Page 1 of 2 Architectural and Structural Metal Manufacturing Quotation
1900 N Austin Ave, Chicago, IL 60639
402496 F
Phone (773) 639-5289
Date: Rev
www.csfcompany.com October 31, 2024
-
Click or tap to enter a date.
-
Click or tap to enter a date.-
PROPOSAL
Click or tap to enter a date.-
Attention: Mr. Joe W Wright Project:
Contractor
: MBA ENERGY & INDUSTRIAL
CARGILL BIO INDUSTRIAL -CONTROL ROOM ADDITIONAddress: 33126 Magnolia Circle 12201 S Torrence Ave
Magnolia, TX Chicago, IL
77354 60617
We propose to furnish Misc. Structural Steel and Misc. Architectural Metal for the above-referenced project. Our price to perform the Base Scope of work is $365,500.00 (tax included). The scope of work is as follows:
BASE BID
Item Scope Description Location Material Grade Finish Surface
Preparation
Engineering and calculation
1
Annex Structural Steel Framing
Furnish only structural steel framing at (1) locations
Reference Detail: N/A Reference Sheet: N/A
Exterior Carbon steel Per spec Shop
Primed
SSPC
SP2/3 Excluded
2
Annex Architectural Metal
Furnish only stair at (4) locations
Incl. (200) lineal feet of (2) line pipe guardrail at annex roof – finish to be HDG
Reference Detail: N/A Reference Sheet: N/A
Exterior Carbon steel Per spec HGD ASTM 123 Excluded
Construction Documents as noted below are used in this proposal
Discipline Issuance Date REMARK
1 Strcuctural Issued for Approval
September 17, 2024Project Specific Inclusion:
1. Durations: TBD
2. Labor escalation through 5/31/2025.
3. Shop Drawings for approval by AoR/EoR Project Specific Exclusions:
4. Material escalation, Permits of any kind, street closure and associated works 5. Hoisting and material handling included for erection.
6. Field measurements and Verification
7. Hoisting and material handling included for erection.
Project Specific Qualification
8. Power Supply of 220V/480V 3-Phase w/ min 30 Amp Breaker for (2) welder to be by others.
9. Our pricing is based on free and clear access Payment / Billing Terms:
10. TBD
This quote is valid for 15 days.
Thank you for the opportunity to quote this work.
Sincerely, [email protected]
Maury Rastegari Mobile #: (312) 451-9621
Direct #: (773) 639-5289
⁜ Structural Steel ⁜ Architectural Metal ⁜ Miscellaneous Metal ⁜ Glass&
Glazing ⁜
⁜ Ornamental Iron ⁜ Custom Fabrication ⁜
Page 2 of 2 Architectural and Structural Metal Manufacturing Quotation
1900 N Austin Ave, Chicago, IL 60639
402496 F
Phone (773) 639-5289
Date: Rev
www.csfcompany.com October 31, 2024
-
Click or tap to enter a date.
-
Click or tap to enter a date.-
PROPOSAL
Click or tap to enter a date.-
Exhibit A Term and
Conditions Qualifications
All unknown dimensions and connections should be identified through RFI procedure or a bulletin prior to CSF detailing. Labor escalation through 5/31/2023.
Price of Material is based on current prices. Significant escalation (>2%) during performance of contract is not included Substrate to be ready prior to mobilization.
Access to each floor is provided by GC through elevator, skip, ramp, or other means, as required by CSF. (1) Coat Standard Shop Primer if stated Substrate Removal and cut back should be sufficient to facilitate installation of the steel and provide an unimpeded access All work is considered straight time
CSF is not responsible to protect existing or new elements while erection is in progress and all protection is by others Free & Clear access to allow for conventioanl erect/install methods Price is based on free and clear access required to allow for conventional installation practices All demolition should be completed prior to CSF’s required V.I.F All field welds will be coated and protected either with Cold Galvanizing Compound Spray or with Spray Paint or brush applied paint.
Due to extreme volatility in the metals market, price is subject to review and adjustment at time of release Bidding only Structural steel which is specifically called in structural drawings. (If applicable.) All MEP, Sprinklers, conduits, and any sort of obstruction will be removed prior to erection by others.
Shakeout area, material storage area should be provided by GC on the designated floors/locations adjacent to line item scope
Work in nature is considered load and noisy and, due to welding, it could be smoky. CSF will try to mitigate as much as possible the level of noise and fume but cannot guarantee a noise and smoke-free workplace.
Price is based on the current set of bid drawings, supplied CSF-ASK drawings, and is not pre-engineered. If calculation requires additional material other than shown on the drawing or heavier sizes, CSF will be-
'-entitled to additional compensation.
Exlusions
Buy American requirement VISION-LITE Glass Engineering and stamped calculation UNO Weldability Testing
Weather protection Extended warranty Any item not mentioned in this proposal Load Testing
WBE, DBE, and MBE Material Escalation Survey to establish project control lines Fire proofing removal
Chicago Residency Existing condition survey Layout for demolition to reach substrate Fire proofing patch and repair
Premium time UNO Stamped shop drawings Layout for demolition to facilitate CSF work Low Iron glass requiremnet
Permit of any kind Fire Rated material Verification of floor capacity to use equipment Code
compliancy
Liquidated Damage Partial/Full-Size mockup Layout of BMs, control point, and control line Delegated design UNO
Pigtail/ electrical hookup Survey to establish project BMs Resposibility of (E)Conditions, Known/Unknown Coordination between trades Power Supply Field quality control of any kind Protection of adjacent building element Protection of floor and building elements AESS Steel UNO. Scaffolding, Shoring, and Bracing Furniture moving and content manipulation Tie off point and safety anchorage AISC Certification Relocation/removal of obstructions Engineering review of (E) framing to which CSF Scope is
secured Textura Invoicing and Payment system
Zinc Rich Primer UNO Trapeezing around any existing
MEP Sanding, grinding and any prep work to apply top coat/finish coat.
Any grouting UNO All demo of any kind is by others Grinding and blending weld joints with adjacent surfaces.
Additional effort, equipment, and design change due to sagging deck that prevents installation of support steel to line up with (E) steel and flush with the underside of deck w/conventional methods.
All GPR, X-ray, scanning to locate embedded items (i.e. reinforcing bars, conduits, plumbing, etc. ) CSF work includes anchoring to substrate‐ CSF will not perform any scanning to locate embed items in concrete‐
CSF will be entitled to additional work in case of hitting any reinforcement in the concrete due to complexity and being time-intensive to cut thru rebar.
If this case happens, CSF foreman will inform the GC superintendent for tracking of additional time.
⁜ Structural Steel ⁜ Architectural Metal ⁜ Miscellaneous Metal ⁜ Glass&
Glazing ⁜
⁜ Ornamental Iron ⁜ Custom Fabrication ⁜