RISK ANALYSIS OF DAMAGE TO DOOSAN GV180 MACHINE USING FMEA METHOD TO IMPROVE

PREVENTIVE MAINTENANCE PERFORMANCE 750 RUNNING HOURS IN PLTMGPT. BIMA GOLDEN

POWERINDO SITE MELIBUR

Student name : Abdul Wahid Muharram

NIM : 2204161107

Examiner : Razali, ST., MT

ABSTRACK

The reliability of a power plant is the ability of an equipment or electrical component to carry out its operating functions at certain time periods and operating conditions. So that it can produce electricity and be able to serve electricity supply to consumers. To support this reliability, decision support and risk analysis systems are used that can identify potential causes and impacts of damage to power plant components using FMEA. By using this system, the priority of equipment maintenance will be obtained based on the value of the RPN. High equipment reliability is obtained with planned maintenance support through preventive maintenance methods. Preventive performance and FMEA, measured based on performance targets set by the company. The results of the highest RPN value in PLTG namely valv in / exe (180) and sparklup (140) are expected to be the company's evaluation material to improve the reliability and appropriate risk treatment in operational activities of the power plant.

Keywords: Risk analysis, FMEA, the performance, preventive maintenance

Referensi

Dokumen terkait

III Thesis Title Legal Measures for Controlling Business Operator and Professional to Guarantee the Risks associating with Business Conduct That May Cause Damage to the State and the

The order of priority for the care and maintenance of the Alfamidi Minimarket Building in Malang is as follows: Alfamidi Dieng, Alfamidi Bandulan, Alfamidi Lake Toba, Alfamidi Simpang

With the increasing number of vehicles it is possible that the road will suffer damage in a relatively short time .The purpose of this study was to determine the effect of the volume of

The results showed that the types of damage to Besuki Na-Oogst tobacco leaf classified as having a high-risk impact were perforated leaves, oily leaves, white spots, blue spots, and