RESERVOIR OPERATION

Water Engineering 2

(2)
(3)

DEFINITION SKETCH OF

RESERVOIR STORAGE VOLUMES

(4)

SPILLWAY CAPACITY

HYDROLOGICAL DATA

 DETERMINE FLOOD AND DROUGHT FLOWS

TO DETERMINE THE REQUIRED CAPACITY

AND OPERATING PROCEDURE FOR THE

RESERVOIR.

(5)

SPILLWAY DAMAGE

(6)
(7)
(8)
(9)

OROVILLE

DAM

(10)
(11)

+ 4.4

Billion CM

(12)
(13)

RESERVOIR OPERATION STUDY

EXAMPLES

(14)
(15)
(16)
(17)

3D DEM Bendungan Jatigede

(18)
(19)
(20)
(21)
(22)

CONSERVATION OF MASS

In Reservoir Operation

(23)

Bln Awal Periode Volu meAli

ran Masu

k (m3)

Volu me Air di

Dala m Wadu

k Total

Kebutuhan Air Selama Periode ybs Akhir Periode Volu me Meli mpas

(m3)

Eleva si MA

Hilir

Efekt if Beda

TMA (m)

Debit (m3/

dtk)

Rege neras

i

Ener gi Pote nsial

P = 7,4 QH Eleva

si MA Wadu

k (m)

Volum e Tamp ungan

(m3)

Luas Gena ngan (m2)

Air RT Air

Irigasi Pengu

apan Kebut uhan Lainn

ya (bila ada)

Total Eleva si MA Wadu k (m)

Volum e Tamp ungan

(m3)

Luas Gena ngan (m2)

(1) (2) (3) (4) (5) (6) =

(3)+(

5)

(7) (8) (9) (10) (11) =

(7)+(

8)+(9 )+(10

)

(12) (13) (14) (15) (16) (17) (18) (19) (20)

TABEL PERHITUNGAN

PENGOPERASIAN WADUK

Kolom 1 : Bulan dimulai dari awal musim penghujan : Oktober

(24)

Gambar

TABEL PERHITUNGAN