No. Material Bangunan Harga Jumlah A. Material Aksesoris Distribusi Air
1 Pipa Overflow 2" 6 join
2 Pipe Outlet 3" + Drain 6 join
3 Elbow 2" X 90° 40 ea
4 Valve 2" X 2" 16 ea
5 PVC Pipe A", 2" X 13' 12 join
6 Large Radius T 2" X 2 " x 2" 20 ea
7 Gate Valve 2 " X 2 " 20 ea
8 Pipa PVC 3 " X 4 20 ea
9 Klem PVC 2 " 20 ea
10 Gate Valve 3 " X 3 " 20 ea
11 Pipa PVC 2" 80 join
12 Pipa PVC 1/2 " 80 join
13 Pipa PVC 3/4" 30 join
14 Overshoke 1" to 3/4" 20 ea
15 Elbow 1/2" x 90° 30 ea
16 Elbow 1" x 90° 40 ea
17 Elbow 3/4" X 90° 30 ea
18 Kran Plastik 1/2" 40 ea
19 Glue 30 can
20 Teplon T 15 roll
21 Shock Drad Luar 1" x 1" 20 ea
22 Shock Drad Dalam 1" x 1" 20 ea
23 Klep Pipa hisap Pompa 10 ea
24 Pulpe Plastic 1" 10 ea
25 Pulpe 1/2" X 1/2" 50 ea
26 Shock 1/2" x 1/2" 20 ea
27 Shock Drad Luar 1" 10 ea
28 Shock Drad Dalam 1" 10 ea
29 Pipa PVC 3" x 13 40 join
30 Elbow 3" X 90° 20 ea
31 Elbow 3" X 45° 20 ea
32 Large Radius T 3" X 3 " X3" 20 ea
33 Ball Valve 3" x 3" 20 ea
34 Shock Drad Luar 3" x 3" 20 ea
35 Shock Drad Dalam 3" x 3" 20 ea
36 Shock drad dalam 1/2" x 1/2" 15 ea
37 Gergaji besi 10 ea
Quantity Petrogas (Basin) Ltd.
Rencana Anggaran Biaya PPM Infrastruktur 2023 - Fasilitas Air Bersih Kampung Sakarum Distrik Seget - Kabupaten Sorong
38 Mata Gergaji besi 1 pak B. Material Sanitasi dan Tower Air
1 Jaring Puri 20 mtr
2 Bantal Dakron 2 ea
3 Arang Aktif 2 can
4 Profi Tank 5000 liter 1 ea
5 Profi Tank 1200 liter 1 ea
6 Plat Besi 15 mtr
C. Pekerjaan Rumah Mesin & Mesin Pompa
1 Seng 15 sheet
2 Semen 30 zak
3 Paku Seng 7 kg
4 Selang Alcon 1 roll
5 Pompa Alcon 1 ea
6 Cable standart SNI 1 roll
D. Pekerjaan Penyelesaian Akhir
1 Cat Minyak (hijau) 5 liter 6 can
2 Cat Meni 6 can
3 Kuas 4" 8 ea
4 Kuas 3" 8 ea
5 Kuas 2" 8 ea
Total -