DECREASING TOTAL AMOUNT OF DEFECT CARS AT THE RECTIFICATION Page 99 of 118 AREA BY IMPROVING REPARATION PROCESS. A CASE STUDY AT PT.XYZ
Heinrich Putra
REFERENCES
Andersson, S. (2007). In Implement Lean Production in Small Companies.
Becker, C., & Scholl, A. (2006). European Journal of Operational Research. In A survey on problems and methods in generalized assembly line balancing.
Bedworth, D., & Bailey, J. (1987). Integrated Production Control System. John Wiley &
Sons.
Bradley, E. (2016). Reliability engineering : a life cycle approach. Boca Raton : CRC Press.
Ford, H., & Crowther, S. (1922). My Life and Work. New York: Garden City.
Heymans, M. I. (2000). Collaborating for Change: Gemba Kaizen. San Francisco:
Berrett-Koehler Publishers.
Ishikawa, K. (1968). Guide to Quality Control. Tokyo: JUSE.
Li, J., Blumenfeld, D., & Marin, S. (2007). Manufacturing system design to improve quality buy rate: an automotive paint shop application study. IEEE Trans Autom Sci.
Masaaki, I., & Heymans, B. (2000). Collaborating for Change: Gemba Kaizen. San Fransisco: Berrett-Koehler Publishers.
Micieta, B., & Stollmann, V. (2011). Assembly Line Balancing. In DAAAM International Scietific Book. Vienna.
Nils Boysen, M. F. (2007). In Assembly line balancing: Which model to use when?
OICA, O. I. (2018). In 2017 Production Statistics. Paris.
Ohno, T. (1988). Toyota Production System: Beyond Large-Scale Production.
Cambridge: MA: Productivity Press.
Ortiz, C., & Park, M. (2010). Visual Controls: Applying Visual Management to the Factory.
OSHA. (1974). Safety Sign Systems.
Rae, J. B., & Binder, A. K. (2017). In Automotive Industry.
Tague, N. R. (2005). Plan-Do-Check-Act cycle. Milwaukee : ASQ Quality Press.
Weeden, M. M. (1952). Failure mode and effects analysis (FMEAs) for small business owners and non-engineers : determining and preventing what can go wrong.
Womack, J. P., Roos, D., & Jones, D. T. (1990). The Machine That Changed the World.