2021\01_PROYEK BWS TURAP KAMPAR\GAMBAR KERJA\ACC A3 - 25-10-2021\TRIDECONST.png
24 1:100
SUNGAI KAMPAR
&
TAMPAK ATAS TURAP TYPE-2 SUNGAI KAMPAR
130 130 250
70 480
70 430
50
385 275
Scale 1:40
D10-150 D10-150
D10-150 D10-150
D10-150
D10-150 D10-150
D10-150
20 10
115
L E G E N D A
PEKERJAAN
KONSULTAN PERENCANAAN :
NOMOR KONTRAK
JUDUL GAMBAR LOKASI
DED PENGAMAN TEBING SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR
DIAJUKAN OLEH :
SYARIF HARTONO, S.T.
DIREKTUR
SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR PROVINSI RIAU
(DESA PADANG MUTUNG DAN PENYASAWAN)
DIPERIKSA OLEH : DIREKSI PEKERJAAN
HOTMAULI TAMPUBOLON, S.T.
NIP.197312302008122001
DISETUJUI OLEH : PEJABAT PEMBUAT KOMITMEN (PPK)
PERENCANAAN DAN PROGRAM
DANANG SUKMANA, ST, M.Eng NIP. 19880606 201012 1 002
NOMOR LEMBAR DIGAMBAR OLEH :
ARIEF YUNANTO JURU GAMBAR DIRENCANAKAN OLEH :
MEDY AGUSDIANTO, S.T.
TIM LEADER
SKALA GAMBAR
KU.02.08/03/PPK/Perenc/SATKER-BWS3/2021
Z:\PROYEK BAPAK\TAHUN 2021\01_PROYEK BWS TURAP KAMPAR\GAMBAR KERJA\ACC A3 - 25-10-2021\TRIDECONST.png
1:40
25
TAMPAK SAMPING PENULANGAN DINDING TURAP TYPE-2 SUNGAI KAMPAR
350 200 1450 1900
350 200 1450
1900
Scale 1:50Scale 1:50
Scale 1:50
Angkur 8 D22 8 D13
50 8 D13
50
50
350 200 1450
1900
t=15mm, fy=240MPa Batas Free Standing
Tanah Di keluarkan dg Water Jetting Batas Free StandingTanah Di keluarkan dg Water Jetting Tanah Asli River Bed
Tulangan 8 D13 Beton (fc'=20.75MPa) K-250
Angkur Tulangan 8 D13 Batas Free StandingBatas Free Standing Tanah Asli River Bed
Angkur Utama 8 D 22
Angkur Isian Pancang 8 D 13
RUANG KOSONG DIISI BETON
t=15mm, fy=240MPa t=15mm, fy=240MPa
Batas Free StandingBatas Free Standing Tanah Asli River BedTanah Asli River Bed
20 20 20
Las t=10mm Las t=10mm
POT-1POT-1 POT-2POT-2 POT-3POT-3 Scale 1:50
L E G E N D A
PEKERJAAN
KONSULTAN PERENCANAAN :
NOMOR KONTRAK
JUDUL GAMBAR LOKASI
DED PENGAMAN TEBING SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR
DIAJUKAN OLEH :
SYARIF HARTONO, S.T.
DIREKTUR
SUNGAI KAMPAR KEC. KAMPAR KAB. KAMPAR PROVINSI RIAU
(DESA PADANG MUTUNG DAN PENYASAWAN)
DIPERIKSA OLEH : DIREKSI PEKERJAAN
HOTMAULI TAMPUBOLON, S.T.
NIP.197312302008122001
DISETUJUI OLEH : PEJABAT PEMBUAT KOMITMEN (PPK)
PERENCANAAN DAN PROGRAM
DANANG SUKMANA, ST, M.Eng NIP. 19880606 201012 1 002
NOMOR LEMBAR DIGAMBAR OLEH :
ARIEF YUNANTO JURU GAMBAR DIRENCANAKAN OLEH :
MEDY AGUSDIANTO, S.T.
TIM LEADER
SKALA GAMBAR
KU.02.08/03/PPK/Perenc/SATKER-BWS3/2021
Z:\PROYEK BAPAK\TAHUN 2021\01_PROYEK BWS TURAP KAMPAR\GAMBAR KERJA\ACC A3 - 25-10-2021\TRIDECONST.png
70 70
1:50
34
TIANG PANCANG PIPA BAJA