PROJECTION MONTHLY PLAN
JUNI 2023 (1 – 30 JUNI 2023)
Approval Page
Appro val Page
Agreed both parties on : ________________
CV. Multindo Prima Teknik
Feni Perdana
Sec Head Engineering CV.MPT
M. Yusuf
Project Manager CV.MPT
PT. Trisensa Mineral Utama
Dadang Hermanto
Supt. Long term Engineering PT. TMU
Agustin Sihol Mine manager PT. TMU Nurdian Elnandi
Supt. Short term Engineering PT. TMU Agung Wicaksono
Mine Plan Eng CV. MPT
Hamdani
Sec Head Produksi CV.MPT Guntur Simanjuntak
Supt. Produksi PT. TMU
SPO (STANDAR PARAMETER OPERATION)
RL+150 RL+147
Jun-23
WK22 WK23 WK24 WK25 WK26
Start 01-Jun-23 05-Jun-23 12-Jun-23 19-Jun-23 26-Jun-23
Finish 04-Jun-23 11-Jun-23 18-Jun-23 25-Jun-23 30-Jun-23
Days 30 4 7 7 7 5 30.00
Calendar Hours 720 24 96 168 168 168 120 720
Maintenance Hours PM & UM 15% 9.6 16.8 16.8 16.8 12 72
Available Hours 86 151 151 151 108 648
Machine Availability (%)
Libur dalam hari - - - - - - Libur dalam jam - - - - - - Jumlah Hujan 4.00 7.00 7.00 7.00 5.00 30.00 Durasi hujan tiap kali hujan (hour) 2.82 11.28 19.74 19.74 19.74 14.10 84.60 Durasi slippery tiap kali hujan (hour) OB 40% 4.51 7.90 7.90 7.90 5.64 33.84 Durasi slippery tiap kali hujan (hour) COAL 60% 6.77 11.84 11.84 11.84 8.46 50.76 Total Durasi Delay Hujan & Slippery (jam) OB 15.79 27.64 27.64 27.64 19.74 118.4 Total Durasi Delay Hujan & Slippery (jam) COAL 18.05 31.58 31.58 31.58 22.56 135.4 Loss Time karena Libur & Cuaca OB 15.79 27.64 27.64 27.64 19.74 118.4 Loss Time karena Libur & Cuaca COAL 18.05 31.58 31.58 31.58 22.56 135.4
Net Available Hours OB 70.61 123.56 123.56 123.56 88.26 529.56 Net Available Hours COAL 68.35 119.62 119.62 119.62 85.44 512.64
Standby Hours Shift normal menit
Istirahat 2 1.00 60.00 7.00 14.00 14.00 14.00 10.00 59.00 Prayers 1 1.00 60.00 1.00 1.00 1.00 1.00 1.00 5.00 Fasting 3 y 18.00 1,080.00 - - - - - - Fuel & Lube 2 0.08 5.00 0.58 1.17 1.17 1.17 0.83 4.92 Safety talk ( Produksi ) 1 Y 0.17 10.00 - - - - - -
General Safety Talk 1 Y 1.00 60.00 1.50 - - - - 1.50 P5M/P2H 1 Y 0.08 5.00 1.75 3.50 3.50 3.50 2.50 14.75 Shift Change 2 Y 0.33 20.00 1.05 2.10 2.10 2.10 1.50 8.85 Other Lost time - - - - - - Total Standby Hours (OB) 11.13 18.27 18.27 18.27 13.33 79.27
Schedule Hours and Parameter
Duration
Total
Description
MA Plan
RL+150
Model Brand
Excavator
Overburden
1 EX801 DX800LC DOOSAN
2 EX802 DX800LC DOOSAN
3 EX53 CAT 345 GC CATERPILLAR
4 EX57 CAT 345 GC CATERPILLAR
5 EX58 CAT 345 GC CATERPILLAR
COAL Coal
1 EX59 PC 200 KOMATSU
2 EX007 PC 200 KOMATSU
HAULER
Hauler
SANYSKT90S
1 OHT801 SKT90S SANY
2 OHT802 SKT90S SANY
3 OHT803 SKT90S SANY
4 OHT804 SKT90S SANY
5 OHT805 SKT90S SANY
6 OHT806 SKT90S SANY
7 OHT807 SKT90S SANY
8 OHT808 SKT90S SANY
9 OHT809 SKT90S SANY
10 OHT810 SKT90S SANY
11 OHT811 SKT90S SANY
12 OHT812 SKT90S SANY
WK22 WK23 WK24 WK25 WK26 Average Remarks
89.20% 89.20% 89.20% 89.20% 89.20% 89.20%
88.00% 88.00% 88.00% 88.00% 88.00% 88.00% PS250/PM1 & PS500PM2
88.00% 88.00% 88.00% 88.00% 88.00% 88.00% PS250/PM1 & PS500PM2
92.00% 92.00% 92.00% 92.00% 92.00% 92.00% PS250/PM1 & PS500PM2
89.00% 89.00% 89.00% 89.00% 89.00% 89.00% PS250/PM1 & PS500PM2
89.00% 89.00% 89.00% 89.00% 89.00% 89.00% PS250/PM1 & PS500PM2
89.00% 89.00% 89.00% 89.00% 89.00% 89.00%
89.00% 89.00% 89.00% 89.00% 89.00% 89.00% PS250/PM1 & PS500PM2
89.00% 89.00% 89.00% 89.00% 89.00% 89.00% PS250/PM1 & PS500PM2
23
23 23 23 23 23
11 11 11 11 11 11
90.22% 90.22% 90.22% 90.22% 90.22% 90.22%
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
89.00% 89.00% 89.00% 89.00% 89.00% 89.00% PS250/PM1 & PS500PM2
92.00% 92.00% 92.00% 92.00% 92.00% 92.00% PS250/PM1 & PS500PM2
91.00% 91.00% 91.00% 91.00% 91.00% 91.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
MA Plan
HINOH500-260
1 DT050 H500-260 HINO
2 DT051 H500-260 HINO
3 DT052 H500-260 HINO
4 DT053 H500-260 HINO
5 DT150 H500-260 HINO
6 DT151 H500-260 HINO
7 DT152 H500-260 HINO
8 DT153 H500-260 HINO
9 DT154 H500-260 HINO
10 DT155 H500-260 HINO
11 DT156 H500-260 HINO
12 DT157 H500-260 HINO
13 DT158 H500-260 HINO
14 DT164 H500-261 HINO
15 DT165 H500-262 HINO
16 DT166 H500-263 HINO
Support Equipment
Excavator
1 EX056 PC 200 KOMATSU
2 EX006 PC 200 KOMATSU
Bulldozer
1 DZ01 D85SS KOMATSU
2 DZ07 D85SS KOMATSU
77.80% 77.80% 77.80% 77.80% 77.80% 77.80%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% PS5000KM/PM1 & PS10000KMPM2
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Perbaikan Bengkel Trinity smd
92.00% 92.00% 92.00% 92.00% 92.00% 92.00% PS5000KM/PM1 & PS10000KMPM2
85.00% 85.00% 85.00% 85.00% 85.00% 85.00% PS5000KM/PM1 & PS10000KMPM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS5000KM/PM1 & PS10000KMPM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS5000KM/PM1 & PS10000KMPM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS5000KM/PM1 & PS10000KMPM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS5000KM/PM1 & PS10000KMPM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS5000KM/PM1 & PS10000KMPM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS5000KM/PM1 & PS10000KMPM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS5000KM/PM1 & PS10000KMPM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS5000KM/PM1 & PS10000KMPM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS5000KM/PM1 & PS10000KMPM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS5000KM/PM1 & PS10000KMPM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS5000KM/PM1 & PS10000KMPM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS5000KM/PM1 & PS10000KMPM2
0 0 0 0 0 0
92.00% 92.00% 92.00% 92.00% 92.00% 92.00%
92.00% 92.00% 92.00% 92.00% 92.00% 92.00% PS250/PM1 & PS500PM2
92.00% 92.00% 92.00% 92.00% 92.00% 92.00% PS250/PM1 & PS500PM2
88.00% 88.00% 88.00% 88.00% 88.00% 88.00%
86.00% 86.00% 86.00% 86.00% 86.00% 86.00% PS250/PM1 & PS500PM2
87.00% 87.00% 87.00% 87.00% 87.00% 87.00% PS250/PM1 & PS500PM2
MA Plan
Motor Grader
1 GD03 GD STG SANNY
2 GD07 GD HYDROMEX
Support Truck
1 FT2002 Quester Fuel Truck
Auxilary & Dewatering Pump
1 LT61 TN9-R4000/6000
Watt
ALTRAK 1978
2 LT62 TN9-R4000/6000
Watt
ALTRAK 1978
3 LT63 TN9-R4000/6000
Watt
ALTRAK 1978
4 LT64 TN9-R4000/6000
Watt
ALTRAK 1978
5 LT65 TN9-R4000/6000
Watt
ALTRAK 1978
6 LT66 TN9-R4000/6000
Watt
ALTRAK 1978
7 MPG10 ALFOS 65A ALFOS
80.00% 80.00% 80.00% 80.00% 80.00% 80.00%
85.00% 85.00% 85.00% 85.00% 85.00% 85.00% PS250/PM1 & PS500PM2
75.00% 75.00% 75.00% 75.00% 75.00% 75.00% PS250/PM1 & PS500PM2
85.00% 85.00% 85.00% 85.00% 85.00% 85.00%
85.00% 85.00% 85.00% 85.00% 85.00% 85.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00%
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00% PS250/PM1 & PS500PM2
90.00% 90.00% 90.00% 90.00% 90.00% 90.00%
Equipment & Cap Unit
E-F G-M N-T U-AA AB-AH
WK22 WK23 WK24 WK25 WK26
1-Jun 5-Jun 12-Jun 19-Jun 26-Jun
4-Jun 11-Jun 18-Jun 25-Jun 30-Jun
Overburden Equipment
Excavator Total 5 5 5 5 5 5
DX800LC 2 2 2 2 2 2 7 CAT 345 GC 3 3 3 3 3 3
Hauler Total 26 26 26 26 26 26
SKT90S 12 12 12 12 12 12
HINO 14 14 14 14 14 14
- - - - - -
Coal Equipment
Excavator Total 2 2 2 2 2 2CAT 330 GC 1 1 1 1 1 1
PC 200 1 1 1 1 1 1
Support Equipment
Excavator Total 1 1 1 1 1 1PC200 1 1 1 1 1 1
Bulldozer Total 3 4 5 5 5 5
D85SS 2 3 3 3 3 3
D375A-6 1 1 1 1 1 1 9 Grader Total 1 1 1 1 1 1
SANNY - - - - - -
Fleet allocation
Jun-23
Total
Equipment
Equipment & Cap Unit
3 4 5 6 7
WK22 WK23 WK24 WK25 WK26
Jun-23 Jun-23 Jun-23 Jun-23 Jun-23
Overburden
Fleet 1 DX800LC EX801 23,446 33,118 33,118 33,118 18,762 141,563
Fleet 2 DX800LC EX802 23,446 33,118 33,118 33,118 18,762 141,563
Fleet 3 CAT 345 GC EX57 12,556 16,644 10,197 14,467 10,047 63,911
Fleet 4 CAT 345 GC EX53 12,127 18,640 18,640 18,640 10,566 78,614
Fleet 5 CAT 345 GC EX58 10,828 16,650 16,104 15,685 8,888 68,155
Fleet 6 - - - - - - -
Fleet 7 - - - - - - -
Fleet 8 - - - - - - -
82,403
118,172 111,177 115,028 67,025 493,805 TRUE
Fleet 1 CAT 330 GC EX59 - 5,600 8,750 9,100 7,500 30,950
Fleet 2 PC 200 EX056 - 1,400 1,400 1,400 1,250 5,450
Total
Total OB Coal Getting
Equipment
Equipment Capacity
Jun-23
Equipment & Cap Unit
Equipment Eq.Num Material Location Produksi Distance Allocation
DX800LC EX801 380 Bcm/Hour Claystone PIT 5B36 141,563 1,500 IPD 5B21 UTARA DX800LC EX802 380 Bcm/Hour Claystone PIT 5B36 141,563 1,500 IPD 5B21 UTARA CAT 345 GC EX57 200 Bcm/Hour Claystone PIT 5B36 63,911 1,500 IPD 5B21 UTARA CAT 345 GC EX53 200 Bcm/Hour Claystone PIT B2A 78,614 1,500 IPD B2A CAT 345 GC EX58 200 Bcm/Hour Claystone PIT B2A 68,155 1,500 IPD B2A
Total 1,360 Bcm/Hour 493,805 1,500.00
CAT 330 GC EX59 119 Ton/Hour 30,950 - ROM
PC 200 EX056 82 Ton/Hour 5,450 - ROM
Total 201 Ton/Hour 36,400
13.57 Ratio
Productivity Plan
June-23
Eq. Capacity OB Excavator
Coal Excavator
Plan Summary Equipment & Cap Unit
1 1 1 1 1
Hauler Ov erburden W K22 W K23 W K24 W K25 W K26 T ot al
SKT90S 12 12 12 12 12 12
HINO 14 14 14 14 14 14
T ot al 26 26 26 26 26 26
D ist anc e 5B 21
D ist anc e 5B 36 1,448.29 1,448.29 1,448.29 1,448.29 1,448.29 1,448.29 D ist anc e B 2A 999.51 999.51 999.51 999.51 999.51 999.51 D ist anc e All Pit 1,314.91 1,314.91 1,314.91 1,314.91 1,314.91 1,314.91
W K22 W K23 W K24 W K25 W K26
4-Jun 11-Jun 18-Jun 25-Jun 30-Jun
OVE R ALL PIT
MUD (BCM) -
OB Removal (BCM) 82,403 118,172 111,177 115,028 67,025 493,805 Total Waste Removal (BCM) 82,403 118,172 111,177 115,028 67,025 493,805 Coal Getting (MT) - 7,000 10,150 10,500 8,750 36,400 SR Mining - 16.88 10.95 10.96 7.66 13.57 PIT 5B 36
Waste Removal (BCM) 47,315 83,970 76,433 79,614 59,704 347,036 Coal Getting (MT) - 5,600 8,750 9,100 7,500 30,950 SR Mining - 14.99 8.74 8.75 7.96 11.21
PIT B 2A
Waste Removal (BCM) 17,858 35,291 34,884 34,325 24,411 146,769 Coal Getting (MT) - 1,400 1,400 1,400 1,250 5,450 SR Exclude Mud - 25.21 24.92 24.52 19.53 26.93 SR Include Mud - 25.21 24.92 24.52 19.53 26.93 CV GAR - 4,670 4,787 4,638 4,643 4,392
Production Plan Summary
Jun-23
`
Jun-23
Des c ript ion T ot al
Fuel Consumtion Plan
D-E F-L M-S T-Z AA-AG
WK22 WK23 WK24 WK25 WK26
Fuel Usage (liter)
Excavator 15,911 30,208 30,208 30,208 21,481 128,017 Hauler / Truck 36,601 64,928 64,928 64,928 46,171 277,555 Dozer 3,981 8,699 8,699 8,699 6,180 36,259 Grader - 475 475 475 335 1,760 Supporting 1,302 2,313 2,313 2,313 1,644 9,887 Auxiliary 1,350 2,388 2,388 2,388 1,699 10,214 Pumping 1,285 2,281 2,281 2,281 1,622 10,053 Total 60,431 111,293 111,293 111,293 79,133 473,745
Fuel Ratio
Excavator 0.24 0.25 0.25 0.24 0.24 0.24 Hauler / Truck 0.56 0.54 0.53 0.52 0.51 0.52 Dozer 0.06 0.07 0.07 0.07 0.07 0.07 Grader - 0.00 0.00 0.00 0.00 0.00 Supporting 0.02 0.02 0.02 0.02 0.02 0.02 Auxiliary 0.02 0.02 0.02 0.02 0.02 0.02 Total 0.92 0.92 0.91 0.89 0.87 0.90
Fuel Consumption Plan
MAY
Description Total
Material Balance
WK22 WK23 WK24 WK25 WK26
4-Jun 11-Jun 18-Jun 25-Jun 30-Jun
Material Clasification
Top Soil & Sub Soil - - - - - - Mud - - - - - - Ripping 17,858 35,291 34,884 34,325 24,411 146,769 Free Digging 47,315 83,970 76,433 79,614 59,704 347,036 TOTAL 65,174 119,260 111,317 113,940 84,115 493,805
Material Balance
AREA
PIT 5B21 - - - - - - PIT 5B36 47,315 83,970 76,433 79,614 59,704 347,036
PIT B2A 17,858 35,291 34,884 34,325 24,411 146,769 Total 47,315 83,970 76,433 79,614 59,704 493,805
Dumping Point
Volume to Disposal (BCM)IPD B2A Barat 17,858 35,291 34,884 34,325 24,411 146,769
IPD B521 Selatan Rl+70 79,614 59,704 139,318
IPD B521 Utara Rl+105 47,315 83,970 76,433 16,697 - 224,415
Disposal Remain Capacity (BCM) Capacity -
IPD B2A Barat 896,452 878,594 843,303 808,419 774,094 749,683 749,683 IPD B521 Selatan Rl+70 207,900 160,585 76,615 182 (79,432) (139,136) (139,136)
IPD B521 Utara Rl+105 604,476 557,161 473,191 396,758 380,061 380,061 380,061
Description Total
Material Clasification and Balance
Jun-23
Activity
Start Date Finish Date WK22 WK23 WK24 WK25 WK26 W41
General Work
Pengukukuran Original Pit B2A 1-Jun-23 3-Jun-23 1x TS MPT & TMU Open
Pembentukan Jalan Ke disposal B2A Barat 1-Jun-23 1-Jun-23 1x DZ85 ss & 1x PC 200 MPT Open
Mobilisasi unit 2 X Excavator 40 T Ke B2A 1-Jun-23 1-Jun-23 1x EX470/EX350 & 2 DT MPT Open
Stake out Sequence Juni Pit B2A & Pit B536 2023 1-Jun-23 2-Jun-23 Alat TS MPT Open
Pembetukan Tanggul HW Rl+80 Utara Selatan sisi Timur Pit B536 2-Jun-23 16-Jun-23 1x PC 200 MPT Open
Pemebentukan Jalan SW ke IPD B521 Selatan RL+70 7-Jun-23 9-Jun-23 1x PC 211, 1x Dz85 ss MPT Open
Pemebentukan Sekatan Sump Utara Pit B536 9-Jun-23 11-Jun-23 1x PC 211, 1x Dz85 ss MPT Open
Dewatering
Pumping sump Sump B636 Utara 3-Jun-23 8-Jun-23 1xALFOS 65A MPT Continue
Activity
Jun-23
Unit PIC Status
Activity Plan Time Week
MAP
30 31 30
Bulan May-23 Jun-23 Aug-23
Jumlah Hari 2 0 0
Air Sump 23,624 - -
Hujan 40 mm 80 - -
Cathment Area ha 39.2 39.2 21.7
Volume Hujan m3 2,089 - -
Volume Ground Water lt/s - - - Total Volume Air Masuk m3 25,713 - - Kemampuan Pompa
PA 85% 90% 90%
UA 86% 86% 86%
Jam Kerja Pompa/Hari jam 17 17 17 ltr/dtk - - -
MPG ltr/dtk - - -
Alfos 65A-(MPG10) 320 ltr/dtk 38,707 - - ltr/dtk - - -
Kemampuan Pompa 38,707 - -
Sisa Air m3 - - - Kapasitas Pompa
MPG 0 ltr/dtk - - -
Kapasitas Pompa /day (m3/day) 19,354 19,354 19,354
Kapasitas Pompa /Jam (m3/Jam) 1,152 1,152 1,152 Vol 23,624.00 Target RL+48 Duration Pumping (H) 33.60 Duration Pumping (D) 2.00
POMPA MPT - PIT 5B36 2021
Activity
Pompa
HDPE RL+83
Sequence Pit B536
ORTHO Legenda
Bdy Design Toe Crest Design Road
Map
Sequence Pit B2A
ORTHO Legenda
Bdy Design Toe Crest Design Road
Map
U
Sequence Pit B536
80 T
P2
80 T
P2
Forong-Gorong
P1
P2
20 T
P2
P1
40 T
40 T
S43
S42
(Extra Fleet)
S40
Voll Highwall OB : 37,397.48 Bcm CO : -
Voll SW Selatan OB : 384,973.01 Bcm CO : 37.282 MT
- Strategy Plan Fleet
P1. 1X 80 T Stripping Tanjungan to RL+55 Mengarah ke Utara untuk percepatan rencana jalan
P1. 1X 80 T Continue Pembentukan Lost Point to RL 32 Expose Seam 42 serta Peralihan Sump temporary dari air sump utara, agar top surface Mud bisa di ukur team Survey
P1. 1X 40 T Continue potong Contur ke arah Selatan untuk penurunan HW to RL 80
P2. 1X 80 T Setelah pembentukan Lost point Dapat di alokasikan di SW Selatan design Progres expose seam 42 dan 41
P2. 1X 40 T Setelah dari HW Dapat di alokasikan di SW Selatan Progres expose seam 43 dan 41
- Strategy Plan General Fleet
P1. 1X 20 Ton Support Pementukan ramp jalan untuk percepatan pembentukan ramp jalan baru
P1. 1X Dozer 375 Support Ripping material hard
80 TP1
Sequence Pit B2A & Disposal Barat IPD B2A
40 T
- Strategy Plan Fleet
P1. 1X 40 T Stripping Expose seam A1L, A1U to RL+76 Mengarah ke Utara
P1. 1X 40 Ton stripping & Expose Seam C10, CA to RL+ 70 ke arah utara
P2. 1X 40 Ton Striping Seam B, B10 ke arah Utara to RL+70
P1 P2
40 T
P1
40 T
Rl+76
Rl+70 Rl+70
Voll SW Selatan OB : 71,874Bcm CO : 4,990 MT
Voll SW Selatan OB : 85,034Bcm CO : 104 MT
Voll SW Selatan OB : 62,381Bcm CO : 3,507 MT
Disposal B2a Utara
Distance
Berdasakan Centroid jarak dari
- Pit B2a HW 1X 40 Ton RL+70 Selatan sampai dengan Disp OPD B2a Utara RL+115 Capacity Fill 855.000 Bcm jarak BY Centroid : 1.200 M (garis Biru)
Legenda
Foto Udara 29 Mei 2023
Capacity Fill 855,000 Bcm
Disposal B2a Barat
Legenda
Bdy Design Toe Crest Design Road
Foto Udara 29 Mei 2023
Capacity Fill 294,923 Bcm
Distance
Berdasakan Centroid jarak dari
- Pit B2a HW 1X 80 Ton RL+70 Selatan sampai
dengan Disp OPD B2a Barat RL+130 Capacity Fill
294.923 Bcm jarak BY Centroid : 1.500 M (garis
Biru)
Disposal B521 Selatan
Distance
Berdasakan Centroid jarak dari
- Pit B536 HW RL+80 Selatan sampai dengan Disp IPDB521 Selatan RL+70 jarak BY Centroid : 641 M (garis Biru)
Forong-Gorong Distance BY Centroid
Pit Disposal Disposal Capsity (BCM) Dist (M) Remarks B536 RL+40 Disp B521 Barat RL+105 180,068 1,427Jalan LW/ Jalan Existing
B536 RL+40 Disp B521 Barat RL+105 180,068 1,285Jalan SW/ Propose Design Disp Selatan B536 RL+60 Disp B521 Selatan RL+70 207,900 423Jalan SW/ Propose Design Disp Selatan
Distance BY Centroid
Pit Disposal Disposal Capsity (BCM) Dist (M) Remarks B536 RL+70 HW Disp B521 Barat RL+105 180,068 1,329Jalan HW timur B536 RL+70 HW Disp B521 Selatan RL+70 207,900 641Jalan HW timur
Legenda
Foto Udara 29 Mei 2023
Capacity Fill 4.815 Bcm
Capacity Fill 207.900 Bcm
Disposal B521 Barat
2
Distance
Berdasakan Centroid jarak dari
- Pit B536 SW Selatan sampai dengan
Disp IPDB521 Utara RL+105 jarak BY Centroid : 1,500 M (Garis Merah)
Foto Udara 29 Mei 2023
Patok Monitoring 1
Legenda
Bdy Design Toe Crest Design Road
Patok Monitoring 2
Patok Monitoring 3
Capacity Fill 604.476 Bcm
Reserve Pit B536
PIT SEAM COAL OB Sum of CV_G ASH Sum of TS
BOTOM 37,267.84 348,291.72 97,149.28 11.35 35.00
- 168,165.68 3.49 38.00
- 58.29 8,715.45 3.49 1.28 39.00
7,251.48 31,052.24 17,392.00 3.36 3.72 40.00
2,493.66 70,152.79 36,114.05 3.97 41.00
4,511.86 35,865.21 2.92 42.00
18,126.38 37,952.19 26,127.78 3.84 0.84 43.00
4,737.21 1,945.22
42U 147.26 3,100.10 8,800.00 1.54 HIGHWALL 14.35 36,681.37
35.00
- 30,734.59 44.00
1.33 5,886.49 45.00
13.02 60.29 TOTAL 37,282.18 384,973.09 SR 10.33
B536
Reserve Pit B2A
Reserve Pit B2A
Reserve Pit B2A
OB Coal
SR : 25.47
: 219,290 BCM
: 8,610 MT
Section
PIT B536
Parameter Design Pit:
40 42 43
42 43
Legenda
Bdy Design Toe Crest Design Road
A
B
C
D
41
43 42 40
40 41 39
39
Section
DISPOSAL B536 Legenda
Bdy Design Toe Crest Design Road
A
Section
PIT B2A
Legenda
Bdy Design Toe Crest Design Road
Parameter Design Pit:
Height bench = 10 m Width bench = 5 m
Single slope = 45 degree
Overall Slope = 38 degree
Grade road = 8-10%
RL Target = 76 M/L
A
B
1AU 1AL
1AU1AL
Section
DISPOSAL B2A Legenda
Bdy Design Toe Crest Design Road
Parameter Design Pit:
Height bench = 10 m Width bench = 5 m
Single slope = 45 degree
Overall Slope = 38 degree
Grade road = 8-10%
RL Target = 70 M/L
A
B
C
D
B10
B10
B10
B10
Section
PIT B2A
Legenda
Bdy Design Toe Crest Design Road
Parameter Design Pit:
Height bench = 10 m Width bench = 5 m
Single slope = 45 degree
Overall Slope = 38 degree
Grade road = 8-10%
RL Target = 70 M/L
A
B
C10 CA
C10 CA
Section
DISPOSAL B2A Legenda
Bdy Design Toe Crest Design Road
DISTANCE
DISTANCE B536 Legenda
Bdy Design Toe Crest Design Road
Plan Distance Monthly Distance Vol OB
Bottom 1 1,572.87 162,916.04 Bottom 2 1,326.90 162,916.04 Highwall 1,434.16 36,712.10 1,448.29
Distance Sumproduct
DISTANCE
DISTANCE B2A Legenda
Bdy Design Toe Crest Design Road